2027PS001 - Campus-Wide Fire Alarm System Replacement

Description

The Ontario International Airport is seeking a bidder to design, construct, permit, install, retrofit and replacement of the existing campus fire alarm systems at the Ontario International Airport located at 2900 E. Airport drive, Ontario California. Scope of Work This is the detailed description of the Scope of Work, including objectives, tasks, deliverables, and any specific requirements relevant to this project. Successful vendor will be responsible for the following: General Description The Ontario International Airport Authority (OIAA) is soliciting bids from qualified contractors for the campus-wide replacement of existing fire alarm systems serving 29 facilities at Ontario International Airport (ONT) and the establishment of centralized fire alarm monitoring within the Airport Control Center (ACC). The project will provide fully addressable, code-compliant, non-proprietary fire alarm systems connected through the existing campus fiber optic network. The centralized system will receive fire alarm, supervisory, and trouble notifications from connected facilities. Work includes furnishing the labor, materials, equipment, and services necessary for system replacement, integration, testing, and commissioning in accordance with the Contract Documents. The completed systems shall accommodate future campus expansion, and fire alarm protection shall be maintained throughout construction. Project Overview and General Requirements The OIAA is proceeding with a campus-wide fire alarm replacement and will establish centralized fire alarm monitoring for 29 facilities. The centralized monitoring system will be located within the Airport Control Center (ACC). All fire alarm control panels (FACPs) shall communicate with the ACC FACP through the existing campus fiber optic network infrastructure. Fire alarm network communications utilizing the existing campus fiber optic network infrastructure shall be coordinated with OIAA Information Technology personnel and comply with OIAA network and cybersecurity requirements. The ACC shall receive all fire alarm, supervisory, and trouble notifications from connected facilities. Fire alarm signals must continue to be transmitted to a third-party 24-hour UL-listed monitoring service in accordance with applicable California Building Code requirements. Direct notification to the Fire Department is not required provided that approved third-party monitoring is maintained. The replacement system shall be designed as a non-proprietary system and shall provide the capability for future expansion. The design shall accommodate future connections to Terminal 3, future parking structures, central utility plants, and other future airport developments. Junction boxes and other infrastructure necessary to facilitate future expansion shall be provided throughout the campus where appropriate. Continuous fire alarm protection must be maintained throughout construction. Where fire alarm systems must be temporarily impaired, provide temporary protection measures, fire watch personnel, and impairment procedures in accordance with NFPA standards and OIAA operational requirements. The Contractor must provide a new centralized fire alarm monitoring system located within the Airport Control Center (ACC) that is fully compliant with CBC, CFC, OIAA, and insurer requirements. The centralized monitoring system must: Monitor all campus fire alarm systems described in the previous section Include all network hardware, software, servers, gateways, and interfaces necessary for a complete operational system Provide reporting and event history capabilities Maintain operation during communication failures in accordance with NFPA 72 requirements For each facility the Contractor must perform: Integrated system testing Acceptance testing Fiber network testing Final commissioning Testing shall be performed in accordance with NFPA 72 and applicable California codes. The proposed replacement will provide new, fully addressable, and code-compliant systems designed for long-term supportability. The upgraded systems must also be compatible with the fire alarm system to be installed at the ACC, enabling seamless integration for centralized monitoring and coordinated campus-wide life safety operations. Contractor provides licensed Fire Alarm Designer/Engineer. Design must be prepared, signed and stamped as required. Contractor is responsible for permit-ready and construction documents. The OIAA review does not relieve Contractor of design responsibility. The Contractor is responsible for corrections/revisions required by AHJ. All costs associated with Permit fees, Plan-check fees, Re-submittals, Fire Marshal inspections Testing, Corrections, Final approval Certificate/approval documentation is part of the contractor scope. The Airport reserves the right to proceed with all, or a portion of the work based on the availability of funding. The Airport may elect to phase, reduce, defer, or otherwise modify the scope of work as necessary to remain within available funding. The Contractor shall coordinate with the Airport regarding any such changes and shall provide pricing for individual bid items or work components as requested. Specs or Service Requirements Please see: Attachment_A_Technical Specifications Attachment OIAA - General Conditions - 2027PS001 Campus Wide Fire Alarm Replacement Attachment OIAA - Special Provisions - 2027PS001 Campus Wide Fire Alarm Replacement Attachment_D-Cost_Proposal OIAA Ontario Airport Fire Alarm Acceptance Criteria Contractor meeting all the requirements of the contract documents, including contract, plans, specifications, Minimum Qualifications. Minimum Contractor License qualifications: Class A General Engineering Contractor Class B General Building Contractor C-10 Electrical Contractor C-16 Fire Protection Contractor At the time of bid, the Contractor must possess a valid contractor license with one of the above classifications. The Contractor's failure to possess the specified license shall render the Bid as non-responsive and shall act to bar award of the contract to any Bidder not possessing said license at the time of bid, unless exempted by federal or state law. Contractors must demonstrate successful experience performing airport, campus-wide, or similarly complex fire alarm replacement projects. The contractor must employ personnel with current NICET Level-III Fire Alarm Systems certification or hire who will be directly responsible for system design oversight, installation supervision, testing, and commissioning. Work Plan Construction documents