Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Advanced Metering Infrastructure (AMI) System and Installation Services

Description

The City of Pasadena (“City”) is seeking proposals from qualified firms to provide a comprehensive Advanced Metering Infrastructure (“AMI”) solution, together with associated installation services, for the City’s water and electric utilities. The objective of this RFP is to select a vendor capable of providing a vendor-hosted AMI headend system with a supporting communications network, as well as electric meters, water meters, water endpoints, and related components as required. The selected vendor will also perform field deployment, integration with the City’s Oracle C2M and Oracle Meter Data Management environment, testing, commissioning, training, and go-live support needed for full AMI operations. The selected vendor will play a critical role in meeting performance, reliability, security, and interoperability requirements while advancing operational efficiency and customer service. Scope of Work Scope of Work Introduction Pasadena Water and Power requests proposals from qualified Proposers to provide equipment, software, and/or services (both construction and professional) for the utility’s comprehensive Advanced Metering Infrastructure (AMI) Project. The required scope of this project is summarized below, consisting of several parts (each individually referred to as a Component). Component Number Component Name Description 1 AMI Field Area Network (FAN) Equipment, software, and services capable of delivering billing and interval reads from customer meters, including network infrastructure and its installation; electric meters; water endpoints; a headend system (or multiple headend systems, if separate for electric and water) necessary to attain functionality and monitor network health; and integration services to tie the AMI headend to other business-critical systems 2 Installation Services Installation for AMI meters/endpoints and other ancillary materials related to the Project 3 Water Metering Water meters and retrofit registers A complete Proposal should include all Project Components. Proposers are permitted to submit a joint Proposal with multiple firms to provide a Proposal that best meets the stated needs. Submission of a Proposal for all Components does not guarantee that PWP will award all Components to that Proposer. PWP is under no obligation to select a single, end-to-end solution and may instead pursue a “best-of-breed” approach across Components and utility services. PWP reserves the right, at its sole discretion, to evaluate, select, and award Components independently or in combination, in a manner that best serves PWP’s operational, technical, and financial objectives. PWP expressly reserves the right to: Award one or more Components to a single Proposer; Award different Components to different Proposers; Select multiple solutions for the same Component across different utility services (e.g., electric and water); Decline to award any Component in whole or in part. Selection decisions will be based on PWP’s evaluation of overall value, including but not limited to technical merit, interoperability, lifecycle cost, implementation risk, and alignment with PWP’s long-term strategic goals. PWP reserves the right to structure resulting agreements in a manner that reflects its selected approach, including but not limited to: Executing separate contracts with different Proposers for discrete Components or utility services; Requiring selected Proposers to enter into a joint or coordinated contractual arrangement to deliver an integrated solution; Designating one Proposer as a Prime Contractor responsible for overall system integration, with others serving as Subcontractors; Establishing parallel contracts with defined interface and coordination requirements between vendors. PWP further reserves the right to condition award upon Proposers’ agreement to collaborate, integrate, or otherwise modify their proposed delivery approach to align with PWP’s selected configuration. As part of this initiative, PWP plans to replace approximately 68,000 electric meters and to replace or retrofit approximately 38,000 water meters within an 18-month timeframe. To meet this schedule, PWP plans to utilize a combination of internal staff and by a Meter Installation Vendor (MIV). PWP has approximately 5,000 three-phase electric meters primarily serving commercial customers. As part of the AMI project, these meters will be replaced by PWP Power Delivery staff represented by the International Brotherhood of Electrical Workers (IBEW). The MIV will complete the installation of the remaining 63,000 single-phase meters. PWP has approximately 200 large water meters greater than 3 inches in size belonging to key accounts. These key accounts are typically large, commercial customers with higher water usage and more complex service requirements. As part of the AMI project, these meters will be replaced by PWP staff. The MIV will complete the replacement and retrofit of approximately 38,000 water meters, including non-key commercial accounts and all small meter accounts. Of this total, approximately 26,700 will be full meter installations and approximately 11,200 will be retrofits. PWP expressly reserves the right, in its sole discretion, to adjust, reduce, or remove the commercial electric and/or water meter AMI conversion scope, in whole or in part, including assigning such work to PWP personnel. No minimum quantity of commercial meter AMI conversion work is guaranteed to the MIV. Any such adjustment or de-scoping shall not serve as a basis for modification of the MIV’s proposed pricing for Installation Services or any other component of the work. Please note that proper and current contractor licensing is required for any firm directly providing services under Component 2. This requirement may be met by C-10 Electrical and C-36 Plumbing licensing, or by Class A General Engineering licensing. Additionally, please note that the water portion of this project is funded in part through WIFIA funds and grant funds that are subject to Build America, Buy America Act requirements. PWP is currently evaluating waiver applicability but cannot make guarantees at this time. As such, PWP is requesting Component 2 pricing for "standard" materials, as well as options for BABA-compliant materials, if available. Additional terms related to WIFIA are given as an attachment that requires mandatory compliance, and more detail can be found at: https://www.epa.gov/wifia/wifia-federal-requirements . Vendors are responsible for upholding