DAY DOCK AT RIVERWALK PARK

Description

As part of the comprehensive Riverfront Park development enhancement and public access, the City of Port Orange is seeking to build a Day (transient) Docking facility. The intent of this Day Dock facility is to provide recreational boaters access to the City's landward park amenities. The current intent is to develop a phased approach that will ultimately allow the City to accommodate up to 35-foot boat vessels. This project will accommodate mooring of up to ten (10) vessels with a potential to add more slips as demand increases. Currently there is no ability for boaters to dock to use the park facility and amenities at this location. This project will increase transient docking availability which allows all boaters along the ICW to safely dock and use the park especially larger transient boats. SECTION 3 - SCOPE OF WORK SCOPE OF WORK: This project involves the installation of a fixed timber access dock, one aluminum gangway, a concrete floating dock system, along with the necessary concrete piles for the floating dock system. Additionally, the project includes mechanical dredging, installation of private aids to navigation, concrete sidewalk and curbing, fire hydrant, FDC & standpipe system, dock lighting and electrical utilities, mangrove plantings and an environmental informational kiosk with environmental signs and a monofilament bin, as specified in the construction plans and technical specifications provided in the bid package. The project site is located within the Florida Intracoastal Waterway (ICW), and all work related to erosion and turbidity monitoring and control, in compliance with state and federal regulations, is part of the project scope. Please refer to (Attachment 2) Project Technical Specifications, (Attachment 3) Construction Drawings, (Attachment 4) Geotechnical Evaluation and (Attachment 5) Environmental Permits. LEGAL NOTICE TO BIDDERS (MANDATORY) ITB-26-26-CW - DAY DOCK AT RIVERWALK PARK Notice is hereby given that the City of Port Orange is soliciting proposals for ITB-26-26-CW - DAY DOCK AT RIVERWALK PARK . Bids will be accepted in until 2:30 pm Eastern Standard Time (EST) on Friday, December 11, 2026 , which may be amended by addendum issued by the City. All untimely bids will be rejected. All bids will be evaluated to ensure they contain all the required forms in order to deem the Respondent responsive or non-responsive. Bids will be opened and bidder(s) names and price will be read aloud at 2:30 pm EST in the Council Chambers located on the first floor of City Hall, 1000 City Center Circle, Port Orange, Florida 32129. Note : Bids read aloud at the bid opening is not binding until there has been a responsive and responsible review by Purchasing in determining who is the lowest price, responsible, and responsive bidder . There will be a mandatory Pre-Bid Conference and site visit for the project at 10:00 am EST on Monday, November 16, 2026 at Council Chambers, located at the City of Port Orange at 1000 City Center Circle, Port Orange, FL 32129. Site visit will follow after the Pre-Bid meeting. . In order to be eligible to submit a bid, prospective bidders must attend the mandatory Pre-Submittal Conference and Site Visit. All attendees to the Pre-Submittal Conference MUST sign in. The representative of each Bidder shall be an authorized employee of the Bidder and shall sign in accordingly. Bidders are urged to obtain bid documents and familiarize themselves with the documents prior to the Pre-Submittal Conference. Site Visit - Day Dock at Riverwalk Park, 3459 Ridgewood Avenue, Port Orange, Florida 32129 November 16, 2026, at 10:00 am. DESCRIPTION: DAY DOCK AT RIVERWALK PARK . As part of the comprehensive Riverfront Park development enhancement and public access, the City of Port Orange is seeking to build a Day (transient) Docking facility. The intent of this Day Dock facility is to provide recreational boaters access to the City's landward park amenities. The current intent is to develop a phased approach that will ultimately allow the City to accommodate up to 35-foot boat vessels. This project will accommodate mooring of up to ten (10) vessels with a potential to add more slips as demand increases. Currently there is no ability for boaters to dock to use the park facility and amenities at this location. This project will increase transient docking availability which allows all boaters along the ICW to safely dock and use the park especially larger transient boats. Bidders must be a commercial entity licensed to do business in the State of Florida and perform the services identified herein. Bidders must be properly registered and licensed to provide the services identified in the scope of work, by all applicable state and local agencies. All Invitation to Bid (ITBs) are solicited and will be evaluated