State and local · OpenGov
Design Build Services for New Glenn Dale Splash Park
Description
The Maryland-National Capital Park and Planning Commission (M-NCPPC or Commission) is requesting proposals from qualified firms to provide design/build services for the new construction of the Glenn Dale Splash Park, located at 11901 Glenn Dale Blvd., Glenn Dale, Maryland 20769. Design Build Entity's Architect Engineer Basic Service Fees Pre-Design Phase Schematic Design Phase Design & Permitting Phase GMP Submission Construction Document Phase Construction Administration Phase Reimbursable Expenses ( Not to Exceed) Permit Allowance Permit Allowance TOTAL CONSTRUCTION BUDGET IN RFP PERCENTAGE Total Construction Budget Percentage Total Cost Construction in the RFP The percentage proposed in Line Item j. shall be multiplied by the Total Construction Budget identified in the RFP Proposed Percentage (j.) × Total Construction Budget Identified in the RFP Add Alternate Provide the Lump Sum (LS) cost required to achieve LEED Gold Certification rather than LEED Silver Certification. The amount entered shall represent the net cost difference between obtaining LEED Gold and obtaining LEED Silver Net Difference Cost to Achieve LEED Gold Certification in Lieu of LEED Silver Certification Design Build Fee Build Team Pre-Construction Phase Fees Pre-Construction Phase Work up to GMP Acceptance (fees for managing design portion of D/B project) Design Build Fee Team Construction Phase Fees Construction Phase at GMP Acceptance (fees for managing construction portion of the D/B project) General Conditions for Construction Phase - Total of Form F1 (Personnel) General Conditions for Construction Phase- Total of Form F2. ( Non-Personnel) Design/Build Fee General Construction Contigency - Based on 65% CD D/B Fee Construction Allowances Furniture, Fixture, & Equipment (FFE) Audio Visual (AV) and Security Systems Public Art Design/Build Fee Build Team Construction Phase Fees Percentage Total D/B Entity Fees Percentage Proposal Submittal Instructions Deadline Disclaimer It is the responsibility of the bidder to submit electronic bids before the deadline date and time approaches as posted on ProcureNow. Some people are experiencing problems with the Internet, so make sure that all documents are uploaded as soon as possible well in advance of the deadline. The ProcureNow system will close promptly at the deadline date and time…no exceptions are allowed. Project Title Summary Background Contact Information Timeline It is the responsibility of the bidder to submit electronic bids before the deadline date and time approaches as posted on ProcureNow. Some people are experiencing problems with the Internet, so make sure that all documents are uploaded as soon as possible well in advance of the deadline. The ProcureNow system will close promptly at the deadline date and time…no exceptions are allowed. Vendor Questionnaire FORM F- DESIGN BUILD PRICING SHEET Document Uploads
Published attachments
- RFP P47-113Design Build Glenn Dale Splash Park-Final
- Attach 1_General Conditions Design-Build
- Attach 2_Division 1_Glenn Dale Splash
- Attach 3_MAP_Glenn Dale Splash Park
- Attach 4_Glenn Dale Final Concept
- Attach 5_Public Art Program
- Attach 6_Glenn Dale As-Builts
- Attach 7_PARK AND RECREATION DESIGN GUIDELINES (2024)
- Attach 8_MNCPPC 2010 ADA Standards
- Attach 9_ITS MDF Room and AV Standards
- Attach 10_Maryland State Adult changing tables Requirements
- Attach 11_Glenn Dale Splash Park Facility_Conditions_Assessment_2017
- Attach 12_Service_Area_3_Multigenerational Center_2021
- Attach 13_Web Content Accessibility Guidelines
- Attach 14_Sample Design-Build Contract
- Design_Build_Services_for_New_Glenn_Dale_Splash_Park_(Addendum_#3_Revision).pdf
Addenda and notices
Addendum #1 · 1
Addendum No. 01 provides a sign-in sheet for attendees of the pre-proposal meeting held on October 13, 2026.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Addendum No. 03
OpenGov categories
- 90625 · Design Build Services