these requirements and meeting compliance. Metering Summary Electric Meter Form Estimated Replacements 1S 1,076 2S 54,021 3S 271 45S 277 4S - 9S 1,373 12S 9,082 16S 2,991 Water Meter Size Estimated Replacements Estimated Retrofits 3/4" 15,746 5,539 1” 7,619 4,450 1.5” 1,632 580 2” 1,353 460 3” 237 118 4” 178 115 6” Environment Information Technology PWP is pursuing a cloud-first IT strategy. As a result, any systems to be procured as part of this solution should be vendor-hosted. A high-level dataflow and integrations systems context diagram is provided in Exhibit T, denoting current systems anticipated integrations to be performed within the scope of the Project. PWP currently utilizes an Oracle C2M system for billing; additionally, PWP has implemented the Oracle Meter Data Management module. As a result, a separate meter data management system is not within scope for this project; however, any AMI system to be provided will be required to deliver reads to the MDM in a timely fashion. Similarly, PWP’s customer engagement is handled through the VertexOne MyMeter/WaterSmart suite, and a separate customer portal is also not within scope for this project. Network Communications A map of the service territory and a list of potential assets for locating network infrastructure are given in Exhibit Y. While proposers are encouraged to propose any network design that is determined to be most cost-efficient and operationally robust, PWP highly prefers that any fixed-based network utilizes this existing infrastructure to the extent possible. Third-party tower leasing is not preferred for network infrastructure, but, if required, all costs associated with this leasing should be included within the proposal. Where fiber is unable to be used, PWP is open to the use of cellular backhaul; FirstNet is the current provider to PWP’s water SCADA system, but other commercial carriers may be used. Costs for backhaul should also be included within the proposal. Field Conditions PWP maintains a system of approximately 68,000 electric meters and 37,000 water meters. A list of meters, their characteristics, and their collection method can be found in Exhibits U and V. PWP reads meters using a variety of methods, including: Itron FCS for AMR/drive-by; MV90 for commercial interval reads; and a mix of manual, AMR, and probe-based reads. One impetus for this AMI project is an excessive number of module failures that have occurred in the AMR system since 2018. Currently, about 6,000 meters are being read manually, and there are routes that contain manual and AMR meters, causing inefficient sequencing and billing. As a result, PWP hopes to unify its system under a single AMI network and headend system. In general, commercial accounts are billed monthly, and residential accounts are billed bi-monthly (except for some special customers and instances where residential accounts are included in a commercial route or require demand reset). Meters are read on 57 bill cycles; of these, 22 are monthly, 32 are bi-monthly, and 3 are “special.” It is not anticipated that PWP will change bill cycles or billing frequency during this project but may do so after deployment. The service territory is approximately 22.5 square miles. Water and electric service territories largely intersect; however, approximately 5,500 water meters and 150 electric meters are located outside of the city limits. A map is given in Exhibit Y. There is no expectation for substantial growth outside the periphery of the service territory that would impact this project. PWP anticipates being able to provide warehousing space for staging the project, with the following characteristics: Gated security Approximately 10,000 sq. ft. Staff to take deliveries of product Operating between 6:30 AM and 4:00 PM Monday through Thursday, and on Friday through 3:00 PM Parking space Office space, bathrooms, and utilities Secured bin area for the disposal of removed meters Should a meter installation vendor have needs different from what is defined, PWP will work with the meter installation vendor to determine an adequate solution, or a proposer may opt to quote additional costs for warehousing. Currently, PWP is contemplating using either a meter installation vendor-provided work order management system to facilitate deployment or to give the vendor access to the Oracle Field Service (OFS) tool that is currently in use. The feasibility of these options will be explored in evaluation, with preference for use of the OFS system. Though PWP usually has a testing and acceptance process in place for new meters received, the scale and timeline of this project is such that the meter installation vendor may be asked to quote and perform such testing (either with onsite testing apparatus or sent offsite to a third party depending on cost-effectiveness). For removed meters, PWP will be foregoing any testing or holding requirements. PWP is currently considering an opt-out program for those customers who are hesitant about the migration to new metering technology, with a fee assessed to those customers based on cost of service; however, these details have not been fully defined. Regardless, the customer base is such that it is not anticipated to have any material impact on the project or the services being requested under this RFP. In addition to these conditions, Proposers should be aware of, and assume for the sake of proposal development, the following circumstances appertaining to the utility’s meter and field conditions: Water Current meters are read and billed in 100 cubic feet. Currently meters makeup is largely composed of Zenner meters for small sizes and Neptune meters for large sizes; however, for new meters, PWP is open to all meter manufacturers. Current ERTs utilize an Itron connectors, which should be assumed for any retrofits; however, PWP does not have a connector preference for new meters. Consumables, such as washers, gaskets, or gel caps will be provided by the selected vendor. Replacement lids will be provided by the selected vendor. PWP will accept bids on both mechanical and electronic meters, but there is high preference for brass bodies and threading. Pricing for all metering options is requested, if available by the manufacturer. Adjustments in lay length Future State As part of this project, PWP conducted an assessment of its current metering program to identify its desired future state. This future state is summarized in 21 objectives, detailed in the proceeding table. ID Gap Category Current State Desired Future State 1 Inconsistent meter read and billing cycles across customer classes Process Residential