Electric Arc Furnace removal ,acquisition and installation

Combined Synopsis/SolicitationNo Set AsideActive

Key Takeaways

  • Set-aside for No Set Aside businesses
  • Work to be performed in ROCK ISLAND, IL
  • Industry: All Other Industrial Machinery Manufacturing

Contract Details

Notice ID
W519TC26R028
Opportunity Type
Combined Synopsis/Solicitation
Sub-Agency
DEPT OF THE ARMY
Office
W6QK ACC-RI
Posted Date
Wednesday, April 29, 2026
Response Deadline
Monday, June 1, 2026
PSC Code
4430
Set-Aside
No Set Aside
Place of Performance
ROCK ISLAND, IL, 61299-0000
Status
Active

Description

U.S. Army Contracting Command - Rock Island (ACC-RI) has a requirement to provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. Please review attachments for complete requirement. Note a site visit for this requirement is scheduled for 8 May 2026 at 8am.

Why This Opportunity Matters

The Department of DEFENSE is actively seeking qualified contractors for all other industrial machinery manufacturing with a set-aside for No Set Aside businesses in ROCK ISLAND, IL. This set-aside designation means eligible businesses face reduced competition from larger firms.