Clay County Board of County Commissioners is requesting bids from qualified Contractors for CR 220 Phase 2 – Milling and Resurfacing. The project consists of a mill-and-fill operation along County Road 220, including milling approximately one and three-quarter inches (1.75") of existing asphalt pavement and resurfacing with two inches (2") of Asphaltic Concrete SP-12.5, Traffic Level C, in accordance with current Florida Department of Transportation (FDOT) Standards and Specifications. The project also includes maintenance of traffic, quality control, milling and resurfacing of designated turnouts, pavement markings, daily cleanup, and associated work necessary for a complete project. Work on CR 220 will be performed during nighttime hours between 7:00 p.m. and 5:30 a.m., with access maintained throughout construction. Bidders shall submit all inquiries regarding this RFB in the "Question and Answer" tab of the RFB. See "Inquiries/Questions" in the "Instructions to Bidders" below for more information. Bidders are prohibited from contacting, by any means, whether orally, telephonically, electronically or in writing, any member of the Board, any County employee, including the County Manager, the County Attorney or the Commission Auditor, any member of the designated Evaluation Committee or any agent of the County regarding the Request for Bids in any respect during the Request for Bid Period. The Request for Bid Period during which no contact may occur commences from the date of publication of the notice of a Request for Bids and ends upon a Bid Decision becoming final, i.e. after the notice of bid protest period of 72 hours has expired. However, in the event of a notice of protest, the no contact rule continues in place during the Protest Period and does not end until a resolution of the protest has occurred and become final. The following exceptions exist to the no-contact rule: Inquiries may be submitted to the Purchasing Department if specifically provided in the Request for Bids; Pre-bid conferences provided for in the Request for Bids; and Formal presentations by Bidders to the designated Evaluation Committee or to the Board or any committee thereof specifically contemplated in the Request for Bids. The Board reserves the right and power to reject any and all Bids without cause and to waive technical and non-technical or non-material defects in the Request for Bids or submittal of any Bid, and in its discretion to re-advertise the Request for Bids. The Board reserves the right to award Request for Bids which would be in the Best Interest of the County. Interested vendors are advised that the Clay County Board of County Commissioners has a local preference policy and Buy American policy. The complete policy for both can be viewed at: https://www.claycountygov.com/government/purchasing/vendor-information. FOLLOWING THE BID OPENING AND TABULATION, A “NOTICE OF INTENT TO AWARD BID” OR A “NOTICE OF REJECTION OF ALL BIDS” WILL BE POSTED ON THE INTERNET AT: https://procurement.opengov.com/portal/claycounty?status=all. THIS WEBPAGE CAN ALSO BE ACCESSED FROM THE HOMEPAGE OF THE COUNTY’S WEBSITE AT: https://www.claycountygov.com/government/purchasing/formal-bid-solicitations PROSPECTIVE BIDDERS ARE NOTIFIED THAT THE FAILURE TO INCLUDE A PROPER BID BOND OR OTHER SECURITY APPROVED UNDER THE COUNTY’S PURCHASING POLICY, IF REQUIRED FOR THIS REQUEST, WILL RESULT IN REJECTION OF THE BID AND SHALL, AS WELL AS THE FAILURE TO FILE A WRITTEN NOTICE OF PROTEST AND TO FILE A WRITTEN PETITION INITIATING A FORMAL PROTEST PROCEEDING WITHIN THE TIMES AND IN THE MANNER PRESCRIBED IN CHAPTER 8, SECTION I OF THE COUNTY’S PURCHASING POLICY SHALL, CONSTITUTE A WAIVER OF THE RIGHT TO PROTEST THE BID REQUEST, ANY ADDENDUM THERETO, OR THE BID DECISION, AS APPLICABLE, AND TO INITIATE A FORMAL PROTEST PROCEEDING UNDER THE PURCHASING POLICY. THE COUNTY’S PURCHASING POLICY CAN BE VIEWED AT THE COUNTY’S WEBSITE BY FOLLOWING THE APPROPRIATE LINKS FROM THE HOMEPAGE ADDRESS SET FORTH ABOVE. IF A PROSPECTIVE BIDDER IS IN DOUBT WHETHER THIS REQUEST REQUIRES A BID BOND, SUCH PROSPECTIVE BIDDER IS SOLELY RESPONSIBLE FOR MAKING APPROPRIATE INQUIRY. THE BOARD RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS WITHOUT CAUSE AND TO WAIVE TECHNICAL AND NON- TECHNICAL OR NON-MATERIAL DEFECTS IN THE REQUEST OR SUBMITTAL OF ANY BIDS. A PERSON OR AFFILIATE WHO HAS BEEN PLACED ON THE CONVICTED VENDOR LIST FOLLOWING A CONVICTION FOR A PUBLIC ENTITY CRIME MAY NOT SUBMIT A BID ON A CONTRACT TO PROVIDE ANY GOODS OR SERVICES TO A PUBLIC ENTITY, MAY NOT SUBMIT A BID ON A CONTRACT WITH A PUBLIC ENTITY FOR THE CONSTRUCTION OR REPAIR OF A PUBLIC BUILDING OR PUBLIC WORK, MAY NOT SUBMIT BIDS ON LEASES OF REAL PROPERTY TO A PUBLIC ENTITY, MAY NOT BE AWARDED OR PERFORM WORK AS A CONTRACTOR, SUPPLIER, SUBCONTRACTOR, OR CONSULTANT UNDER A CONTRACT WITH ANY PUBLIC ENTITY, AND MAY NOT TRANSACT BUSINESS WITH ANY PUBLIC ENTITY IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO FOR A PERIOD OF 36 MONTHS FROM THE DATE OF BEING PLACED ON THE CONVICTED VENDOR LIST. General Project Requirements Mobilization Maintenance of Traffic (MOT) Railroad Flagging Coordinator/Inspector and Associated CSX Requirements County Road 220 The limits of milling and resurfacing shall be as established in Section 3.2 – Project Location and Limits of Work. Milling - Over One Inch to Two Inches Asphaltic Concrete SP-12.5 Traffic Level C Tack Coat Pavement Marking, Bi-Directional Raised Pavement Marking Mono-Directional Raised Painted Pavement Marking, Skip (6") (White) - Net LF Painted Pavement Marking, Skip (6") (Yellow) - Net LF Painted Pavement Marking, Solid (12") (White) Painted Pavement Marking, Solid (18") (Yellow) Painted Pavement Marking, Solid (24") (White) Painted Pavement Marking, Solid (6") (White) Painted Pavement Marking, Solid (6") (Yellow) Painted, DIRECTIONAL ARROW (LEFT/RIGHT) Painted, ONLY Thermo, DIRECTIONAL ARROW (LEFT/RIGHT) Thermo, ONLY Thermo, Standard, WHITE, SOLID, 12" Thermo, Standard, WHITE, SOLID, 24" Thermo, Standard Bike Path Markings, Symbol with Arrow Thermo, Solid (18") (Yellow) Thermo, Solid (6") (White) Thermo, Solid (6") (Yellow) Thermo, Skip (6") White - Net LF Thermo, Skip (6") Yellow - Net LF Painted, Railroad Crossing Pavement Marking/Symbol Thermo, Railroad Crossing Pavement Marking/Symbol Scope of Work Purpose The Clay County Board of County Commissioners (County) is requesting bids from qualified Contractors to provide milling and resurfacing services along designated portions of County Road 220 (CR 220) in Clay County, Florida. The Work generally consists of milling the existing asphalt pavement, placement of new asphalt pavement, maintenance of traffic, pavement markings, turnout resurfacing, cleanup, and all labor, materials, equipment, supervision, quality control, and incidental work necessary to provide a complete project in accordance with the Contract Documents. All Work and materials shall comply with the current Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction, applicable FDOT Standard Plans, the Manual on Uniform Traffic Control Devices (MUTCD), and all applicable County requirements, unless otherwise specifically stated in the Contract Documents. Project Location and Limits of Work The Project is located along County Road 220 (CR 220) in Clay County, Florida. The limits of milling and resurfacing shall extend from the existing new asphalt pavement joint just west of Lakeshore Drive to the clearly defined asphalt pavement joint immediately east of the railroad crossing near Sleepy Hollow Road, as identified in the RFB and directed by the County Project Manager or designee. No Work shall be performed within the CSX railroad right-of-way. Milling and resurfacing limits shall begin and end at the established CSX railroad right-of-way boundaries, as applicable. The Contractor shall verify the limits of Work in the field with the County Project Manager or designee prior to beginning milling operations. Work within the Project limits shall include the designated travel lanes, turnouts, pavement markings, and associated areas identified by the County. Concrete travel lanes are excluded from milling operations. No pavement markings shall be installed, removed, or refurbished on the concrete bridge deck over Swimming Pen Creek. Scope The Work includes, but is not limited to, milling existing asphalt pavement, placement of Asphaltic Concrete SP-12.5, Traffic Level C, milling and resurfacing designated turnouts, pavement markings, maintenance of traffic, cleanup, and associated roadway work within the Project limits. The Contractor shall furnish all labor, materials, equipment, supervision, transportation, quality control, maintenance of traffic, and incidentals necessary to complete the Work in accordance with the RFB and current applicable FDOT Standards and Specifications. Pre-Qualifications Contractors shall be Florida Department of Transportation (FDOT) Pre-Qualified in the following work classes: Flexible Paving Hot Plant-Mixed Bituminous Courses The above requirements shall also apply to all subcontractors performing work for which the applicable FDOT prequalification is required. General Requirements Mill and Fill Operation The Project shall be performed as a mill and fill operation. The Contractor shall mill the existing asphalt pavement to a depth of one and three-quarter inches (1.75") and place two inches (2") of Asphaltic Concrete SP-12.5, Traffic Level C, in accordance with the Contract Documents and current applicable FDOT Standards and Specifications. Milling Operations Milling shall be performed to a depth of one and three-quarter inches (1.75") to provide a uniform surface suitable for placement of the proposed asphalt course. The Contractor shall maintain the required pavement profile, cross slope, drainage characteristics, and transitions throughout the limits of Work. The Contractor shall take all necessary precautions to protect existing curb and gutter, drainage structures, manholes, valve boxes, pavement structures, utilities, and other improvements within or adjacent to the limits of Work. Concrete travel lanes shall not be milled. The Contractor shall identify and protect concrete pavement located within or adjacent to the limits of Work. Milled surfaces shall be thoroughly swept and cleaned prior to placement of asphalt or reopening the roadway to traffic. Loose material shall not be permitted to enter drainage structures, adjacent properties, or County rights-of-way. Asphalt Resurfacing Following completion of milling and preparation of the existing pavement surface, the Contractor shall place two inches (2") of Asphaltic Concrete SP-12.5, Traffic Level C in accordance with current FDOT Standards and Specifications. Asphalt mixtures shall be FDOT-certified mixes. The Contractor shall submit the applicable Job Mix Formula (JMF) to the County Project Manager for review and approval prior to placement. The Contractor shall provide smooth transitions between new and existing pavement and shall correct deficiencies, irregularities, segregation, unacceptable joints, or other defective Work at no additional cost to the County. Turnouts The Contractor shall mill and resurface the following intersection turnouts within the Project limits. The anticipated limits of Work shall extend from the CR 220 mainline to the existing pavement joint or end of