which include specifications and plans outlining and describing the work can be found in the Attachments section of this IFB. Anticipate Contract Term Proposers should anticipate entering into an agreement with the OIAA for a term of 2 years in the third quarter of the 2026-2027 Fiscal year. Introduction Summary Background Contact Information Timeline Agency Background The Ontario International Airport Authority (OIAA) is a joint-powers authority (JPA) formed between the City of Ontario and San Bernardino County as a public agency in Southern California. The OIAA Commission consists of five appointed members. The OIAA is the owner and operator of Ontario International Airport (ONT). ONT is a medium hub airport serving more than 6.4 million passengers per year and is a major air cargo facility in Southern California, with more than 750,000 tons being carried to and from the airport each year. Pre-Bid Meeting - Virtual A non-mandatory Pre-bid Meeting will be held virtually via Microsoft Teams Webinar on the date and time listed in the “Timeline” section of this solicitation. The meeting will be conducted in Pacific Time (PT). The OIAA strongly recommends that at least one (1) member of each proposing firm attend, as pertinent information regarding the solicitation and anticipated services may be discussed.Registration is required to attend the Pre-bid Meeting. Firms must register using the link below. Upon registration, participants will receive the meeting access link and additional details. Microsoft Teams Webinar Link: https://events.gcc.teams.microsoft.com/event/ca7f6fc5-4dbf-48a6-9a63-8ac0e89085f0@726bed49-7011-47d7-8024-49cdc0e9cae8 Job Walk A Job Walk will be held on the date and time listed in the "Timeline" of this solicitation. Attendees shall meet at the following location: 1923 E Avion St., Ontario CA, 91761 The group will depart promptly at 11:00 a.m. Please arrive by 10:45 a.m. to allow time for check-in. The Job Walk may include visits to the following facilities, but is not limited to: Terminal 2 Terminal 4 CONRAC FIS The OIAA highly recommends that at least one (1) member of your team attend this Job Walk as pertinent information regarding the project will be shared. Registration The deadline to register for the Job Walk is September 30, 2026, at 5:00 p.m. Pacific Time. Each attendee must register individually through the Eventbrite link below. Multiple representatives from the same firm may attend, provided each person registers. A confirmation email with details will be sent to each registrant. Regisration link: Job Walk - 2027PS001 - Campus-Wide Fire Alarm System Replacement Security Requirements Attendees may be subject to security screening. Backpacks are discouraged and may be searched if brought to the Job Walk. Attendees who do not comply with security screening requirements may not be permitted to participate. Only registered attendees will be allowed to participate in the site visit. All attendees must have a valid government-issued photo ID in their possession at all times during the Job Walk (e.g., DL, U.S Passport, etc.). Attachments Bid Instructions All interested vendors are required to submit all bids/proposals and questions electronically through OpenGov by the deadline listed above. Use " 2026-IFB-086 - 2027PS001 - Campus-Wide Fire Alarm System Replacement " as the subject line for all submissions. Hard copies will not be accepted. All submissions must be in the following format: Portable Document File (PDF) While there is no formal file size limit, larger files may result in longer upload times. We recommend keeping files sizes to 15MB where possible. OIAA may choose to print your submission, paper size should not exceed 8.5-inch by 11-inch. The main body fonts must be a minimum of 12 points, figure captions and callouts may use smaller fonts. A one-page cover must state the " 2026-IFB-086 - 2027PS001 - Campus-Wide Fire Alarm System Replacement " and include the prime firm name, contact person name, direct telephone or mobile phone number, and email address Page count should not exceed thirty (30) pages. (Excluding the Administrative Requirement documents) (Failure to include this information on the cover may result in disqualification). Submission Instructions Bid Form and Schedule of Work and Prices The bid must state the amounts for which the bidder proposes to supply all material and perform all work required by the Contract Documents. The Unit Price shall be provided in words, and Total Price shall be written in figures. The Project Total shall be written in words and figures. All blank spaces in the bid must be properly filled in, and the phraseology must not be changed. Modifications are not permitted. Any space left blank, any unauthorized addition, change, condition, limitation or provision attached to the bid may render it non-responsive and may cause its rejection by the OIAA. Alterations by erasure or interlineations must be explained or noted on the bid over the signature of the bidder. No telegraphic modification of a bid will be considered. Bidders must acknowledge receipt of all addenda in the space provided. The bid shall meet all of the requirements set forth herein. List of Subcontractors In accordance with the California Subcontractor Listing Law, a list of all subcontractors is required to be submitted with the bid on the form titled List of Subcontractors provided by OIAA. The list of subcontractors who are assigned a portion of the work in an amount in excess of one-half of one percent of the prime’s bid shall comply with the requirements of California Public Contract Code (PCC) § 4100 – 4113 (the Subletting and Subcontracting Fair Practices Act). Minimum Qualifications (Prime Bidder’s Experience) Minimum Qualifications and Licensing Requirements: 1. Campus-Wide Fire Alarm Replacement Experience The Prime Bidder/Proposer shall have successfully completed a minimum of three (3) campus-wide fire alarm replacement projects within the past ten (10) years. Each project shall have included the replacement, modification, or upgrade of fire alarm systems across multiple buildings or facilities and shall have been completed within the past ten (10) years. The Prime Bidder/Proposer shall submit documentation demonstrating compliance with these minimum experience requirements with its Bid/Proposal. The documentation shall identify, at a minimum, the project name and location, owner, contract amount, scope of work, completion date, and the Prime Bidder/Proposer's role in the project. 