accounts billed bi-monthly (mostly), commercial billed monthly, and select accounts on irregular cycles Standardized, operations-driven billing cycles for each customer class 2 Service territory overlap and multi-jurisdictional coordination Process Water and electric territories partially overlap; ~5,500 of 31,000 water customers outside city limits; limited alignment on infrastructure ownership and jurisdictional coordination Fully mapped and reconciled service boundaries; agreements in place to guide AMI network design and pole access 3 Mixed meter reading technologies Technology Itron FCS for AMR/drive-by; MV90 for commercial interval reads; mix of manual, AMR, and probe-based reads Unified AMI network supporting both electric and water, with automated daily register and interval reads 4 Large number of failed or inoperative AMR modules Technology 5,200+ failed since 2018; ~7,000 meters read manually AMI meters with reliable communication modules and proactive health monitoring 5 Mixed routes with manual and AMR reads Technology Routes contain both manual and AMR meters; inefficient sequencing All meters converted to AMI 6 Dependence on legacy MV90 system for commercial interval data Technology MV90 requires separate system maintenance and some data prep each billing cycle Modern, integrated HES with direct integration to MDMS (C2M) 7 Construction meter billing Technology Temporary construction and portable meters are often billed at end of project or upon return; limited interim usage visibility AMI-equipped construction meters transmit usage continuously; billing integrated with CIS to allow periodic invoicing during use 8 Lack of formalized data governance framework Process Informal practices exist; no formal governance or cross-functional ownership Formal data governance structure with defined roles, standards, and stewardship 9 No water meter test bench or calibration infrastructure Technology No water meter test bench; water meters replaced only when failing or over 10 years old Water meter and endpoint functionality is tested and validated end-to-end 10 Manual re-read and verification workflow Process Billing exceptions trigger manual re-reads; photos taken for validation Automated exception management and remote read verification 11 Manual dispatch and routing for field activities Process Move in/out, disconnects, and re-reads assigned manually by leads Automated scheduling and routing based on AMI data and workforce management tools 12 Disconnect and MIMO truck rolls Process Disconnects performed manually by field technicians; coordination across departments inconsistent AMI remote disconnect/reconnect capabilities implemented for at least applicable electric meters; automated verification workflows established 13 Limited visibility into meter locations and GIS alignment Technology GPS coordinates not precise; property line-based; misalignment between city and utility GIS Accurate GIS-integrated meter locations synced with asset and billing systems 14 Workload and efficiency People Billing team of 11 (2 vacancies); 12 call center staff (2 vacancies); high manual workload and process dependencies Staffing optimized through process automation, workflow integration, and AMI data availability; reduced reliance on manual intervention 15 Public concern over smart meter privacy and safety People Customer concerns about radiation, fires, and data privacy; existing opt-outs from AMR Clear AMI communication strategy and opt-out framework 16 Data not fully leveraged for water conservation or analytics Technology Tracking participation and estimated savings only; no validation against actuals Use AMI data for actualized water savings measurement and reporting 17 No digital water distribution system monitoring Technology Manual troubleshooting via gauges and field inspection Real-time system visibility via AMI, pressure sensors, and SCADA augmentation 18 Limited meter replacement rate Technology ~1,200 water meters replaced every year; ~550 electric meters replaced every year Structured meter lifecycle plan aligned with AMI deployment 19 Limited analytics on customer classes and consumption patterns Technology Tracking retail/wholesale revenue by class; limited consumption insight AMI-enabled analytics with segmentation and consumption profiling 20 Meter access and safety constraints Process Some meters behind locked gates, near dogs, or blocked by vehicles; historic electric meters indoors or in basements; access requires coordination and manual effort AMI-enabled remote reads eliminate need for routine access; access issues mapped in GIS and prioritized for relocation during meter changeouts 21 Bill estimation process Technology Estimated bills automatically generated in CIS when reads fail; limited validation or feedback loop from field or data analytics. Fully automated, rules-based validation, editing and estimation (VEE) routines 22 Lack of data on individuals Technology A load-logger has to be connected to a service and left on for multiple weeks to collect an individual's data. Analytics on individual customers 23 Inefficient methods for predicting outages Technology Outages are predicted when customers call in to report them. AMI interfaces with Milsoft DisSPatch and WindMil to automatically predict outages 24 Lacking Data Collection for Power Technology Power Delivery does not have access to real-time consumer data at each meter Meters should collect Watts, VARs, and Voltage in no less than 15 minutes intervals Project Approach The overall implementation period is expected to span 24 months following Project approval and formal Notice to Proceed. The project will be implemented in three phases: Planning (3 Months) Initial Deployment Area (IDA) (9 Months) Full Deployment (12 Months) This timing is tentative and subject to change. A final schedule will be developed between the selected Proposer(s) and Pasadena Water and Power, detailing sequencing, dependencies, and integration timelines across all participating systems. Successful completion of each phase will occur upon confirmation of meeting the criteria outlined for each. Proceeding to a subsequent phase will not be authorized until Pasadena Water and Power fully accepts the previous phase’s work, or Pasadena Water and Power unless otherwise authorizes in writing that work may proceed with a subsequent phase prior to acceptance of the previous project phase. Criteria are outlined through a linear responsibility chart for each phase. Responsibilities are outlined in the following table: Responsibility Description R (Responsible) Designates the entity is responsible for t

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #4 · 4

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #5 · 5

    Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Requesting the Exhibit S Non-Disclosure Agreement for access to Exhibits T through Y. A signed copy is ready to return. Please send return instructions to the contact email on this account.

    Please note that we are not able to view your account details. The RFP includes the following instructions: An NDA will be provided for execution upon request. Requests MUST be submitted through the OpenGov Q&A and include a contact email address. The City will then provide the NDA for signature.

  • Requesting Exhibit S - Non-Disclosure Agreement for release of Exhibits T - Y. Please send instructions to email on file for this account.

    Please note that we are not able to view your account details. The RFP includes the following instructions: An NDA will be provided for execution upon request. Requests MUST be submitted through the OpenGov Q&A and include a contact email address. The City will then provide the NDA for signature.

  • Per RFP document instructions, please send NDA submittal instructions to the contact email on this account. The materials we are requesting for propagation are: meter service addresses, asset locations for FAN, and maximum antenna heights at those locations. This information in tabular format or GIS shape files.

    Please note that we are not able to view your account details. The RFP includes the following instructions: An NDA will be provided for execution upon request. Requests MUST be submitted through the OpenGov Q&A and include a contact email address. The City will then provide the NDA for signature.

  • Can you please explain specifically what is included within the 70 page limit, referring to the "Technical Proposal" instructions? It is our assumption that the Excel Workbooks are separate submittals, not included in the "Technical Proposal" page count. Also, the RFP states, "Proposers, production descriptions, technical specifications and/or cut sheets for any equipment proposed" within Section 10 of the Mandatory Content. Can these please be excluded from the 70 page limit?

    Excel workbooks and materials submitted as appendices will not count toward the 70-page limit.

  • Will the City accept proposals for the water utility scope only?

    Proposals should include both water and power.

  • Requesting the Exhibit S Non-Disclosure Agreement for access to Exhibits T through Y. A signed copy is ready to return. Please send return instructions to jwackerly@wescodist.com.

    The requested NDA instructions have been provided to the vendor, and receipt has been confirmed.

  • Requesting Exhibit S - Non-Disclosure Agreement for release of Exhibits T - Y. Please send instructions to the email addresses below. aburns@utilitypartners.com jsimmons@utilitypartners.com david.taylor@utilitypartners.com

    The requested NDA and submission instructions have been provided to the vendor.

  • As per Section 6 of the City's RFP, can NDA documents please be sent to the following email address for signature: procurements@aqua-metric.com

    The requested Non-Disclosure Agreement (Exhibit S) has been provided to the vendor at the email address specified.

  • Please provide the NDA for access to Exhibits T through Y.

    Please provide email address to be used to share the NDA document

  • We have prepared and signed Exhibit S - AMI RFP Non-Disclosure Agreement for access to Exhibits T through Y. Please send return instructions to aclara-registration@hubbell.com.

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • We understand that the bid documents include a California DIR Special Prevailing Wage Determination. The RFP identifies federal funding and references the potential application of Davis-Bacon wages to this work. Please confirm whether the meter installation vendor is to use the California DIR Special Prevailing Wage Determination for meter installation work, or whether the Davis-Bacon Act or related acts apply. If Davis-Bacon or related acts apply, please provide the applicable federal wage determination and labor classifications.

    In these cases, the higher of the two would typically apply, which would be the CA DIR Special Prevailing Wage.

  • We understand the IDA consists of approximately 1% of the meter population, or roughly 1,000 meters. For planning purposes, should the meter installation vendor expect a halt or stand-down in work between the IDA and full deployment? If so, please clarify the anticipated timing and duration.

    A stand-down may be expected between IDA and Full Deployment, depending on the nature and extent of testing and issues uncovered during the process. At a minimum, proposers should plan for a two-month period during which billing validation will take place to confirm the accuracy of the AMI meters installed.

  • Please clarify the required method and scope for identifying water service-line material. Should the installation vendor identify the utility side, the customer side, or both? Is identification limited to piping visible in the meter pit, or is potholing outside the meter pit required? Is visual inspection sufficient, or are scratch, magnet, or other tests required? Please specify the required documentation, including photos, and how to record material that cannot be determined or observed.

    This item is addressed in Installation Services requirement 57. Material identification is concerned with service line leading from a meter for each meter installation, on the customer's side. Proposers may optionally price out utility-side material identification. Potholing is neither required nor expected, and identification should be limited to what is observable from the meter pit. Installers shall progressively perform a visual inspection, a scratch test, and a magnet test on exposed piping. Destructive testing and instrument-based methods are not required. Installers shall record the result from a pre-set drop-down list (e.g., copper, lead, galvanized steel, PVC, other with exception notes). Undetermined results shall use one of the following: not visible, obscured, or inconclusive test results. Installers shall also indicate which tests were performed.

  • The RFP states that most commercial electric meters are underground, hardwired with copper, and do not use 4G, which may affect the propagation study. Please clarify whether these meters are located in vaults and what this configuration means for the meter installation vendor’s scope, installation procedures, and production assumptions. Are any special access, wiring, or communications requirements anticipated for these installations?

    These commercial electric meters are not in scope for the meter installation vendor.

  • The RFP requires diversion of at least 75% of construction and demolition debris and submission of a Waste Management Plan through Green Halo. Please clarify how the diversion requirement applies to the meter installation subcontractor’s work, how diversion and compliance must be documented, and whether subcontractor work may be covered under the prime contractor’s consolidated plan. Who is responsible for creating, submitting, and maintaining the plan and final compliance report? Please also clarify how the performance security deposit (3% of project value, capped at $30,000) and nonrefundable administrative review fee will be calculated, paid, and allocated to the meter installation scope, and whether any separate permits or fees are required.

    The City has determined that the AMI System and Installation Services Project will be exempt from the City's construction and demolition (C&D) waste management requirements due to the nature of the work and the minimal amount of debris anticipated. The Green Halo reporting requirements, 75% waste diversion requirement, associated performance security deposit, and administrative review fees have been removed from the RFP through an addendum. The selected contractor shall collect and transport all removed water and electric meters to PWP's designated warehouse within the City of Pasadena. PWP will be responsible for their subsequent disposition. The contractor remains responsible for properly managing other debris generated during installation and leaving work areas in a clean and safe condition

  • Exhibit A requires installers to remove dirt and other debris from meter boxes. Will PWP provide a designated location at the staging area for the contractor to deposit this material, or is the contractor responsible for hauling it offsite and disposing of it?

    Dirt should be removed to the extent it is required for AMI conversion. As a general practice, dirt may be spread loosely in the vicinity of the meter box. It is not expected that it be hauled from the job site.

  • Will PWP provide dumpsters or other containers for removed meter lids, or is the contractor responsible for supplying containers and arranging disposal?

    Yes, or Proposers may opt to quote for this service.

  • Will PWP provide bins or other containers for removed legacy Itron ERTs, or is the contractor responsible for supplying containers and arranging their disposal?

    Yes, or Proposers may opt to quote for this service.

  • Will PWP provide bins or other containers for removed water meters and arrange their recycling, or is the contractor responsible for those arrangements? Who retains any proceeds from recycling the meters?