on the requirements outlined in the ITB. Copies of the bid documents, requirements, scope of service and all other pertinent information necessary to submit a complete package may be obtained electronically from the City of Port Orange Purchasing web page at www.port-orange.org/bids.aspx and OpenGov at https://procurement.opengov.com/portal/portorangefl . All questions must be submitted electronically via https://procurement.opengov.com/portal/portorangefl . Last day for questions will be Monday, November 23, 2026 at 4:00 pm EST. The Cone of Silence begins with the issuance of the solicitation document and continues until City Council meets to make a final decision on an award. During this time respondents, suppliers, contractors and sub-contractors are prohibited from all communications regarding the solicitation with City staff, City consultants, City legal counsel, City agents, or elected officials. Any respondent who initiates any discussions or attempts to influence a member or members of the aforementioned shall be disqualified from continued participation in the procurement process with regard to that particular solicitation. While the Cone of Silence is in effect, all communications from potential respondents, suppliers, contractors and sub-contractors must be directed to the Purchasing Division @ purchdiv@port-orange.org . SPECIAL NOTE : The City of Port Orange has transition from DemandStar to OpenGov for our solicitations. Since this is a new platform for the City, and for the Bidders submitting, we will be offering two different ways in submitting a bid, which is considered a Hybrid submittal for soliciting projects for a limited time only for which the City will be requesting electronic bids only . As of right now, Bidders are required to submit BOTH an electronic submittal and a hand-delivered submittal . In addition to submitting electronic bids, bidders are also required to submit a hard copy to the City desiring to provide services, as described herein shall submit sealed bids in addition to submitting one (1) original and one (1) digital (flash drive) version in PDF format, in conformance with the detailed submittal instructions. If Bidders are not familiar with OpenGov, the platform is FREE in creating an account and signing with OpenGov by signing up at https://procurement.opengov.com/login. For more information, please refer to the solicitation documents on this change. The City invites bidders to respond to this Initiation to Bid (ITB) for the DAY DOCK AT RIVERWALK PARK . The City anticipates to awarding to one (1) responsible and responsive bidder. The contract term will be for one hundered eight (180) days from issuance of Notice to Proceed. Bids received after the submission deadline will be rejected. It is the bidder's responsibility to ensure they commence their upload submittal timely to meet the submission deadline. The City shall not be responsible for delays caused by an occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. On-line Pro SECTION 1 - PURPOSE AND OVERVIEW The purpose of this Invitation to Bid (ITB) is to solicit competitive bids from Firms or Companies (Bidders) for the The purpose of this Invitation to Bid (ITB) is to solicit competitive sealed bids from Firms or Companies (Bidders) for the Day Dock at Riverwalk Park. The awarded bidder is required to provide all the necessary labor, services, supplies, equipment, tools, consumables, transportation, skills, and incidentals incidentals to mechanically dredge within the proposed location to construct a new fixed timber dock, with a concrete floating dock system, installation of private aids to navigation, Fire Department Connection (FDC) services. This project has obtained grant funding from Florida Inland Navigation District (F.I.N.D.) and City funding sources. It is the intent and purpose of the City of Port Orange (City) that this ITB promotes competitive selection. It shall be the Bidder’s responsibility to advise the Purchasing Division if any language, requirements, etc. or any combination thereof, inadvertently restricts or limits the requirements stated in the ITB to a single source. Only one (1) bidder will be selected from this solicitation. [Remainder of this page left internationally blank] SECTION 2 - INSTRUCTION TO BIDDERS The City of Port Orange is now using OpenGov for soliciting city projects. Bidders who are not listed in OpenGov, will need to be register as soon as possible so in order to submit on this project electronically. Bidders shall create a FREE account with OpenGov by signing up at h ttp s:// p rocurement.o p en g ov.com/lo gi n . Once you have completed account information, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic submittal. Bidders are required to submit an electronic submittal. The City invites bidders to respond to this