The Government anticipates the need to replace the raised lights and signs in relation to the B-52 RADAR Modernization Program as the B-52 aircraft is towed or taxied on the runway as defined in the draft Statement of Work (SOW). Contractor shall be responsible for ensuring the B-52 has access to the runway from Boeing and ensure the lights and signs are restored back to original condition. The B-52 path will be from the Boeing Ramp to taxiway Echo, crossing Taxiway Alpha, and stay on Taxiway Echo to the runway. The runway and taxiway lights and runway signs, as described in the drafted SOW, are included in this contract. After the runway lights/signs are reinstalled, if found inoperable as originally determined, then the contractor shall repair the lights/signs. Contractor shall be respon
The Department of DEFENSE está realizando investigación de mercado para identificar fuentes potenciales para electrical contractors and other wiring installation contractors con reserva para empresas Small Business en JBSA LACKLAND, TX. Responder a este aviso ayuda a asegurar que su empresa sea considerada para la solicitud eventual.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales