Skip to content
← Back to search
SolicitationActive

Belle Fountain Ditch Cleanout Phase 2

DEPT OF DEFENSE · W07V ENDIST MEMPHIS

Contract Details

Notice ID
W912EQ26BA002
Opportunity Type
Solicitation
Sub-Agency
DEPT OF THE ARMY
Office
W07V ENDIST MEMPHIS
Posted Date
Friday, September 18, 2026
Response Deadline
Oct 20, 2026, 2:30 PM EDT
PSC Code
Z1PC
Set-Aside
SDVOSB
Place of Performance
Not specified
Status
Active

Description

Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures.

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
Sequoria Chatmon
Email
sequoria.l.chatmon@usace.army.mil
Phone
901-544-0973
Loadingchange history…
Loadingrelated notices…