Initiation to Bid (ITB) for the DAY DOCK AT RIVERWALK PARK . The City anticipates to awarding to one (1) responsible and responsive bidder. The contract term will be for o ne hundred eighty (180) days from Issuance of Notice to Proceed. Bids received after the submission deadline will be rejected. It is the bidder's responsibility to ensure they commence their upload submittal timely to meet the submission deadline. The City shall not be responsible for delays caused by an occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. On-line Provider Disclaimer The City of Port Orange Purchasing Department is the official source to obtain information relating to the City solicitations. All documents regarding this solicitation are posted utilizing an online bid management system, OpenGov. There is no charge to register with OpenGov and/or to participate in the solicitation process. This is a third-party provider that provides a platform to communicate solicitation information to the Public. OpenGov does not represent the City nor does communications through this provider constitute communications to the City. The City of Port Orange is not responsible for errors and omissions occurring in the transmission or downloading of any documents from the online website. In the event of any discrepancy between information on this website and the hard copy specifications, the terms of the hard copy specification will control. Offers by telephone, email or fax will not be accepted. All bids will be opened publicly and the names of all Bidders shall be read aloud. All conferences and meetings regarding this ITB are recorded electronically (audio only). The City of Port Orange reserves the right to reject any or all bids or parts of bids if it is in the best interest of the City. Offers by telephone, email or fax will not be accepted. All bids will be opened publicly and the names of all Bidders shall be read aloud. All conferences and meetings regarding this ITB are recorded electronically (audio only). The City of Port Orange reserves the right to reject any or all bids or parts of bids if it is in the best interest of the City. OpenGov Technical Support: For Technical Support, Respondents can reach the OpenGov Service Desk: Chat (preferred): Click the button in the lower right-hand corner of the portal. Email: https://procurement.opengov.com/login Phone: 1 (605) 336-7176 Hours: Mon-Fri 7am - 10pm ET Timely Questions Regarding this Solicitation The questions and answer module of OpenGov is being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, November 23, 2026 4:00 pm ET. Respondents are instructed not to contact the initiating division directly. Consideration for modification or alternation of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other contract documentation shall be considered binding. The City shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Purchasing Division. Answers for timely questions will be addressed in the OpenGov questions and answer module and an addendum to those questions will be issued and uploaded onto OpenGov. Beyond questions and answers, any and all modifications, clarifications, interoperations and supplemental instructions will be in the form of a written addenda which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documentation and receipt shall be acknowledged of any addenda before formally submitting a bid for this project. Untimely questions are unable to be submitted in the question-and-answer module, thereafter, Respondents raising critical concerns must email purchdiv@port-orange.org. Critical clarifications may be made via addenda; however, untimely questions may not be considered. ADDENDA The City will issue responses to inquiries and any other corrections or amendments it deems necessary in written addenda issued prior to the bid due date. Bidders should not rely on any representations, statements or explanations other than those made in this ITB or in any addendum to this ITB. Where there appears to be a conflict between the ITB and any addenda issued, the last addendum issued will prevail. The Bidder should verify prior to submitting a bid that all addenda have been received and reviewed. All addenda will be published on the City Purchasing web page at www.port‐orange.org/bids.aspx and the OpenGov website at h ttp s:// p rocurement.o p en g ov.com/lo gi n . The City of Port Orange reserves the right to consider the omission of an acknowledgment of addendum as cause for rejection of the ITB submittal. This provision exists solely for the convenience and administrative efficiency of the City of Port Orange. No Bidder or other third party gains any rights by virtue of this provision or the application thereof, nor shall any Bidder or third party have any standing to sue or cause of action arising therefrom. CLARIFICATIONS It