curb, as identified below: Harmony Hall Road – Approximately 50 feet. Swimming Pen Drive – Approximately 95 feet. Yarmouth Drive – Approximately 35 feet. Kel Lane – Approximately 35 feet. Southlake Drive – Approximately 33 feet. Lakedge Drive – Approximately 30 feet. Lakemont Circle (East Entrance) – Approximately 30 feet. Lakemont Circle (West Entrance) – Approximately 30 feet. The distances provided are approximate and establish the anticipated milling and resurfacing limits for bidding purposes. Final turnout limits shall be field verified and coordinated with the County Project Manager or designee prior to commencement of milling operations. Night Operations All Work performed on CR 220 shall be conducted between the hours of 7:00 p.m. and 5:30 a.m. The Contractor shall schedule and coordinate operations to ensure the roadway is left in a safe condition for daytime traffic at the conclusion of each nightly work period. Equipment, materials, debris, and temporary traffic-control devices not required for daytime traffic conditions shall be removed from the travel way prior to reopening the roadway. Quality Control The Contractor shall provide an onsite qualified Quality Control Supervisor during all milling and paving operations and shall perform all required quality-control activities, testing, documentation, and reporting in accordance with applicable FDOT requirements. Pavement Markings The Contractor shall replace pavement markings removed or affected by milling and resurfacing operations. Repainting of existing worn pavement markings outside the resurfacing limits is not required. Temporary and permanent pavement markings shall comply with applicable FDOT and MUTCD requirements. Existing centerlines, lane lines, edge lines, arrows, messages, symbols, raised pavement markers, and other pavement markings affected by the Work shall be restored as applicable and in accordance with the Pricing Proposal/Schedule of Values (SOV). When temporary pavement markings are required for traffic safety, they shall be installed the same day as milling or resurfacing. Required centerlines and other safety-related temporary markings shall be established prior to reopening the roadway to traffic and maintained until permanent pavement markings are installed. Mono-Directional Raised Pavement Markers (RPMs) shall be installed along the mainline roadway only. Island nose pavement markings and school-related pavement markings are not required for this Project. Stop bars and crosswalk pavement markings at applicable side street intersections shall be included in the Work in accordance with the Pricing Proposal/Schedule of Values (SOV). All crosswalks requiring replacement within the Project limits shall be installed as Special-Emphasis Crosswalks in accordance with current applicable FDOT Standards and Specifications, regardless of the existing pavement marking configuration. The 24-inch crosswalk bars shall be installed using standard thermoplastic pavement markings. Preformed thermoplastic is not required for these crosswalk bars. Railroad crossing pavement markings and symbols shall be replaced using both painted and thermoplastic applications in accordance with applicable FDOT Standards and Specifications and the Pricing Proposal/Schedule of Values (SOV). No Work shall be performed within the CSX railroad right-of-way. Bicycle pavement markings shall be replaced using thermoplastic only. An initial painted application is not required. No pavement markings shall be installed, removed, or refurbished on the concrete bridge deck over Swimming Pen Creek. Final Inspection and Acceptance Upon completion of the Work, the Contractor shall participate in a mandatory final walkthrough with the Clay County P Maintenance of Traffic (MOT) The Contractor shall furnish, install, maintain, and remove all Maintenance of Traffic (MOT) devices necessary to safely perform the Work in accordance with the current applicable FDOT Standard Plans/Indexes and the Manual on Uniform Traffic Control Devices (MUTCD). Post-mounted advance warning signs and Portable Changeable Message Signs (PCMS) are not required for this Project. The Contractor shall remain responsible for providing and maintaining safe and adequate MOT throughout the Project in accordance with applicable FDOT Standards and Specifications. Traffic shall be maintained throughout construction. The Contractor shall maintain access to adjoining roadways, residences, businesses, emergency services, and other properties at all times. The Contractor shall provide all required MOT plans and qualified/certified personnel in accordance with applicable FDOT requirements. A copy of the approved MOT plan shall be maintained onsite during construction. A law enforcement officer shall be provided for nighttime work activities requiring lane or roadway closures. All costs associated with providing, implementing, maintaining, and removing required traffic control measures, including required nighttime law enforcement officers, shall be included in the Maintenance of Traffic (MOT) lump-sum pay item identified in the Pricing Proposal. The lump-sum bid price shall constitute full compensation for these activities, and no separate payment shall be made unless otherwise expressly provided in the Contract Documents. Special Terms and Conditions Unit prices as received shall constitute full compensation to the Contractor for all labor, materials, equipment, supervision, incidentals, and associated activities necessary to complete the Work. No separate payment will be made for work required by the Contract Documents unless specifically identified as a separate pay item. Site Inspections It is incumbent upon all Bidders