Fort Lee Vehicle Recovery Range construction project

Solicitation8(a) CompetedActive

Key Takeaways

  • Set-aside for 8(a) Competed businesses
  • Work to be performed in NORFOLK, VA
  • Industry: Commercial and Institutional Building Construction

Contract Details

Notice ID
W9123626BA006
Opportunity Type
Solicitation
Sub-Agency
DEPT OF THE ARMY
Office
W2SD ENDIST NORFOLK
Posted Date
Thursday, June 18, 2026
Response Deadline
Tuesday, July 28, 2026
PSC Code
Y1PZ
Set-Aside
8(a) Competed
Place of Performance
NORFOLK, VA, 23510-1096
Status
Active

Description

The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positi

Why This Opportunity Matters

The Department of DEFENSE is actively seeking qualified contractors for commercial and institutional building construction with a set-aside for 8(a) Competed businesses in NORFOLK, VA. This set-aside designation means eligible businesses face reduced competition from larger firms.