is the Bidder’s responsibility to become familiar with and fully informed regardi SECTION 4 - STANDARD PURCHASING DEFINITIONS The City will use the following definitions in instructions to respondents, terms and conditions, special provisions, technical specifications and any other solicitation documents. Addendum is a formal written document, released prior to the public opening that modifies any aspect of a solicitation. Plural: Addenda Alternate Bid means multiple bids with substantive variations from the same Bidder in response to a Solicitation. Amendment is a formal written agreement, signed by both parties, that modifies and existing contractual agreement. Appropriate, Appropriated or Appropriation means the adoption by the City Council of the City of a budget for a fiscal year that includes payments to be made under the Contract during the respective fiscal year. Best Value means the highest overall value to the City based on factors that include, but are not limited to, price, quality, design and workmanship. Bid is a complete, properly signed response to an Invitation to Bid, which if accepted, would bind the Bidder to perform the resultant Contract. Bid Guaranty (Bid Bond) guarantees that the Bidder will not withdraw the Bid within the period specified for acceptance and will execute a Contract and furnish required bonds and any necessary insurance within the time specified in the solicitation unless a longer time is allowed by the City. The guarantee will be returned to the Bidder upon execution of a Contract. Bidder, Proposer or Respondent is a person, firm or entity that submits a Response to a Solicitation. Any Bidder, Proposer or Respondent may be represented by an agent after submitting evidence demonstrating the agent’s authority. The agent cannot certify as to his own agency status. City means the City of Port Orange. Competitive (Formal) Solicitation is the process of requesting and receiving two or more sealed bids, proposals, statements of qualifications or replies submitted by responsive Bidders or Respondents in accordance with the terms of a competitive process, regardless of the method of procurement. Competitive Negotiation means a method for acquiring good, services and construction for public use in which discussions or negotiations may be conducted with responsible offerors who submit Responses through a competitive process, regardless of the method or procurement. Competitive Range means the responsive submissions that meet the evaluation criteria and are considered to be reasonably susceptible of award. Construction means the process of building, repairing, improving and alterations, conversion or extension of buildings, parks, utilities, streets or other improvements or alterations to real property. Contract is a written agreement or purchase order issued for the purchase of goods or services. Contractor means the person, firm or entity selling goods or services to the City under a Contract. Deliverables means the goods, products, materials and/or services to be provided the City by a Bidder or Respondent. Due Date means the date and time specified for the receipt of responses to a solicitation. End User is a person, program, agency or other eligible user who uses a contract to purchase a commodity or contractual service. Evaluation Committee/Team is a temporary group of City personnel who are responsible for the evaluation of proposals as part of a Request for Proposals (RFP), Request for Statements of Qualifications (RFSQ) or competitive grant process. Evaluator is a member of the evaluation committee/team Goods are supplies, materials, or equipment. Intent to Award is a document that informs the public and respondents of the City’s decision to award a contract pursuant to a previously issued competitive solicitation. Invitation to Bid (ITB) or Bid means a formal request to prospective Bidders requesting pricing for a specified Good or Service which has been advertised for bid in a newspaper. Invitation to Negotiate (ITN) means a formal request to prospective proposers requesting proposed specifications and pricing of a product and/or service which has been advertised for replies in a newspaper. Issues means points, matters or concerns to be addressed during negotiations. Lead Negotiator is the negotiator responsible for leading and facilitating the formal negotiation discussions and selecting other required negotiation team members. Is often the “driver of change” and seeks alternatives/options. Lowest Responsible Bid means the responsive bid meeting all requirements of the specifications, terms, and conditions of the Invitation to Bid resulting in the lowest cost to the City in a total cost concept or based solely on price, taking into consideration the financial and practical ability of the Bidder to perform the Contract, past per