to examine the site and ensure that they are aware of all conditions that may affect the contract work. The County will not be responsible for conclusions made by the Contractor. No claims for additional compensation will be considered on behalf of any Contractor, subcontractor, materials suppliers or others on account of that person’s failure to be fully informed of all requirements of all parts of this RFB. Work Hours Due to the nighttime operational requirements of this Project, the approved work hours for CR 220 shall be 7:00 p.m. to 5:30 a.m. Work shall be scheduled and performed within these hours unless otherwise approved by the County Project Manager or designee. Any work performed outside of the approved work hours shall require prior County approval. Any additional expenses incurred by the County as a result of Contractor-requested work outside of the approved work hours may be the responsibility of the Contractor. Self-Performed Work The awarded Contractor is required to self-perform with its own workforce a minimum of forty percent (40%) of the overall awarded Contract. Hazardous Materials The Contractor shall notify the County Project Manager or designee of any hazardous materials used or stored on the Work site and shall maintain and provide applicable Safety Data Sheets (SDS) in accordance with applicable federal, state, and local requirements. Any spill or release of hazardous materials or waste caused by the Contractor or its subcontractors shall be immediately reported to the County Project Manager or designee and shall be contained, cleaned up, and disposed of in accordance with all applicable federal, state, and local laws and regulations. All costs associated with the cleanup, remediation, and disposal of any spill or release caused by the Contractor or its subcontractors shall be the sole responsibility of the Contractor at no additional cost to the County. Upon request, the Contractor shall provide documentation demonstrating compliance with applicable regulatory requirements associated with any required cleanup. Permit & Fees The Contractor shall obtain and maintain all permits, licenses, approvals, and inspections required to perform the Work in accordance with the Contract Documents and applicable federal, state, and local requirements. Unless otherwise specified in the Contract Documents, the Contractor shall be responsible for all applications, coordination, permits, inspections, fees, bonds, and other charges necessary to perform and complete the Work. If a County permit is required, the Project is not exempt from permit fees, and applicable fees shall be pa
Published attachments
Addenda and notices
Official Notice #1: Mandatory Pre-Bid Meeting · 1
Attached is the sign in sheet from the Mandatory Pre-Bid meeting that was held on the following date/time and location: October 29, 2026 @ 9:00 AM Clay County Administration Building 477 Houston St Green Cove Springs, Florida 32043
Addendum #1 · 1
Per this addendum the following Sections have been updated: Section 2 – Instructions to Bidders Section 2.22(d) – Property Coverage (Builder's Risk): Builder's Risk Insurance is not applicable to this Project. All other applicable insurance requirements remain unchanged. Section 3 – Scope of Work Section 3.2 – Project Location and Limits of Work Clarification of milling and resurfacing limits. Exclusion of Work within the CSX railroad right-of-way. Exclusion of pavement marking operations on the Swimming Pen Creek Bridge. Section 3.5 – General Requirements Subsection D – Turnouts: Identification of designated intersection turnouts and anticipated milling and resurfacing limits. Subsection G – Pavement Markings: Clarification of pavement marking replacement requirements. Clarification of Mono-Directional Raised Pavement Marker (RPM) installation limits. Removal of island nose and school-related pavement marking requirements. Clarification of side street stop bar and crosswalk requirements. Incorporation of Special-Emphasis Crosswalk requirements and applicable thermoplastic material. Incorporation of painted and thermoplastic railroad crossing pavement marking/symbol requirements. Clarification of thermoplastic-only bicycle pavement marking requirements. Exclusion of pavement marking operations on the Swimming Pen Creek Bridge. Section 3.6 – Maintenance of Traffic (MOT) Clarification of post-mounted advance warning signs and Portable Changeable Message Signs (PCMS) requirements. Inclusion of required nighttime law enforcement costs in the MOT lump-sum pay item. Section 3.12 – Permit & Fees Incorporation of Contractor responsibilities for CSX railroad coordination, flagging, inspections, applicable fees, and associated requirements. Section 3.13 – Clean up & Restoration of Site Clarification of County ownership of asphalt millings, designated delivery location, and Contractor responsibilities for transportation and unloading. Clarification of subsequent stockpile management responsibilities. Section 3.19 – Payment Clarification of measurement and payment for skip pavement markings based on net linear feet of material applied. Section 3.20 – Warranty Incorporation of applicable FDOT asphalt pavement warranty criteria. Section 3.21 – Term Clarification of permanent thermoplastic pavement marking installation requirements. Clarification of the thirty (30) calendar-day Final Completion
Addendum #2 · 2
Per this addendum, the following Section has been updated: Section 1.3 - Timeline Bid Due: December 3, 2026, 4:00pm Bid Open: December 4, 2026, 9:00am Section 5 - Supplier Questionnaire Question 34: FDOT Prequalification Form update
Public questions and answers
Will the county be providing plans for this project?