2. Joint Venture Qualifications If the Bidder/Proposer is a Joint Venture, the Joint Venture entity shall demonstrate compliance with the Minimum Qualifications stated herein and shall submit the required project experience documentation. Alternatively, a Joint Venture may satisfy the experience requirement if each individual Joint Venture member submits its qualifying project experience, and at least one (1) Joint Venture member independently meets all applicable Minimum Qualifications. Experience obtained solely as a subcontractor shall not be used to satisfy the Prime Bidder/Proposer experience requirement unless specifically approved by the Airport in the solicitation documents. 3. Contractor Licensing The Prime Bidder/Proposer shall hold and maintain valid and active California contractor licenses in the classifications applicable to the Work, including: Class A – General Engineering Contractor Class B – General Building Contractor C-10 – Electrical Contractor C-16 – Fire Protection Contractor The Prime Bidder/Proposer shall self-perform a minimum of thirty-five percent (35%) of the total Project Work. All subcontractors shall possess the appropriate and valid California contractor license classification(s) required for the work they perform. Failure to satisfy the Minimum Qualifications or to possess the required California contractor license(s) shall result in the Bid/Proposal being deemed non-responsive and subject to rejection, in accordance with applicable California law, including California Business and Professions Code Section 7028.15(e). Format Signing of Bid By signing the bid, the bidder is stating: 1) the facts represented in the bid are true and correct, 2) the bidder provided accurate contact information including telephone number(s) and e-mail address, and 3) the signer has authority to sign on behalf of the contracting entity. Only One Bid Accepted The OIAA will accept only one bid for this NIB from any one bidder. This includes bids submitted under different names by one firm, corporation, partnership, or joint venture. Evidence of collusion among bidders shall be grounds for exclusion of any bidder who is a participant in any such collusion. Joint Ventures or Partnerships If the bidder is a partnership or joint venture, the bidder must submit, with its bid, a copy of the partnership or joint venture agreement. That agreement must describe the scope and amount of work each participant will perform and contain a provision that each participant will be jointly and severally liable to OIAA for completing all of the work and to third parties for all duties, obligations and liabilities which arise out of the joint venture’s performance of the work. Each member of the joint venture or partnership must respond to all elements of the Administrative Requirements separately, and a copy of each joint venture or partnership agreement must be included with the Administrative Requirements Forms. Cost of Bids OIAA is not responsible for any costs incurred by bidders while preparing or submitting bids. All bidders who respond to solicitations do so solely at their own expense. Withdrawal of Bids At any time prior to the Bid Opening Deadline, a bidder may withdraw, revise, modify, or change their bid. The bid will be returned un-opened. A bidder may not withdraw its bid submittals for one hundred and eighty (180) days from the date bids are due, or until after a contract for the work described in these bid documents is fully executed by OIAA, whichever date is earlier. Administrative Requirements Bidders/Proposers must complete and submit the following signed documents with their proposal/bid. The following items are required to be submitted with all proposals/bids: Small Business Certifications (or “N/A” if not applicable) Small Business & Subcontractor Letter of Intent (LOI) List of Subconsultants (Bidder's List Collection Form) Affidavit of Non-Collusion -This form must be notarized prior to submission. Failure to provide a notarized version may result in disqualification. Conflict of Interest Disclosure Form Confidentiality and Non-Disclosure Form Supplier Information Form W-9 Form Prime Bidder Experience Form NOTE: Failure to submit the required forms or failure to include the acknowledgments as instructed in the forms may render the bid/proposal non-responsive and may result in its rejection. Bid Evaluation and Awarding Information Requested and Not Furnished The information requested and the manner of submission is essential to permit prompt evaluation of all bids. Accordingly, OIAA reserves the right to declare as non-responsive and reject any bids in which information is requested and is not furnished or when a direct or complete answer is not provided. Right to Verify Information OIAA reserves the right to verify all submitted information, including contacting the referenced clients. All information stated in the bid shall be factual, truthful and shall not be misrepresented in any manner. Any information stated in the bid found to be a misrepresentation of past experiences shall be considered as grounds for disqualification of the bid. Evaluation of Bids and Bid Errors The bidder is liable for all errors or omissions committed by bidder in preparing the bid and for any consequences due to the errors or omissions. Bidders will not be allowed to alter, correct, or amend bid documents after the due date and time of submission. Mathematical Corrections on Bids In the case that the amount listed in the Total Price is not the correct sum of the Unit Price multiplied by the Quantity, the Unit Price amount shall govern and the Total Price will be corrected. An exception to this is if, in the view of the OIAA, the Total Price is clearly and obviously correct, the Unit Price is clearly and obviously incorrect, and the intent of the bidder is clear and obvious, then the Unit Price will be corrected and the Total Price unaltered. In either case, the Project Total amount will be adjusted accordingly. If the Project Total amount listed is not the correct sum of the Total Price, the Total Price shall govern, and the Project Total will be corrected accordingly. In the case that the amount listed in the Unit Price of a Bid Alternate identified as “Must Match Base Bid Unit Price” does not match the Unit Price of the Base Bid, the Base Bid Unit Price amount shall govern, and the Total Price will be corrected along with the Project Total amount accordingly. Incorrect Bid Information If OIAA determines that a bidder has provided incorrect information for consideration in the evaluation process, which the bidder knew or should have known was materially incorrect, that bidder may be deemed non-responsive and the bid may be rejected. Prohibition of Alt

