FCC Yazoo City - Air Cooled Condensors Replacement

Combined Synopsis/SolicitationActive

Key Takeaways

  • Full and open competition - all businesses eligible to bid
  • Work to be performed in YAZOO CITY, MS
  • Industry: Plumbing, Heating, and Air-Conditioning Contractors

Contract Details

Notice ID
23Z3AJ2
Opportunity Type
Combined Synopsis/Solicitation
Sub-Agency
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Office
FCC YAZOO CITY
Posted Date
Tuesday, June 9, 2026
Response Deadline
Monday, June 22, 2026
PSC Code
4120
Set-Aside
Full & Open Competition
Place of Performance
YAZOO CITY, MS, 39194
Status
Active

Description

The primary objective of this project is to replace the aging and non-functioning geothermal system at the Federal Prison Camp (FPC) in Yazoo City, Mississippi (p. 1). The contractor will install a new system utilizing three air-cooled condensers to service approximately 15,500 square feet of the Camp Core and Education buildings, while capping and abandoning the original geothermal system in place (p. 1). Key Specifications & Requirements Equipment: High-efficiency, sickle-blade AC fan motors (e.g., ZIEHL-ABEGG) operating at 550 RPM, enclosed in 16-gauge galvanized steel casings (p. 1). Electrical & Sound: Systems must run on 460 main power and maintain a maximum sound pressure level of 46 dBA at 10 meters (p. 1). Pressure Testing: High heat transfer tube and fin coils must be factory lea

Why This Opportunity Matters

JUSTICE, DEPARTMENT OF is actively seeking qualified contractors for plumbing, heating, and air-conditioning contractors in YAZOO CITY, MS.