The County will not be providing construction plans for this project. Project maps will be the only documents provided to identify the project locations and associated work areas.
Will the county keep the millings and if so, what yard will the millings be delivered to?
All asphalt millings generated during the performance of this Contract shall remain the property of Clay County. The Contractor shall be responsible for the collection, loading, transportation, and delivery of all asphalt millings to the County-designated disposal and storage location at the CR 220 Pit, 216 Sleepy Hollow Road, Middleburg, FL 32068.
CSX's published Contractor Information states that CSXT provides contractor requirements to the facility owner and that, once the agreement has been executed, the Contractor does not separately apply for a Right of Entry permit but is provided an Outside Party form with the executed agreement. Please confirm whether the County has executed the required agreement with CSX for this project and provide the applicable CSX contractor requirements and Outside Party information for bidding purposes.
No work will be performed within the CSX right-of-way. Milling and resurfacing limits shall begin and end at the established CSX right-of-way boundaries. The County will issue a forthcoming Addendum revising Section 4 – Pricing Proposal to incorporate a separate lump-sum bid item for the Railroad Flagging Coordinator/Inspector and all other applicable CSX requirements. Bidders shall include in this lump-sum item all costs associated with obtaining, coordinating, scheduling, and providing the required railroad-related services, including any applicable CSX fees, inspections, flagging, and associated administrative requirements. The Contractor shall be responsible for coordinating and securing all required railroad-related services, ensuring compliance with applicable CSX requirements, and scheduling such services within the timeframe established in the Scope of Work. The lump-sum bid price shall constitute full compensation for all railroad-related services and requirements associated with the Project.
Please confirm that any CSX agreement, Right of Entry, access, review, risk, or other railroad fees required for the project will be obtained and paid by the County and are not to be included in the Contractor's bid.
No work will be performed within the CSX railroad right-of-way; therefore, the County does not require a CSX agreement for this project. Milling and resurfacing limits will begin and end at the CSX right-of-way boundary. The County will issue an Addendum to include a lump-sum bid item for the Railroad Flagging Coordinator/Inspector and all associated CSX fees and requirements. All applicable CSX-related costs shall be included in the Contractor's lump-sum bid price. The Contractor shall be responsible for obtaining, coordinating, and scheduling the required railroad services and fulfilling all associated requirements within the timeframe established in the Scope of Work.
Due to the proximity of the proposed paving limits to the railroad and the necessity for paving equipment and construction traffic to cross the tracks, please identify the CSX protection/flagging requirements established for the project and confirm whether all CSX protection/flagging charges will be paid directly by the County or are to be included in the Contractor's bid.
No work will be performed within the CSX railroad right-of-way. Milling and resurfacing limits will begin and end at the CSX right-of-way boundary. The County will issue an Addendum to include a lump-sum bid item for the Railroad Flagging Coordinator/Inspector and all associated CSX protection, flagging, fees, and requirements. All applicable CSX-related costs shall be included in the Contractor's lump-sum bid price and will not be paid separately by the County. The Contractor shall be responsible for obtaining, coordinating, and scheduling all required railroad protection and flagging services within the timeframe established in the Scope of Work.
CSX's published Contractor Information states that, for the referenced municipal project arrangement, the County pays the project risk fee for coverage under CSXT's blanket policy and that only one project risk fee or policy is required. Please identify the Railroad Protective Liability requirements established for this project and confirm whether the required policy/risk fee will be provided and paid by the County or is to be included in the Contractor's bid.
No work will be performed within the CSX railroad right-of-way; therefore, the County does not require a CSX agreement for this project. Milling and resurfacing limits will begin and end at the CSX right-of-way boundary. The County will issue an Addendum to include a lump-sum bid item for the Railroad Flagging Coordinator/Inspector and all associated CSX fees and requirements, including any applicable Railroad Protective Liability insurance or project risk fees. All applicable CSX-related costs shall be included in the Contractor's lump-sum bid price. The Contractor shall be responsible for obtaining, coordinating, and scheduling all required railroad services and fulfilling associated requirements within the timeframe established in the Scope of Work.