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #1: Presentation and Attendance Report from the Pre-Bid Meeting · 1

    In this notice are the Attendance Report and Presentation from the Pre-Bid Meeting.

  • Official Notice #2: Attendance Report from the Job Walk · 2

    In this notice is the Attendance Report from the Job Walk.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Please use the See What Changed link to view all the changes made by this addendum. Section 1.4 Timeline: The Bid Submission Deadline has been extended as follows: Original Deadline: October 26, 2026, at 2:00 PM Revised Deadline: November 9, 2026, at 2:00 PM

  • Addendum #4 · 4

    Please use the See What Changed link to view all the changes made by this addendum. Section 1.4 Timeline: The Bid Submission Deadline has been extended as follows: Previous Deadline: November 9, 2026, at 2:00 PM Revised Deadline: November 23, 2026, at 2:00 PM Attachments Section: The following attachments have been updated or added: Updated: Attachment C - OIAA Special Provisions Updated: Attachment D - Cost Proposal Added: Attachment K - OIAA Security Systems Standards

  • Addendum #5 · 5

    Please use the See What Changed link to view all the changes made by this addendum. A. Changed: A - Attachment_A_Technical Specifications To: A - Attachment_A_Technical Specifications Rev1 B. Uploaded the following Attachments: L - 2025 FA Annuals M - Admin East 1 N - FED. INSPECTION SERVICE FACILITY O - Fire Station P - GROUND TRANSPORTATION CENTER - RECORD DRAWINGS Q - POLICE SERVICES MODULAR BUILDING R - Terminal 1 S - Terminal 2 and 4 C. The OIAA hereby amends all previously published responses in the OpenGov "Question & Answer" section that contain the following language: "Limited as-built documentation is available; however, OIAA will provide all existing as-built drawings upon request. Most buildings contain exposed conduit systems and a limited number of fire alarm devices. The Contractor shall perform a detailed field survey upon award of the contract to verify existing conditions and develop the final design." The available as-built drawings have been uploaded as attachments to this Addendum and are being made available to all interested bidders simultaneously to ensure equal access to information. The OIAA does not intend to provide any additional as-built drawings beyond those included in this Addendum. This Addendum supersedes the previously published statements regarding the availability and distribution of as-built drawings in the OpenGov "Question & Answer" section. All other portions of those responses remain unchanged.

  • Addendum #6 · 6

    Please use the See What Changed link to view all the changes made by this addendum. Section 1.4 Timeline: The Bid Submission Deadline has been extended as follows: Previous Deadline: November 23, 2026, at 2:00 PM Revised Deadline: December 7, 2026, at 2:00 PM Attachments Section: The following attachments replace their previously issued versions: A - Attachment_A_Technical Specifications - Rev2 Revises Appendix A to establish minimum qualifications, required qualification documentation, and acceptance criteria. C - Attachment C - Special Provisions - 2027PS001 Campus-Wide Fire Alarm Replacement - Rev2 Revises Section 16 - “Removal of Asbestos and Hazardous Substances.” D - Attachment D – Cost_Proposal OIAA Ontario Airport Fire Alarm v4 Revisions include updates to the pricing schedule, the addition of a $150,000 allowance for hazardous materials investigation and testing, and revised fire alarm panel descriptions to reflect the non-proprietary system requirement. Bidders shall review Attachment D, provided with this addendum, in its entirety and use this version to prepare and submit their bid pricing. Additional Revisions and Clarifications Hazardous Materials A $150,000 allowance has been included in the Cost Proposal Sheet to cover hazardous materials investigation and testing for the 29 airport buildings. The Contractor shall be responsible for coordinating and performing the required investigation and testing. If asbestos or other hazardous substances are identified, any required removal or remediation shall be performed by the Contractor as part of this contract, with associated costs tracked and compensated on a time-and-materials basis, subject to OIAA's review and approval. The Contractor shall comply with all applicable regulatory requirements and the notification and work suspension procedures outlined in the Special Provisions upon encountering suspected asbestos or hazardous substances. Future Expansion The fire alarm system shall be designed with flexibility and scalability to accommodate potential future airport expansion. The design shall consider the ability to connect additional buildings and facilities to the existing system, where technically feasible. Specific requirements for future expansion will be determined as part of the design of future projects. Future expansion scope is not included in the current project. Non-Proprietary Fire Alarm System Requirements The project requires a non-proprietary fire alarm system.

  • Addendum #7 · 7

    Please use the See What Changed link to view all the changes made by this addendum. Section 10 - Administrative Requirements, Subsection 12.2 - Bid Price: The Cost Proposal attachment in this section has been replaced with Attachment_D-Cost_Proposal OIAA Ontario Airport Fire Alarm v4 to ensure consistency with the version provided in the Attachments section.

Public questions and answers
  • What's the owner/engineer's estimate?

    Owner/Engineering estimate is not available.