    A secured bin area will be established for removed meters. PWP may arrange for their scrapping, or Proposers may opt to quote for this service; in the latter case, PWP would expect reimbursement for scrap value.

  • Requesting Exhibit S - Non-Disclosure Agreement for release of Exhibits T - Y. Please send instructions to sales@concordus-inc.com

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • Please provide dimensions, shape and useful propose for "collars" listed on tab Water Metering in Exhibit B.

    Collars are precast concrete riser rings that sit on top of PWP's older concrete meter boxes. They bring the setting to grade and seat the cover. Typical dimensions (length x width x height): - ¾-inch meters: box 21" x 16" x 9"; collar 21" x 16" x 3"; cover 14½" x 8¾" x 2" - 1-inch meters: box 20½" x 13" x 9"; collar 20½" x 13" x 3"; cover 13½" x 7" x 1½" PWP intends to keep these boxes and collars in place and replace only the cover where needed.

  • Name: Neil Alcantara neil.alcantara@landisgyr.com Angie Thoma angie.thoma@landisgyr.com Company: Landis + Gyr Please provide to both myself and Angie the NDA form.

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • As per Section 6 of the City's RFP, can NDA documents please be sent to the following email address for signature: adam.milauskas@ferguson.com

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • We have a signed NDA ready to submit. Please confirm that we should email the completed document to jkaprelian@cityofpasadena.net, the email provided in the RFP, or if another method of delivery is preferred. Thank you.

    An NDA will be provided for execution upon request. Requests MUST be submitted through the OpenGov Q&A and include a contact email address. The City will then provide the NDA for signature.

  • Several items necessary for proposal development, including access to NDA-protected documents and information needed to fully evaluate the requirements, are being made available throughout the procurement process. Combined with the reduced working days associated with the Thanksgiving holiday period, the time available for proposal preparation has become compressed. To help ensure the City receives the most complete and well-developed responses possible, would the City consider extending the proposal submission deadline of December 1, 2026, by two to three weeks?

    The proposal submission deadline has been extended.

  • Page 89 of the AMI System and Installation Services document states, “If a bid bond is required…” and then provides bid bond instructions. Can you clarify if a bid bond is required at the time of proposal submission?

    A bid bond is not required at the time of proposal submission.

  • What file format will Exhibit U – Electric Meter Population, Exhibit V – Water Meter Population, and Exhibit Y – PWP Assets be provided in (e.g. PDF, .csv, shapefiles, other)?

    Exhibits U (Electric Meter Population) and V (Water Meter Population) are provided in tabular spreadsheet format. Exhibit Y (PWP Assets) is provided in geodatabase format. These exhibits are available through the City's established NDA-protected document access process.

  • Can the City clarify the payment term on page 23 of the RFP

    The City is open to monthly progress payments, milestone-based payments, or a combination of both, as appropriate for the proposed scope of work. Payment is not intended to be deferred until completion of the entire project. The final payment structure, invoicing schedule, milestones, and acceptance criteria will be negotiated with the selected proposer prior to contract award and incorporated into the final agreement. Please also refer to the City's responses to Questions 70 and 83.

  • Please provide the NDA for access to Exhibits T through Y. Email to octavio.reza@honeywell.com

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • Hi, Can we get a copy of the Exhibit S, please send to jasonf@yrcusa.org Thank you!

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • please send the NDA to jasonf@yrcusa.org, thank you!

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • Please send to: Erin Gould; Egould@tantalus.com Laura Peterson; lpeterson@tantalus.com Thank you.

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • Please send the NDA and return instructions to david.schamber@tescometering.com and jon.scott@tescometering.com Thank you.

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • Will the City provide a copy of the Greenbook at no charge for all bidders?

    No. The City will not provide complimentary copies of the Greenbook. As specified in Section 5.4 of the RFP, the applicable Standard Specifications for Public Works Construction (Greenbook) are the 2018 edition, published by Public Works Standards, Inc. Proposers may obtain the Greenbook directly from its publisher. The City's Pasadena Recurring Supplements are available at: https://www.cityofpasadena.net/public-works/wp-content/uploads/sites/29/Pasadena-Recurring-Supplements-2023.pdf Please also refer to the City's response to Question 38.

  • We have successfully executed the NDA with the City. How will access to Exhibits T-Y be provided, and when is access anticipated to be provided? Thank you.

    The City has provided the vendor with instructions for accessing the NDA-protected documents through the designated shared drive.