If any CSX railroad-related fees are to be included in the Contractor's bid, please identify the specific required fee(s), current amount(s), and basis for payment so that all bidders may carry the same requirements.
No work will be performed within the CSX railroad right-of-way; therefore, the County does not require a CSX agreement for this project. Milling and resurfacing limits will begin and end at the CSX right-of-way boundary. The County will issue an Addendum to include a lump-sum bid item for the Railroad Flagging Coordinator/Inspector and all other associated CSX fees and requirements. All applicable CSX-related costs shall be included in the Contractor's lump-sum bid price. The Contractor shall be responsible for obtaining, coordinating, and scheduling the required railroad services and fulfilling all associated requirements within the timeframe established in the Scope of Work.
CSX's published contractor requirements state that thirty (30) days should be allowed for project scheduling and that protection services cannot be expedited due to availability of CSXT personnel. The Contract allows 45 calendar days to substantial completion. Please confirm that delays associated with obtaining or scheduling required CSX access, flagging/protection services, or other railroad coordination will be considered excusable delays and will result in an appropriate extension of Contract Time when such services cannot be provided within the Contractor's requested schedule.
No work will be performed within the CSX railroad right-of-way; therefore, the County does not require a CSX agreement for this project. Milling and resurfacing limits will begin and end at the CSX right-of-way boundary. The County will issue an Addendum to include a lump-sum bid item for the Railroad Flagging Coordinator/Inspector and all associated CSX fees and requirements. The Contract Time will remain unchanged at forty-five (45) calendar days to substantial completion. The Contractor shall be responsible for obtaining, coordinating, and scheduling all required CSX railroad services and fulfilling associated requirements within the established Contract Time.
The Contract provides 45 calendar days to substantial completion. Considering the required milling and resurfacing quantities, required waiting periods for final thermoplastic pavement markings, and CSX coordination and scheduling requirements, please confirm whether the County will increase the Contract Time. If the 45-calendar-day duration will remain unchanged, please clarify how the County intends for these requirements to be accommodated within the Contract Time.
The Contract Time will remain unchanged at forty-five (45) calendar days to substantial completion. The Contractor shall be responsible for coordinating and scheduling all required work, including CSX railroad coordination, flagging/inspection services, and any associated railroad requirements, within the established Contract Time. No extension of Contract Time will be granted solely for these coordination and scheduling activities.
The Scope states that turnouts are to be milled and resurfaced “as directed by the County Project Manager,” with limits field verified prior to milling. Please identify the specific turnouts and limits (distance from mainline) to be included prior to bid so bidders can establish the basis for their unit prices.
The Contractor shall mill and resurface the following intersection turnouts as part of the project scope. The limits of work shall extend from the CR 220 mainline (ML) to the existing pavement joint or end of curb, as identified below: -Harmony Hall Road: From the mainline to the existing pavement joint at the end of curb, approximately 50 feet. -Swimming Pen Drive: From the mainline to the existing pavement joint at the end of curb, approximately 95 feet. -Yarmouth Drive: From the mainline to the existing pavement joint, approximately 35 feet. -Kel Lane: From the mainline to the existing pavement joint at the end of curb, approximately 35 feet. -Southlake Drive: From the mainline to the existing pavement joint at the end of curb, approximately 33 feet. -Lakedge Drive: From the mainline to the existing pavement joint at the end of curb, approximately 30 feet. -Lakemont Circle (East and West Entrances): From the mainline to the existing pavement joint at the end of curb, approximately 30 feet for each entrance. The distances provided are approximate and establish the anticipated milling and resurfacing limits for bidding purposes. Final limits shall be field-verified and coordinated with the County Project Manager prior to commencement of milling operations.
The Scope requires repainting of existing worn pavement markings within the Project limits, including markings on lanes not resurfaced, “as directed by the County Project Manager.” Please identify prior to bid the locations and limits of pavement markings outside the resurfacing limits to be included so bidders can establish the basis for their unit prices.
The Contractor shall only be required to replace pavement markings removed or affected by milling and resurfacing operations. Repainting of existing worn pavement markings outside the resurfacing limits is not required. The Scope of Work will be revised accordingly through a future Addendum.
Please confirm permanent thermoplastic pavement markings are not required for Substantial Completion and may be installed between Substantial Completion and Final Completion.
The County confirms that permanent thermoplastic pavement markings are not required for Substantial Completion and may be installed between Substantial Completion and Final Completion. The Contractor shall ensure that all required temporary pavement markings and traffic control measures are maintained in accordance with applicable FDOT Standards and Specifications and MUTCD requirements until permanent pavement markings are installed. All permanent pavement markings shall be completed prior to Final Completion.
The Contract requires compliance with applicable FDOT specifications; however, the Bid Form does not provide separate pay items for Mobilization or Maintenance of Traffic. Please clarify the basis of payment for Mobilization, Maintenance of Traffic, and required nighttime law enforcement/traffic control officer costs.