  • What does the inside of your fire sprinkler system look & smell like ? Have you replaced any pipes ?? NFPA gave it a name (Microbial influenced corrosion) Code compliant treatment programs check out the web site www.huguenotlabs.com

    The work does not anticipate changes to the fire sprinklers; however, some buildings may require modification to the sprinkler system to allow monitoring by the fire alarm system.

  • 1. The specifications state that the system must be non-proprietary, such as FireLite. Will proprietary Fire Alarm Systems such as Honeywell XLS4000 be accepted? Project size and complexity dictates off-the-shelf non-proprietary systems will likely not be sufficient from a hardware standpoint.

    No. OIAA requested a non-proprietary solution.

  • Please confirm whether existing as-built drawings are available for this facility that can be used as the basis to complete the fire alarm system design.

    Limited as-built documentation is available; however, OIAA will provide all existing as-built drawings upon request. Most buildings contain exposed conduit systems and a limited number of fire alarm devices. The Contractor shall perform a detailed field survey upon award of the contract to verify existing conditions and develop the final design.

  • The building table lists Terminal 1 (approx. 140,000 sq ft, 3 stories) as Occupancy Group B, while Terminal 2, Terminal 4, GTC and FIS are listed as Group A-3. Task 3 specifies horn/strobe notification for Terminal 1 because it "is planned to remain largely unoccupied. Per CBC Chapter 3, waiting areas in transportation terminals are classified as Group A-3. If Terminal 1 is classified as A-3 with an occupant load of 1,000 or more, CBC 907.2.1 and 907.5.2.2 would require an emergency voice/alarm communication system rather than horn/strobe notification. Please confirm.

    Terminal 1 is currently being utilized as a movie production set and is expected to remain in that use. The space is not intended to function as an Assembly occupancy. Based on the current use, please provide a base bid for a horn/strobe fire alarm notification system, along with an alternate bid for a voice evacuation/mass notification system.

  • Will the project require complance with a Community Workforce Agreement or Project Labor Agreemnet for trades participating in the project ?

    The OIAA Community Workforce Agreement shall apply and is limited to all of the Authority's Project Work performed pursuant to a Construction Contract that exceeds $400,000.00.

  • To properly review, coordinate, and prepare our bid for the fire alarm scope of work, will the latest available existing/as-built drawings for the following disciplines be provided? 1. Architectural drawings 2. Mechanical/HVAC drawings 3. Fire alarm drawings 4. Fire sprinkler drawings Please provide the most current available as-built or record drawings for bidding and coordination purposes.

    Limited as-built documentation is available; however, OIAA will provide all existing as-built drawings upon request. Most buildings contain exposed conduit systems and a limited number of fire alarm devices. The Contractor shall perform a detailed field survey upon award of the contract to verify existing conditions and develop the final design.

  • Will the owner furnish Auto-CAD of the current architecture of all four buildings and existing fire alarm system plans to the awarded contractor?

    Auto-CAD files are not available.

  • Will a secure contractor lay down area for matterials be provided to the contractor at terminal 2 and terminal 4?

    Laydown area will be provided after coordination with OIAA.

  • Requesting an extension of 4-6 weeks for proposal due date

    Per Addendum #4, the bid submission deadline has been extended to November 23, 2026, at 2:00 p.m.

  • Will ONT extend the bid due date based upon Q&A?

    Per Addendum #4, the bid submission deadline has been extended to November 23, 2026, at 2:00 p.m.

  • Please confirm that City of Ontario Fire Department (OFD) will act as the Authority Having Jurisdiction (AHJ) for this project, for plan reviews, permits and inspections.

    Yes, City of Ontario Fire Department with act as Authority Having Jurisdiction.

  • Please provide drawings in AutoCAD *.dwg format for all 29 Facilities noted in the RFP. To generate a code compliant design, Architectural, Mechanical, Electrical Fire Alarm and Fire Sprinkler Drawings will be required.

    Auto-CAD files are not available.

  • Please elaborate on the current alarm monitoring and response procedures at ONT. Is a mass notification system required as part of fire alarm project?

    The system must provide notification and graphical display in the Airport Control Center (ACC), and any applicable Fire Control Rooms located in the building for the alarm that is being activated. Additionally, all alarms and notifications shall go to a 3rd party UL 24/7 monitoring center for their notifications to fire and the airport. The system shall provide a fire alarm evacuation system in accordance with the applicable requirements of the California Building Code (CBC) and NFPA 72. The system shall include all required notification appliances, controls, and features necessary to support occupant evacuation for the intended building use.

  • Are there existing Distributed Antenna Systems (DAS) in the Airport campus for emergency responder communications?

    Yes, there is a DAS for the San Bernardino County Radio System

  • For integrated systems testing, is the bidder required to engage the respective contractors - HVAC/Mechanical, Fire Sprinkler, Elevator, to name a few? Or are these vendors already under contract with ONT and available to coordinate?

    Contractor will need to coordinate with OIAA Ops, Maintenance staff and their contractors for most of this.

  • Please provide contact info of Airport Approved Contractors for Fire Watch - Prosegur, C&W. Please confirm that Fire Watch will not be required at those facilities where the existing FACP is noted in RFP as discontinued/off-line.

