This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36 cmp. Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite. Aggregate base shall be 4 depth below asphalt. Asphalt trail shall have 6 width, 3 depth and 2% cross slope (max). Aggregate base, asphalt and concrete testing per FP-24. Resting pads shall be asphalt with 4 width, 6 length, 3 depth
AGRICULTURE, DEPARTMENT OF is actively seeking qualified contractors for all other specialty trade contractors with a set-aside for Small Business businesses in SPARKS, NV. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts