The Pinellas County School District (District) is soliciting sealed electronic bids in response to Layer 1 Network and Telecommunications Infrastructure Upgrade . Bids are due before 4:00 pm on Monday, January 4, 2027 . Bids may be received up to but not later than, the date and time listed above, via the District e-Procurement Portal located at https://procurement.opengov.com/portal/PCSB . The District e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The Pinellas County School District Purchasing Department strongly recommends completing your response well ahead of the deadline. The Pinellas County School District (District) is soliciting competitive proposals from qualified contractors to furnish all labor, materials, equipment, and services necessary for the upgrade and modernization of Layer 1 network and telecommunications infrastructure throughout schools within the District. This includes, but is not limited to, structured cabling, fiber optic backbone systems, horizontal copper cabling, telecommunications distribution frames and all associated pathways, support components and infrastructure materials. The District is seeking bids for Category 2 Internal Connections, specifically for structured cabling installation for 98 school sites, listed in Exhibit A. This is intended to be a multi-year project spanning (at minimum) April 1 st 2027 through June 30 th 2031. Multiple vendors may be awarded this contract and participation in the project. The work will be conducted in two phases: Phase 1 (fiber optic infrastructure) and Phase 2 (horizontal Category 6/6A Ethernet cabling), as described in Section 2.2. This procurement is dependent on E-Rate Category 2 funding, as described in Section 8.6. A Form 470 for this opportunity has been submitted to USAC, and is available on their website. Pinellas County Schools has partnered with OpenGov Procurement which provides government agencies and their suppliers with a comprehensive and easy to use web-based eProcurement system. Registered suppliers receive automatic notification and transmittal of bid solicitations, and there is no charge to register and subscribe to receive PCS solicitation notifications. Please visit https://procurement.opengov.com/portal/pcsb to register and subscribe. Once you have downloaded bid documents from an OpenGov notification you will automatically receive an e-mail notifying you when any addenda are issued or questions posted have been answered. If you obtain our solicitation documents from any other source, we cannot guarantee that you will automatically receive subsequent notifications of addendums. To assure that you are automatically notified, you must visit the above website and download the bid document. The District will not be responsible if you fail to receive any and all addendums if you obtain the original bid document from another source. The district will give consideration to prices established by the State of Florida Department of Management Services, Division of Purchasing through its contracts and negotiated agreement price schedules. The procurement contact for this solicitation is Barbara Molfetta and can be reached at molfettab@pcsb.org . Submit Electronic Responses via the District e-Procurement Portal: https://procurement.opengov.com/portal/PCSB Scope of Work 2.1 General Scope The Contractor shall provide a complete, fully functional, and tested structured cabling system at each designated school facility. The Contractor is responsible for all materials, equipment, and labor — including all incidental items — necessary to deliver a complete system, whether or not every component is individually itemized in this specification. The scope encompasses all work from the Main Distribution Frame (MDF) through every Intermediate Distribution Frame (IDF) and out to each individual communications jack. The work shall be performed in two phases, as described in Section 2.2. Unless specified by the owner, all existing raceway to be reused inclusive of all flex innerduct runs, cabinets and pull boxes, J Hooks, etc. (reuse all existing racks/cabinets). Some inground conduit paths may be damaged or lack available expansion space. Contractor will need to provide cost for repair/installation, see relevant line items in the Pricing Submittal Form. In certain MDF/IDF locations, additional cable management infrastructure may be needed, see relevant line items in the Pricing Submittal Form. All equipment and materials must be new. Used, re-conditioned or refurbished equipment or materials will not be acceptable. 