    Prosegur Contact - Kevin Johnson at kevin.johnson@prosegur.com C&W Contact - Clinton Alley clinton.alley@cwservices.com. Fire Watch will be required during anytime that there is no operational system in the building, as required by fire code. This includes during transition from the old system to the new system. Contractor to include cost in the bid.

  • The RFP calls for existing Fiber Optic communication infrastructure to be reutilized. Does the campus use single mode or multi-mode fiber? Are there telecommunication plans available that depict the existing fiber optic network?

    Existing underground pathways between buildings are available and currently contain fiber-optic cabling. The intent of this information is to identify the availability of the pathways only; existing fiber-optic cables are not intended to be reused for the fire alarm system. Provide a bid utilizing the existing underground pathways where feasible, and furnish and install new fiber-optic cabling for all fire alarm control panel (FACP) communication connections.

  • As a follow up, the RFP calls for the bidder to include fiber optic testing in scope. With the use of the existing fiber optic network, what is the expectation to address deficiencies, if there are any?

    Testing shall be limited to the newly installed fiber-optic cabling and shall not include existing fiber infrastructure.

  • Please confirm whether the project will follow the 2025 CBC/CFC/IBC code cycle.

    This project will follow the 2025 CBC/CFC/IBC code cycle.

  • Please provide information on ONT airport’s utility shutdown request processes to aid in planning.

    Refer to section 9 - Area Shutdown (ASR & Utility Shut Down request USR) of the Special Provision for Airport Construction (Attachment C) For further information refer to the OIAA construction Design Handbook: https://www.flyontario.com/design-code-construction-handbook

  • Please provide good faith inspection reports for the presence of ACMs or other hazardous materials for all the 29 facilities listed in the RFP. Will ONT provide abatement services?

    Available documentation/ reports will be made available after awarding of contract. OIAA will not provide abatement services.

  • Will parking be available to contractors on site?

    Parking is normally limited to the contractor's laydown yard.

  • Will secure storage be available to contractors for equipment, or should contractors plan to utilize their own Connex on site?

    Laydown area will be provided after coordination with OIAA. Contractor is responsible for providing their own secure Connex box onsite.

  • Are there any working hours restrictions in any of the facilities?

    Refer to section 8 - Work Hour Limitations of of the Special Provision for Airport Construction (Attachment C). At the pre construction meeting, the contractor shall provide a schedule of proposed work hours and days. All work performed outside of the schedule shall be coordinated and approved in advance by the OIAA.

  • Are there restrictions on noise-generating construction activities during certain time periods?

    Refer to section 8 (4) - Work Hour Limitations of of the Special Provision for Airport Construction (Attachment C) . Coordination with OPS, Maintenance and tenants is required.

  • Which non-proprietary systems are acceptable?

    Potter, Fire-Lite, and Gamewell-FCI.

  • Will As-Built drawings be provided for this project?

    Limited as-built documentation is available; however, OIAA will provide all existing as-built drawings upon request. Most buildings contain exposed conduit systems and a limited number of fire alarm devices. The Contractor shall perform a detailed field survey upon award of the contract to verify existing conditions and develop the final design.

  • Section 5.4 of the IFB and the Technical Specifications (Attachment A) state the Contractor must possess a valid license in "one of" the listed classifications (Class A, Class B, C-10, or C-16). Sections 7.3 and 11 of the IFB list all four classifications as "including." Please confirm that holding any one of the listed classifications, such as C-10 or C-16, satisfies the Prime Bidder licensing requirement.

    The licensing requirements are clarified as follows: the Prime Bidder shall possess a valid California C-10 Electrical Contractor license. The previous references listing multiple acceptable license classifications were included in error and are hereby revised via "A - Attachment_A_Technical Specifications Rev1". A C-10 license is required for bidding and performance of the fire alarm system work associated with this project.

  • IFB Section 16 states liquidated damages may be assessed at $500 per calendar day. Special Provisions (Attachment C) Section 6 states liquidated damages shall be $5,000 per calendar day. Please confirm which amount governs.

    Liquidated damages shall be $5,000 per calendar day.

  • Special Provisions Section 6 states the overall time of completion is 490 calendar days. The listed phase durations (3 months design/permits, 12 months installation, 6 weeks testing, 6 weeks acceptance) total approximately 18 months, and the IFB states a 2-year contract term with a May 2028 target completion. Please confirm the contract time to be used for liquidated damages, and whether it begins at Notice of Award or Notice to Proceed.

    6. TIME LIMITATIONS AND LIQUIDATED DAMAGES. The overall time for completion of this Project, which includes fire alarm system improvements at 29 buildings, shall be 548 calendar days from the date specified in the Notice to Proceed (NTP). The Contractor shall meet the following estimated phase durations: A. Investigation, design, and permitting: 3 months following issuance of the Notice of Award (NOA). B. Scheduling, shop drawings, and installation: 12 months following issuance of the Notice to Proceed (NTP). C. Testing and Fire Marshal approval: 6 weeks following completion of installation. D. OIAA acceptance and project closeout, including filing of the Notice of Completion and release of retention and bonds: 6 weeks following completion of testing and Fire Marshal approval. The Contractor shall achieve overall Project completion, including completion of all work at the 29 buildings, testing, Fire Marshal approval, OIAA acceptance, and project closeout, within the specified 548-calendar-day contract duration. Liquidated damages shall be assessed at $5,000 per calendar day for each calendar day that overall Project completion extends beyond the contractual completion deadline. The phase durations above shall be used for scheduling purposes; liquidated damages shall not be assessed separately for individual phases unless expressly stated elsewhere in the Contract Documents.

  • The Technical Specifications (Attachment A) require a minimum 2-year warranty. The warranty form in the Special Provisions (Attachment C) states one year from date of acceptance. Please confirm the required warranty period.

    2 year warranty from date of acceptance.

  • Please confirm whether Attachment D (Cost Proposal) is the official bid form. The Field Cost total formula contains a #REF! error and only sums through row 822. Building 27 (Map Building #20) appears twice. Please issue a corrected bid schedule that shows the required format for per-building pricing, the base bid total, and optional pricing, consistent with the unit price and total price requirements of IFB Section 7.1.

    Per Addendum #4, the Cost Proposal estimate sheet has been revised.

  • The Technical Specifications require five years of third-party UL-listed 24-hour monitoring and optional pricing for two years of preventative maintenance and five years of service support and repairs. Please confirm that the five years of monitoring is included in the base bid, and identify where on the bid form the monitoring and the optional services should be priced.

    The five (5) years of monitoring service shall remain part of the Base Bid. Preventive maintenance services are not included in the Base Bid and shall be provided as a separate bid option for two (2) years. Additionally, provide a separate bid option for five (5) years of service support and repair, including troubleshooting, diagnostics, and corrective maintenance associated with the fire alarm system.

  • The IFB scope states all FACPs shall communicate with the ACC through the existing campus fiber optic network. Attachment D includes new 12-strand underground fiber optic cable via existing pathway, plus terminations, at each building. Please clarify: (a) whether new fiber is required to every building or OIAA will provide existing fiber strands; (b) whether existing pathways have available capacity and are in usable condition; and (c) whether the contractor or OIAA furnishes network switches and media converters.

    Existing underground pathways between buildings are available and currently contain fiber-optic cabling. The intent of this information is to identify the availability of the pathways only; existing fiber-optic cables are not intended to be reused for the fire alarm system. Provide a bid utilizing the existing underground pathways where feasible, and furnish and install new fiber-optic cabling for all fire alarm control panel (FACP) communication connections.

  • Please provide the OIAA Information Technology network and cybersecurity requirements referenced in IFB Section 5.2 and the Technical Specifications, so bidders can include compliance costs in their bids.

    Please refer to the 'ESS Security Standards Document' and conform to CSF NIST 2.0 for cyber security. The document was provided via addendum #4 on October 26, 2026.

  • The Technical Specifications state fire watch should be performed by approved airport contractors (Prosegur or C&W). Please confirm that bidders must use one of these firms and provide contact information for pricing. Attachment D shows an 840-hour fire watch allowance for some buildings and "When necessary" with no hours for others (Hangar 550, Old FedEx, Building 5, Hangar 35, Hangar 34, Building 27, Building 11, Admin East #1 and #2, Hangar 4). Please confirm the fire watch hours bidders should carry for those buildings, and whether the 840-hour figure is a fixed allowance or a bid item.

    Prosegur Contact - Kevin Johnson at kevin.johnson@prosegur.com C&W Contact - Clinton Alley clinton.alley@cwservices.com. Fire Watch will be required during anytime that there is no operational system in the building, as required by fire code. This includes during transition from the old system to the new system. The 840-hour figure is an allowance item.

  • The Technical Specifications list building footprints of 150,000 SF each for Terminal 2 and Terminal 4, while the IFB states each terminal is approximately 265,000 SF. Please confirm the area bidders should price on. Please also provide the area and existing fire alarm system information for the Airport Control Center (ACC), Backup ACC, Sewer Lift Station, and South Airfield Vault, which are listed as N/A or inaccessible.

    SF on the Technical Specifications list are per floor. Terminal 1 and 2 have two stories each. Please note that the building footprint values were obtained vis satellite view, values are provided for bidding purposes only and are considered approximate.

  • Attachment D lists "Honeywell Fire-Lite or Equal" for all panels. Please confirm the required basis of design. Is Fire-Lite required for the networked head-end at the ACC and the voice evacuation systems at Terminal 2, Terminal 4, FIS, and GTC? Or may bidders propose a higher-capacity non-proprietary networked fire alarm platform?

    The project intent is to provide a non-proprietary fire alarm/mass notification system network. Voice evacuation capability is required for Terminal 2 (T2), Terminal 4 (T4), the Federal Inspection Services (FIS), and the Ground Transportation Center (GTC). All other buildings are intended to utilize temporal horn/strobe notification systems. Contractors may propose alternate manufacturers or system architectures, provided the proposed solution is non-proprietary and meets the performance, functionality, code, and operational requirements of the Contract Documents.

  • Attachment D specifies a Class B fire alarm conduit and cabling system. Please confirm Class B is acceptable throughout, including the voice evacuation buildings. The Technical Specifications also allow reuse of existing wiring in good condition, to be determined during design. For bidding purposes, please confirm that bidders should price all new wiring in conduit.

