DCMR Driveway and Stormwater Drainage Rehabilitation. Work includes stormwater drainage investigation, repair, and upgrade; full removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness); subgrade and base course rehabilitation; replacement of existing stone edging with 150 mm concrete kerbs; entrance apron asphalt works; and full site restoration of landscaping, irrigation, lighting, and utilities. The contractor shall furnish all labor, materials, equipment, and miscellaneous costs required to complete the installation as specified herein.. Please refer to Section B for the detailed Statement of Work.
STATE, DEPARTMENT OF is conducting market research to identify potential sources for parking lots and garages with a set-aside for No Set Aside businesses in WASHINGTON, DC. Responding to this notice helps ensure your company is considered for the eventual solicitation.
Looking for more opportunities?
Browse our full directory of government contracts