The County will issue a forthcoming Addendum revising Section 4 – Pricing Proposal to include separate lump-sum bid items for Mobilization and Maintenance of Traffic (MOT). Bidders shall include all costs associated with mobilization activities under the Mobilization bid item. All costs associated with providing, implementing, maintaining, and removing required traffic control measures, including nighttime law enforcement officers required for lane or roadway closures, shall be included in the Maintenance of Traffic lump-sum bid item. The respective lump-sum bid prices shall constitute full compensation for these activities, and no separate payment will be made unless otherwise expressly provided in the Contract Documents.
Sections 2.8 and 2.38 provide different bid validity/withdrawal periods of 30 days and 120 days, respectively. Please confirm the applicable bid validity period.
Section 2.8 pertains specifically to the Bid Bond requirements, including the thirty (30) day period associated with the Bid Bond. This provision does not govern the validity period of the Bid Proposal. Section 2.38 pertains specifically to the Bid Proposal and establishes a validity period of one hundred twenty (120) days. This provision does not apply to the submitted Bid Bond. Accordingly, the thirty (30) day period under Section 2.8 applies to the Bid Bond, while the one hundred twenty (120) day period under Section 2.38 applies to the Bid Proposal. These requirements are separate and shall be administered independently.
Please confirm whether the Builder's Risk requirements of Section 2.22(d) apply to this milling and resurfacing project.
The County confirms that the Builder's Risk insurance requirements outlined in Section 2.22(d) do not apply to this project. All other applicable insurance requirements under Section 2.22 shall remain in effect.
Line Item 6 provides “Painted Pavement Marking, Island Nose (Reflective Paint) (Yellow),” 140 LF, while Line Item 26 provides “Thermo, Island Nose (Reflective Paint) Yellow,” 140 LF. Please clarify Line Item 26, as the description references both thermoplastic and reflective paint and appears to duplicate Line Item 6. Additionally, FDOT island nose/bullnose painting is measured by square foot. Please confirm the intended material and unit of measure and whether both Line Items 6 and 26 are required.
Island nose pavement markings are not required for this project. The County will issue an Addendum removing Line Items 6 and 26 from the Bid Form.
The Bid Form provides LF as the unit of measure for longitudinal pavement markings. For skip pavement markings, please confirm the bid quantities and payment will be based on the gross longitudinal length, including the gaps between applied markings, rather than the net LF of material applied.
Bid quantities and payment for skip pavement markings shall be based on the net linear feet (LF) of material applied. Only the actual painted or thermoplastic segments shall be measured for payment. Gaps between pavement marking segments shall not be included in the measured quantities.
Please confirm the County-designated millings stockpile location will be provided with sufficient lighting by the County for nighttime hauling and dumping operations.
All asphalt millings generated during the performance of this Contract shall remain the property of Clay County. The Contractor shall be responsible for the collection, loading, transportation, and unloading of all asphalt millings at the County-designated storage location, CR 220 Pit, located at 216 Sleepy Hollow Road, Middleburg, FL 32068. The Contractor's responsibility at the designated location shall be limited to unloading/dumping the asphalt millings in the area designated by the County. The County's heavy equipment operator shall be responsible for subsequent stockpiling, spreading, and management of the delivered millings.
Please confirm the Contractor’s responsibility for County-retained millings is limited to hauling and dumping at the County-designated location, and that all stockpiling, spreading, pushing up, and pile management after dumping will be performed by others.
The County confirms that the Contractor's responsibility for County-retained asphalt millings shall be limited to the collection, loading, transportation, and unloading/dumping of the millings at the County-designated location, CR 220 Pit, located at 216 Sleepy Hollow Road, Middleburg, FL 32068. The Contractor shall unload the millings in the area designated by the County. All subsequent stockpiling, spreading, pushing up, and management of the millings after unloading shall be performed by others and shall not be the responsibility of the Contractor.
Section 3.20 requires a two-year warranty for the Work; however, no asphalt pavement warranty performance criteria are provided. Please clarify whether the warranty will be administered in accordance with applicable FDOT asphalt pavement warranty criteria. If not, please provide the pavement distress thresholds, evaluation procedures, and remedial work requirements that will govern the two-year warranty.
The County confirms that the two-year warranty required under Section 3.19 shall be administered in accordance with applicable Florida Department of Transportation (FDOT) asphalt pavement warranty criteria. The applicable FDOT standards shall govern pavement distress thresholds, evaluation procedures, and required corrective actions throughout the two-year warranty period.
Section 2.3 states that all Addenda issued shall become part of the RFB and Contract Documents, while Section 2.21 provides for responses to bidder inquiries through the Question and Answer tab but does not state that such responses become part of the Contract Documents. Please confirm that all County responses issued through the Question and Answer tab that revise, clarify, or otherwise modify the requirements of the RFB will be incorporated into an Addendum and made part of the Contract Documents.
All County responses issued through the Question and Answer tab are publicly available to all prospective Bidders through the County's e-Procurement Portal to ensure transparency and consistent communication. Responses that provide clarification of existing RFB requirements will remain available through the Question and Answer tab for Bidder reference. Responses that require formal revisions or modifications to the RFB, including changes to the Scope of Work, Pricing Proposal, or other Contract Documents, will be incorporated into an Addendum, as applicable. In accordance with Section 2.3, all formally issued Addenda shall become part of the RFB and Contract Documents. Bidders are responsible for reviewing all published responses and acknowledging issued Addenda as required.