2.2 Project Phasing The project will be conducted in two separate phases. Each phase is described below, and the subsections of this Section 2 identify the phase in which each scope item falls. Phase 1 — Fiber Optic Infrastructure. Phase 1 consists solely of fiber optic cabling and supporting equipment, components, and materials, together with the associated remediation necessary for the installation; meeting best practices and applicable standards. Phase 1 includes: Fiber optic backbone cabling (OS2 single-mode or OM4 multi-mode) as described in Section 2.3. Please note that the vendor will need to provide Cisco compatible LR transceivers in any event that single-mode fiber is specified or requested. Rack-mounted fiber interconnect cabinets, couplers, connectors, and fiber management, and the remediation of MDF and IDF spaces required to install the fiber in accordance with best practices and standards. Associated pathways, innerduct, conduit, pathway remediation, fire stopping, and any grounding and bonding required for the fiber installation. Labeling, testing, and documentation of the fiber optic plant. Phase 2 — Horizontal Ethernet Cabling. Phase 2 consists of horizontal Category 6 or Category 6A Ethernet cabling and supporting equipment, components, and materials, together with associated network closet remediation. Phase 2 includes: Horizontal Category 6 cabling or Category 6A cabling, as described below in Sections 2.5 through 2.9. Communications outlets, patch panels, patch cords, and associated cable pathways. Remediation of MDF and IDF network closets associated with the horizontal cabling, as described in Section 2.6. Labeling, testing, and documentation of the horizontal cabling. Phase Scheduling. Phase 1 will be performed in Years 1 and 2 (FY 2027-28 and FY 2028-29), and Phase 2 will be performed in Years 3 and 4 (FY 2029-30 and FY 2030-31), at each school in the fiscal year designated in Attachment B for the award scenario selected by the District. Phase 2 work at a school shall not begin until Phase 1 at that school has been completed and accepted in writing by the District, unless the District directs otherwise in writing. General Requirements. Except where this RFP states otherwise, the requirements of this RFP (including testing, documentation, labeling, training, and warranty requirements) apply to each phase in accordance with its scope. 2.3 Fiber Optic Backbone Cabling (Phase 1) The Contractor shall furnish and install all inter-building and intra-building fiber optic cabling as follows: Fiber Types: The fiber optic backbone to be installed may be single-mode (OS2) or multi-mode (OM4). Please note that the District may choose to generally standardize on single-mode fiber, rather than using multi-mode fiber for runs of 400 meters or less. Hybrid fiber optic cable (cable containing both single-mode and multi-mode strands) will not be accepted. Multimode OM4 Fiber: Where multimode fiber is installed, provide tight-buffered, indoor/outdoor plenum-rated, multi-strand 50/125 µm OM4 fiber optic cable for runs of 400 meters or less. Cable shall be VCSEL-optimized and shall exceed ANSI/TIA 568.3-E and IEEE 802.3ae specifications. All fiber strands shall be terminated with LC fusion splice-on connectors. Pull strings shall be installed with all fiber for future use. Single Mode Fiber: Where single mode fiber is installed, provide indoor/outdoor plenum OS2 9/125 µm single mode fiber. Single mode fiber shall be installed for all runs exceeding 400 meters. Proposed single-mode product cut sheets must be submitted for review and approval prior to ordering. Cable shall exceed ANSI/TIA 568.3-E and IEEE 802.3ae specifications. All fiber strands shall be terminated with LC fusion splice-on connectors. Pull strings shall be installed with all fiber for future use. Armored Fiber: Where specified by the District (for example, in exposed or high-risk pathways, crawl spaces, or areas subject to physical damage or rodents), OS2 or OM4 fiber optic cable shall be furnished with interlocking aluminum armor, indoor/outdoor plenum-rated where required, and shall otherwise meet all requirements of this section. The armor shall be bonded and grounded at each end in accordance with the NEC and ANSI/TIA-607-D. Armored cable is priced as a per-foot adder to the corresponding per-foot fiber price, plus armor bonding kits, in the Pricing Submittal Form. Star Configuration: All backbone cables shall run in a star configuration from MDF to each IDF. There shall be no