6-Inch Water Main Isolation and Repair – 65 Ruggles Street

Description

The Town of Florence is requesting quotes for the isolation and repair of a compromised section of the existing 6-inch water main located in front of 65 Ruggles Street. Cost Shipping Taxes Scope of Work Description of Services The Town of Florence is requesting quotes for the isolation and repair of a compromised section of the existing 6-inch water main located in front of 65 Ruggles Street. The contractor shall furnish and install two (2) 6-inch Insta-Valves on the existing live water main to isolate the compromised section. Work shall include saw cutting and excavation at two locations to accommodate installation of the Insta-Valves, as well as additional saw cutting and excavation necessary to access and remove the compromised section of water main. The contractor shall remove approximately 18 to 19 linear feet of the existing compromised 6-inch water main and replace it with new 6-inch C900 PVC pipe. The contractor shall furnish and install all necessary fittings, connections, restraints, adapters, and appurtenances required to complete the installation. The contractor shall be responsible for backfilling and compacting all excavations with ABC aggregate to the existing pavement subgrade, leaving the surface level and ready for asphalt restoration. The Town of Florence will provide all traffic control and perform the final asphalt pavement restoration. The contractor shall coordinate all work with the Town of Florence to minimize service disruptions. Coordination with Town personnel is required for water main isolation, shutdowns, valve operation, and restoration of water service. The contractor shall not proceed with cutting into or removing the existing water main until the Town has confirmed that the compromised section has been properly isolated. All work shall be completed in accordance with applicable Town of Florence requirements, construction standards, and water utility specifications. Introduction Summary Background Contact Information Timeline Instructions Bid Bond Bid Bond Requirement – If you are using any sub-contractors, or using non-owned inventory/materials, a Bid Bond is REQUIRED. Notification This is an informal “Request for Quote”. Only the successful vendor will be notified of the Town of Florence’s intent to enter into a contract for the goods or services quoted. Right to Reject The Town of Florence reserves the right to reject any or all responses, or to accept any response, or to waive any informality in any response, or to withhold the award if deemed in the best interest of the Town of Florence. Vendor Questionnaire Pricing Proposal Attachments

Published attachments
Public questions and answers
  • Can the Town of Florence please confirm the material & approximate depth of the existing water main.

    The existing material is 6-inch ductile iron and the depth is 6-foot.

  • Does the Town of Florence have an estimated start date for this project?

    The Town anticipates starting the project as soon as quotes have been received, evaluated, and a Purchase Order has been issued. The selected contractor should be prepared to begin work promptly following authorization to proceed.

  • We do not plan to use subcontractors, however we may or may not have all required parts and pieces in inventory. Is a bid bond required?

    No bid bond will be required, but a performance bond in an amount equal to the full contract amount conditioned on the faithful performance of the contract in accordance with plans, specifications and conditions thereof will be required prior to entering into the contract.

  • Can the Town confirm the required bid bond percentage or dollar amount and whether any additional bonding will be required?

    No bid bond will be required, but a performance bond in an amount equal to the full contract amount conditioned on the faithful performance of the contract in accordance with plans, specifications and conditions thereof will be required prior to entering into the contract.

  • Project documents state that a bid bond is required to be submitted, but does not state an amount. Should 10% be used? Also, will Performance and Payment bonds be required upon award?

    No bid bond will be required, but a performance bond in an amount equal to the full contract amount conditioned on the faithful performance of the contract in accordance with plans, specifications and conditions thereof will be required prior to entering into the contract.