What is the engineer's estimate.
The Schedule of Values (SOV) provided in the bid documents serves as the County’s estimate for the project.
The RFB requires Maintenance of Traffic in accordance with applicable FDOT Standards and Specifications; however, no Temporary Traffic Control Plan is provided. Please confirm whether post-mounted advance warning signs and/or Portable Changeable Message Signs (PCMS) are required for this project. If required, please provide the required quantities, locations, duration, and message/sign requirements to be included in the bid.
Post-mounted advance warning signs and Portable Changeable Message Signs (PCMS) are not required for this project. The Contractor shall be responsible for providing safe and adequate Maintenance of Traffic (MOT) in accordance with applicable FDOT Standards and Specifications and the requirements outlined in the RFB.
Item 5 (Mono-Directional RPMs, 1,560 EA): Please clarify the intended locations. Existing markers appear limited to lane lines, and no markers exist at the island noses.
Mono-Directional Raised Pavement Markers (RPMs) shall be installed along the mainline roadway only. RPMs are not required at island noses.
Side streets: Are crosswalks and stop bars on the side streets included in the striping quantities, and how far up each side street do the limits extend?
Yes, stop bars and crosswalk striping are included in the bid quantities. Not all side streets will require milling and resurfacing. For side streets included in the scope of work, milling and resurfacing shall extend to the existing pavement joint.
Bridge over Swimming Pen Creek: The deck is concrete and excluded from milling. Are the bridge markings to be refurbished in thermoplastic?
No, pavement striping on the Swimming Pen Creek Bridge is not included in the scope of work.
The Bid Form does not provide a pay item for the railroad crossing pavement marking/symbol. Please confirm whether the existing railroad crossing markings are to be replaced and, if so, provide the applicable pay item and quantity. Additionally, please confirm whether the 24" white lines associated with the railroad crossing are included in the quantities for Line Items 11 and 20.
The railroad crossing pavement marking/symbol shall be replaced, and an additional pay item will be added to the Bid Form. The 24-inch white lines associated with the railroad crossing are already included in the existing bid quantities as an Each (EA) item. Additionally, the two (2) school-related pavement marking items will be removed from the Bid Form, as Clay County has eliminated the existing school zone at Swimming Pen Creek.
The Contract Documents require pavement markings to comply with current FDOT Standards and Specifications. Existing crosswalks at certain signalized intersections within the project limits are not configured as special-emphasis crosswalks. Please confirm whether the Contractor is to restore the existing pavement marking configuration or restripe these locations as special-emphasis crosswalks in accordance with current FDOT standards.
All crosswalks requiring replacement within the project limits shall be restriped as Special-Emphasis Crosswalks in accordance with current applicable FDOT Standards and Specifications, regardless of the existing pavement marking configuration.
If special-emphasis crosswalks are required, please clarify whether the 24-inch crosswalk bars are to be installed using standard thermoplastic or preformed thermoplastic in accordance with applicable FDOT requirements. If preformed thermoplastic is required, please provide the applicable pay item and quantity in the Bid Form.
The 24-inch bars for Special-Emphasis Crosswalks shall be installed using standard thermoplastic pavement markings in accordance with applicable FDOT Standards and Specifications. Preformed thermoplastic is not required.
The “Updated Map” identifies the project limits as extending “from train tracks near Sleepy Hollow to the west of Lakeshore”; however, the highlighted project limits shown on the same map appear to extend significantly west of Lakeshore Drive. Please clarify the intended paving limits and provide a revised map or other clear depiction identifying all limits of milling and resurfacing, including turnouts, to be included in the bid.
The project limits extend from the existing new asphalt pavement joint just west of Lakeshore Drive to the clearly defined asphalt pavement joint immediately east of the railroad crossing near Sleepy Hollow Road.
The Bid Form includes a painted pavement marking item for bicycle symbols and a corresponding standard thermoplastic item. Per the referenced FDOT standards, bicycle pavement markings are not required to receive an initial painted application and are required to be preformed thermoplastic. Please clarify whether the painted bicycle marking items are required and revise the thermoplastic item to preformed thermoplastic, as applicable.
Bicycle pavement markings shall be replaced using thermoplastic only. An initial painted application is not required. The Bid Form will be revised through an Addendum to remove the painted bicycle pavement marking item.
If pavement markings are required to be refurbished on the concrete bridge deck over Swimming Pen Creek, please confirm whether PPRT and incidental removal of the existing pavement markings will be required in accordance with the referenced FDOT Specifications. If required, please provide the applicable pay item(s) and quantities in the Bid Form.
No pavement markings will be installed or refurbished on the concrete bridge deck over Swimming Pen Creek. Therefore, PPRT and removal of existing pavement markings are not required. Refer to the County's response to Question 26 for additional clarification.