  • Request for Exhibit S, the AMI RFP Non-Disclosure Agreement (RFP #2026-RFP-0143), for execution so that we may receive access to Exhibits T through Y. Please send the NDA to rfp@sparusholdings.com. Please also confirm whether the signed NDA should be returned through the OpenGov portal or by email, and whether a signature by an authorized officer is sufficient.

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • Section 8 states that proper and current contractor licensing is required for any firm directly providing services under Component 2, and that this may be met by C-10 Electrical and C-36 Plumbing licensing or by Class A General Engineering licensing. 1. If a Proposer is not itself licensed, may the requirement be met by a California-licensed subcontractor or joint venture partner that performs the licensed work under Component 2? 2. If so, must the licensed firm be identified in the proposal, or may it be identified after award? Must license numbers be provided with the proposal? 3. At what point must licensing be in place: proposal submission, award, or contract execution? 4. Does the City require subcontractors performing Component 2 work to be registered with the Department of Industrial Relations at proposal submission, or only before work begins? 5. Are there limits on the percentage of Component 2 work that may be subcontracted?

    Licensing Through Subcontractors or Joint Venture Partners: The contractor licensing requirements identified in Section 8.1 may be satisfied by appropriately licensed subcontractors performing the applicable Component 2 installation work. Joint venture arrangements must comply with applicable California contractor licensing requirements. Identification of Licensed Firms: Proposers shall identify the firms proposed to perform Component 2 installation services and provide their applicable contractor license numbers with the proposal. Timing of Licensing: Firms performing work requiring a California contractor license must possess the appropriate valid licenses when required under applicable law. A Pasadena Business License is required for firms contracting directly with the City and must be obtained prior to contract award and execution. DIR Registration: Firms performing public works activities subject to California Department of Industrial Relations (DIR) registration requirements must comply with applicable registration requirements. Proposers shall provide the DIR registration information required under Section 17 of the RFP. Subcontracting Limitations: The City has not established a specific percentage limitation on subcontracting Component 2 installation services. The prime contractor remains responsible for the performance of its contractual obligations, including work performed by subcontractors.

  • Section 3, Item 15 requires a Performance Bond and a Labor and Materials Bond, each at 50% of the Contract Price, for the Construction, System Procurement, and Integration contract, and refers to Section 2-4 “Contract Bonds” of the Standard Specifications and Section P-2-4 of the Pasadena Supplements. 1. Please provide Section 2-4 of the Standard Specifications and Section P-2-4 of the Pasadena Supplements, or a link to them. 2. Please provide the form of the Labor and Materials Bond. Only the Faithful Performance Bond form (Exhibit T) is in the solicitation package. 3. Are bonds required for the Operations and Maintenance contract, and if so, in what amount? 4. Are there surety requirements (for example, California admission or a minimum Treasury or A.M. Best rating)? 5. If a Proposer’s subcontractor performs Component 2 work, may the subcontractor furnish bonds for its portion, or must the bonds be furnished by the prime? 6. Should the cost of bond premiums be shown only on the “Bonds” line of the Installation Services tab of the Fee Proposal Workbook?

    1. Standard Specifications and Pasadena Supplements As specified in Section 5.4 of the RFP, the applicable Standard Specifications for Public Works Construction (Greenbook) are the 2018 edition, published by Public Works Standards, Inc. The City's Pasadena Recurring Supplements are available at: https://www.cityofpasadena.net/public-works/wp-content/uploads/sites/29/Pasadena-Recurring-Supplements-2023.pdf The Greenbook is published separately and must be obtained from its publisher. 2. Labor and Materials Bond Form The Labor and Materials Bond form has been added to the solicitation documents and is available through OpenGov. 3. Bond Requirements For the Operations and Maintenance (O&M) scope of work, a Performance Bond equal to 50% of the applicable contract amount is required. A Labor and Materials Bond is not required for the O&M scope. For the Construction, System Procurement, and Integration scope of work, both a Performance Bond and a Labor and Materials Bond are required, each equal to 50% of the applicable contract amount. The required bonds shall be furnished by the successful proposer prior to contract execution. 4. Surety Qualifications The RFP does not establish a minimum A.M. Best rating or financial size classification for sureties. Required bonds must be issued by a surety legally authorized to transact surety business in California and must be in a form acceptable to the City. 5. Responsibility for Furnishing Bonds The required bonds must be furnished by the c

  • We believe the following portions of the proposal are intended to count toward the 70-page limit. Would the City please confirm? 1. Table of Contents 2. Section 2: Executive Summary 3. Section 3: Solution Narrative, components 1-3 4. Section 4: Firms and Work Plan 5. Section 5: Key Personnel 6. Section 6: Background, Experience, and References 7. Section 7: Exceptions 8. Additional Data 9. Statement of Qualifications

    The 70-page limit applies to the Technical Proposal, Additional Data, and Statement of Qualifications, collectively. Sections 3 through 6 are included in this limitation. The Table of Contents, Executive Summary, and Exceptions are excluded. Excel workbooks and supporting materials submitted as appendices are excluded from the 70-page limit, consistent with the City's previously published response to Question 4.