    Concur. Class B circuiting is acceptable for all buildings, including T2, T4, FIS, and GTC. Design and installation shall comply with the applicable code requirements and the intent of the Contract Documents. For bidding purposes, assume all existing fire alarm conduits, conductors, and associated pathway infrastructure are to be replaced. The Contractor shall field verify existing conditions and include all labor, materials, equipment, and incidental work necessary to provide a complete and operational fire alarm systems.

  • The Technical Specifications require that existing and future PA systems be overridden by the fire alarm voice evacuation system. Please provide the make and model of the existing PA systems at Terminal 2, Terminal 4, FIS, and GTC.

    Future paging system requirements are currently TBD. The intent of the project is to ensure that the new fire alarm/mass notification systems are provided with the capability to interface with and override a future paging system. Contractors shall include all hardware, software, programming, and coordination necessary to accommodate future paging system integration and override functionality. The specific paging system design, equipment, and interface requirements will be determined under a future project.

  • The Technical Specifications state some buildings may require sprinkler system modifications to allow monitoring by the fire alarm system. Please identify which buildings require modifications, and confirm whether that work is included in the base bid.

    For bidding purposes, assume each building requires monitoring of two (2) tamper switches and one (1) waterflow switch. Existing and future fire sprinkler systems requiring fire alarm supervision shall be monitored by the fire alarm system. The sprinkler contractor shall furnish and install the sprinkler supervisory devices. The fire alarm contractor shall furnish all interface equipment and connect the devices to the fire alarm control panel. Buildings currently without sprinkler systems are to include this allowance for future occupancy-related sprinkler system requirements.

  • The General Conditions (Attachment B) and Special Provisions (Attachment C) reference FAA General Provisions and trilateral change orders with the FAA. The General Conditions header also references the "Terminal 1 Gates 1-3 Apron and Taxilane 'G' Rehabilitation Project." Is this project federally funded? Please confirm whether Davis-Bacon wage rates, FAA provisions, and federal DBE requirements apply.

    This project is not federally funded. While Davis-Bacon does not apply, prevailing wage rates will still apply to the project.

  • Please describe the airport badging requirements for contractor personnel, including processing time, cost responsibility, and whether escorts are required for airside or secured-area buildings.

    All applicants must pass a STA and CHRC for unescorted airport access, most felonies will be a disqualifier, processing times depend on various factors such as place of birth (most foreign born will have a significant increase of wait time), background checks (depending on FBI), and training (depends on applicant), could be anywhere between 1 week to 1 month. Cost is $100 per applicant, per background check. The responsibility of the cost will be up to the company to determine. Escort is required for any personnel that does not possess a SIDA badge.

  • Good morning Ontario Airport Team and Happy Flyday!!!! 1. In order to evaluate the existing system to develop our proposal, Please provide the following for all 29 sites: a. Fire alarm/Sprinkler and any other fire system as builds (most recent). b. Testing reports for the past two years and Points list for each panel system. . c. Architectural, Electrical, Structural, Mechanical , Civils, Life Safety Drawings. d. Fiber network / Communication single line/floor plan drawings including site drawings showing pathways between the 29 sites. 2. Per the job walk, security clearance appeared to be a challenge. Can you please provide the following: a. Security levels for each site b. For each level, the requirements i.e badge access, escort required etc. c. Contact for application, approval criteria, review times and cost of security badge application. 3. Once we receive the requested documents, it is highly recommended that we have time to review and another job walk to verify the drawings correlation with the site(s) existing conditions. Also, to verify access and logistical considerations??

    1. Limited as-built documentation is available; however, OIAA will provide all existing as-built drawings upon request. Most buildings contain exposed conduit systems and a limited number of fire alarm devices. The Contractor shall perform a detailed field survey upon award of the contract to verify existing conditions and develop the final design. 2. All applicants must pass a STA and CHRC for unescorted airport access, most felonies will be a disqualifier, processing times depend on various factors such as place of birth (most foreign born will have a significant increase of wait time), background checks (depending on FBI), and training (depends on applicant), could be anywhere between 1 week to 1 month. Cost is $100 per applicant, per background check. The responsibility of the cost will be up to the company to determine. Escort is required for any personnel that does not possess a SIDA badge. 3. No further site walks will be scheduled.

  • Are there special badging requirments for fire watch?

    NIST CSF 2.0.

  • Do the temporary walls have to be full floor to ceiling?

    Yes.

  • Is there an ONT aesthetic requirement for temporary walls?

    They must be redundant.

  • Is there airport pursuing specific XBE percentages across certain categories?

    There are no specific XBE percentages for this project, however, for similar projects the Authority has been able to attain 8-10% small business participation and would like to maintain those percentages.

  • What are Buy-America or Buy-American requirements?

    As this is not federally funded, there are no specific Buy America requirements.

Plain text

OpenGov categories

  • 28030 · Control Cables and Wires, Solid and Stranded, Single and Multiconductor (Up to 600V, for use in Boiler Controls, Fire Alarms, Motors, etc.)
  • 34015 · Fire and Medical Alert Systems
  • 34016 · Fire Alarm Systems, Power Sirens, and Controls
  • 91132 · C.I.P., Fire Alarm System
  • 91220 · Construction, Fire Protection (Includes Fire Escapes, Fire and Smoke Barriers, Firestops)
  • 99042 · Fire and Safety Services