Published attachments
Addenda and notices
Public questions and answers
  • Will this project require certified payroll ?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm that fixed leads must be used for all pile driving.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm contractor to wet tap into main water line shown on drawings and provide hydrant in addition to the stand pipe system and line.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Is there a construction cost estimate or budget associated with this project?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Should the contractor use nylon washers for mounting the aluminum brackets to the stringers with Stainless steel screws ?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Can concrete piles be driven with a vibratory hammer with a pile clamp ?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Will pre and post Bathymetric surveys with a surveyor stamp be required to bill for dredge quantities ? or can lead line readings be acceptable ?

    Thank you for reaching out. Question received and will be replied via addendum.

  • What are the projected start and completion dates for this project?

    Thank you for reaching out. Question received and will be replied via addendum.

  • What is the anticipated start date of construction for the referenced project? Are there any schedule restrictions due to things like permits or local ordinances?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Will the City and its EOR allow the Contractor and its dock manufacturer to propose a design-build alternate for the specified pile foundations, provided that Contractor and its engineer will provide signed and sealed drawing for the alternate pile design

    Thank you for reaching out. Question received and will be replied via addendum.

  • What is the Engineers Estimate/ City Budget for this solicitation?

    Thank you for reaching out. Question received and will be replied via addendum.

  • CAN YOU PLEASE PROVIDE A PROJECT BUDGET OR ENGINEERS PROBABLE COST OF CONSTRUCTION?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm that the Contractor will be permitted to utilize the area adjacent to the new pier and dock as a staging and laydown area during construction. A significant portion of the work will need to be performed from land, making access to an area adjacent to the pier essential for staging materials, equipment, and construction activities. The availability of this area is critical to the efficient execution of the work. Please confirm that the Contractor will have access to and be permitted to utilize this area for staging and laydown for the duration of construction.

    Thank you for reaching out. Question received and will be replied via addendum.

  • The plans show the fire line being installed within the tree line that shields the venue from the park. Will the contractor be responsible for replacing the trees and bushes that will need to be removed ?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Can the contractor store lumber and piles adjacent to the site in Riverwalk Park ? Contractor can install fencing to keep public safe within the park.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Will any signage be required for the fire lane ? In addition to the yellow cross hatch should we paint " Fire Lane " ?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Will the City and the Engineer of Record accept aluminum-frame floating docks with composite decking as an approved equal to the concrete floating dock system?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Cutting Edge Design & Construction, Inc. (Florida CGC060801) is preparing a bid for ITB-26-26-CW. Our firm did not attend the mandatory pre-bid meeting held on November 16, 2026. Will the City consider a bidder that did not attend the November 16 mandatory pre-bid meeting to be eligible and responsive, or is attendance an absolute condition of bidding? If attendance is an absolute condition, does the City intend to hold a supplemental pre-bid session or provide any other cure mechanism before the December 11, 2026 bid deadline? Thank you.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Upon reviewing the project specifications, we noted the following design criteria for the floating concrete dock modules: Concrete float modules must have concrete cover for protection on all six sides. Floats without concrete bottoms will not be allowed. Minimum concrete deck, bottom, and wall sections shall be as follows: Deck: 2.00 inches Walls: 1.50 inches Bottom: 1.25 inches Based on our review of the available floating concrete dock manufacturers, it is our understanding that Bellingham is the only manufacturer that produces concrete float modules with a solid concrete bottom. Other major floating concrete dock manufacturers utilize a resin or similar protective surface on the bottom of their float modules rather than a solid concrete bottom, providing protection from seawater and marine organisms. As currently written, the specification appears to limit the project to a single floating concrete dock manufacturer. RFI Question: Please confirm whether the City and its EOR will allow floating concrete dock systems utilizing a five-sided concrete float module with a resin/protective surface on the bottom in lieu of the specified 1.25-inch concrete bottom. Allowing this alternative would permit other qualified floating concrete dock manufacturers to compete while still providing a durable protective bottom surface suitable for the marine environment. The alternative dock manufacturers we are referring to are well-established and qualified manufacturers whose floating concre

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm that the City will provide all required State and Federal permits, including USACE and SWFWMD permits. The Contractor will only be responsible for obtaining the required local County and City permits.

    Thank you for reaching out. Question received and will be replied via addendum.