  • Is project deployment 18 months or 24 months? There are two different timeframes listed in the RFP.

    The anticipated deployment period is 24 months. The City may consider an accelerated deployment schedule of 18 months, subject to the selected contractor's proposed implementation plan, resource availability, and the City's approval.

  • Per the RFP pages 29 and 102, “If selected, proposers will be required to complete the Pasadena Department of Information Technology Technical Questionnaire.”. Do proposers need to complete and submit the “DoIT_Technical_Questionnaire” as part of their bid submittal, or does bidder complete if awarded the contract?

    Proposers are required to complete and submit the Pasadena Department of Information Technology (DoIT) Technical Questionnaire as part of their proposal submission.

  • Please provide NDA to Courtney.wise@xylem.com.

    The requested Non-Disclosure Agreement (Exhibit S) and applicable submission instructions have been provided to the vendor.

  • We received the NDA for the AMI project, signed it, and now need the City to release the remaining documents of the AMI RFP. Receiving those documents timely is imperative for bid purposes, without requesting an extension. Would the City please advise?

    The City has provided the vendor with instructions for accessing the NDA-protected documents through the designated shared drive.

  • We understand that some assets cannot be released until an NDA is in place, which inevitably slows down proposal development. Would the City please extend the Q&A period to allow proposers time to thoroughly review NDA-covered documentation and ask the City any questions that arise?

    The NDA and question submission deadline remained November 3, 2026, at 2:00 p.m. Pacific Time. However, the proposal submission deadline has been extended to December 11, 2026, at 2:00 p.m. Pacific Time, providing additional time for proposers to review the solicitation documents and prepare their proposals.

  • The RFP states the entire proposal must be 12-point font. We believe this may be intended to avoid inclusion of smaller fonts. Are font sizes larger than 12-point (such as section headers) allowed?

    Yes. Font sizes larger than 12 points are permitted, including for section headings and titles. The 12-point requirement establishes the minimum font size for proposal text.

  • Is full Build America, Buy America (BABA) compliance required for all water meter products furnished under this contract or what percentage requires BABA compliance? Will the City consider waivers if BABA-compliant products are unavailable or if lead times materially impact project schedules? What documentation and certification package will manufacturers be required to provide to demonstrate BABA compliance? Will BABA-compliant pricing and non-BABA-compliant pricing be evaluated separately during proposal review?

    The City has federal funding available for the water meter portion of the AMI project and is evaluating the cost implications of Build America, Buy America (BABA) compliance. Proposers shall provide pricing for both BABA-compliant and non-BABA-compliant water meter products, as requested in the Fee Proposal Workbook. The City intends to evaluate the cost differences, product availability, delivery schedules, and other relevant considerations before determining the most advantageous procurement and funding approach. Where BABA compliance is required under the applicable funding arrangement, the selected contractor must provide appropriate manufacturer certifications and supporting documentation demonstrating compliance. Any use of non-BABA-compliant products for federally funded work would be subject to an applicable exemption or an approved waiver. The City will evaluate the proposed alternatives in accordance with the RFP's evaluation criteria and applicable federal funding requirements.

  • For the approximately 11,200 retrofit locations, can the utility provide the existing meter population by manufacturer and model, broken down by size?

    The requested meter population information is included in the NDA-protected exhibits. Access is provided through the City's established NDA process.

  • Can the utility provide the existing meter inventory by size, including: - Lay length - Connection type (threaded, flanged, etc.)

    The City is unable to provide additional information beyond the characteristics included in the meter population exhibit.

  • Would the utility like alternate pricing for ultrasonic meters in residential applications where positive displacement meters may also meet requirements?

    Proposers may provide alternate pricing for consideration by the City.

  • Please confirm the required unit of measure and meter resolution. - The RFP indicates billing in 100 cubic feet (CCF). - Is encoder output also required in cubic feet? - What encoder/register resolution is required for AMI integration? - What connector type is required for AMI endpoint integration?

    Meters and encoders must provide readings to AMI water endpoints in units no greater than one-tenth of a cubic foot. PWP has no preference regarding the encoder for new meters.

Plain text

OpenGov categories

  • 22 · Utilities
  • 221 · Utilities
  • 2371 · Utility System Construction