  • What is the anticipated NTP date for the project?

    Thank you for reaching out. Question received and will be replied via addendum.

  • What grade stainless steel is the wire cable railing?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please provide the pre-bid sign-in sheet ASAP. Document can be uploaded into Open.gov with no need for an Addendum.

    Thank you for reaching out. Question received and will be replied via addendum.

  • What is the anticipated start date for this project?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Are there any specialty insurance requirements for this project?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Sheet C-06 shows a proposed aluminum railing at end of the dock. Please provide plan page number showing detail of railing if available.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm that the Webster Creek Mitigation Bank credits required by the SJRWMD permit are the City's responsibility, not the contractor's.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm that existing circuit 1B2-17 has the capacity for the new dock lighting load, and that the City allows tying into it as shown on E2 and E4.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm the testing requirements for the FDC and standpipe (NFPA 14 hydrostatic test pressure and duration?) and for the hydrant connection (flushing and bacteriological testing).

    Thank you for reaching out. Question received and will be replied via addendum.

  • C-18 labels the "Existing Water Main" without size, material, depth or exact location. Please provide this information, and confirm whether the City or the contractor makes the tap, and the applicable tap and permit fees.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Will the City accept an alternate aluminum-framed floating dock system in place of the specified concrete floating dock, provided it meets the design loads, freeboard, pile guide and railing requirements of spec Item 11 and the drawings? If so, should the alternate be submitted as a substitution request before bid, priced as a bid alternate, or submitted after award?

    Thank you for reaching out. Question received and will be replied via addendum.

  • Spec Item 4 requires seismograph monitoring but gives no limits. Please provide the allowable vibration (PPV) thresholds and the structures or locations to be monitored.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm any limits on pre-drill depth or diameter for the concrete and timber piles, given the dense to very dense sand and shell.

    Thank you for reaching out. Question received and will be replied via addendum.

  • S-02 states jetting is not allowed for piles supporting lateral load, but spec Item 11 allows jetting with the Engineer's approval provided the final 5 ft is driven. Please clarify which governs for the concrete spud piles and the timber piles.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm whether the floating turbidity barrier requires navigation lighting or reflective markers, and confirm the required barrier extent at the offload site (Item 8).

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm whether the allowable 1 ft overdredge is included in the pay quantity for Line 8.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Spec Item 8 requires a 20 ft setback from the existing bulkhead on the waterward and landward sides. Please confirm whether barges (unloaded, or carrying spoil containers) may moor inside the 20 ft waterward setback, or whether the setback applies only to equipment operation, truck loading and stockpiling.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Please confirm the allowed working hours and days, including any weekend or holiday restrictions.

    Thank you for reaching out. Question received and will be replied via addendum.

  • No contractor staging, laydown or parking area is shown. Please identify the areas available in Riverwalk Park for material storage (piles, floats, gangway, lumber), equipment and crew parking.

    Thank you for reaching out. Question received and will be replied via addendum.

  • Is this project being funded by Federal or FEMA funds? Please confirm whether any federal requirements apply to this contract, such as Davis-Bacon wage rates, Build America Buy America, or other federal contract provisions.

    Thank you for reaching out. Question received and will be replied via addendum.

Plain text

OpenGov categories

  • 12035 · Docks and Piers, Fixed and Floating (Including Dock Systems, Gangways, Marinas, Wharfs, etc.)
  • 56045 · Dockboards and Ramps, All Types
  • 75033 · Concrete, Repair, Rapid Setting
  • 90638 · General Construction - Architectural
  • 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
  • 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
  • 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
  • 91400 · Construction Services, Trade (New Construction)
  • 91430 · Concrete
  • 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering
  • 92546 · Geotechnical Engineering
  • 95900 · Marine Construction And Related Services; Marine Equipment Maintenance And Repair
  • 95990 · Waterfront Construction Services Including Piers, Docks, Decking, etc. (Includes Maintenance and Repair)
  • 96834 · Dredging Services