intermediate splicing or bridging between backbone segments. Fiber Counts: As indicated on project drawings. Termination: All fiber strands shall be fusion-splice terminated and landed on rack-mounted fiber interconnect cabinets at both ends. The Contractor shall own fusion splicer equipment. The Owner shall be notified at least 48 hours prior to connector installation and may elect to be present. Fiber Pricing: Per-foot fiber pricing in the Pricing Submittal Form includes furnishing and pulling the cable, pull string and labeling. Each terminated strand end shall be priced under the per-strand-end termination line items, which include the LC fusion splice-on connector, fusion, dust cap, labeling, and bi-directional OLTS/OTDR testing. Fusion splice, fan-out kit and splice enclosure line items are for repair or District-directed use only. Removal of Existing Fiber Cabling: Removal and disposal of existing fiber optic cabling being replaced by the new installation, including abandoned cable as required by the National Electrical Code (NEC Article 800 / 770 as applicable), is included in the per-foot fiber pricing. Removal of cabling not associated with a new installation shall be performed only at the District’s direction under the ‘Demolition of Existing Cabling’ line item, is not E-Rate eligible, and shall be invoiced to the District separately as an ineligible cost. Recommended Fiber Manufacturers: Belden FiberExpress OM4: FD4DxxxP9 / Single-mode: FDSDxxxP9 Corning OM4: xxxT8P-31190-29 / Single-mode: xxxE8P-31131-29 Recommended Connector Manufacturers: Belden FX Fusion: OM4 FT4LC900FS01 / Single-mode FTSLC900FS01 Corning FuseLite: OM4 SOC-LC-900-OM4 / Single-mode SOC-LCU-900-SM Recommended Fiber Interconnect Cabinet Manufacturers: Belden: FiberExpress Ultra Cabinets, FX-FMT Series Leviton: SPBC2 Series 2.4 Excavation and Underground Pathways (Phase 1) Where underground cabling is required, the Contractor shall provide all excavation, backfill, and compaction per industry standards. Jack-and-bore methods are preferred beneath concrete slabs, sidewalks, and similar hardscape. Dewatering shall be provided as necessary. Restoration of all disturbed surfaces, including concrete, asphalt, sidewalks, sod, irrigation and landscaping, to pre-construction condition or better is included in the unit pricing for directional boring, trenching and conduit installation. No separate charges will be accepted for surface restoration. 2.5 Horizontal Copper Cabling (Category 6 and Category 6A) (Phase 2) The Contractor shall furnish and install Category 6 or Category 6A horizontal copper cabling, as specified by the District, from each IDF to all communications outlets throughout each facility, as follows: Cable Type: All horizontal cabling shall be Category 6 or Category 6A U/UTP, plenum-rated where required, and riser-rated in non-plenum spaces. Run Length: Maximum horizontal cable run length shall not exceed 90 meters from the IDF to the furthest workstation. Service Loop: Each cable run shall include five feet of slack service loop coiled above the ceiling directly above each communications outlet drop. Termination Sequence: Cables shall be terminated in sequential order (lowest room number first, Station A first, Ports 1–4 in order) on 48-port patch panels at the IDF end, and on Category 6 or Category 6A data jacks (matching the cable category) at the workstation end. Termination Method: All copper station cables shall be terminated using 110-type insulation displacement connectors (IDC) with T568A pin/pair assignment. Drop Pricing: Drop pricing shall be used for every new or replacement horizontal cable run. Component line items apply only to work that does not constitute a complete drop (repairs, moves/adds/changes, re-termination of existing cable) and require prior District approval. Where a drop line item applies, the District will NOT accept component or hourly pricing for that work. Removal of Existing Copper Cabling: Removal and disposal of existing horizontal copper cabling being replaced by a new drop, including abandoned cable as required by the National Electrical Code (NEC Article 800), is included in the drop pricing. Removal of cabling not associated with a new installation shall be performed only at the District’s direction under the ‘Demolition of Existing Cabling’ line item, is not E-Rate eligible, and shall be invoiced to the District separately as an ineligible cost. Recommended Category 6 and Category 6A Cable Manufacturers: Belden: Cat 6 2413; Cat 6A 10GXS13 (plenum) Berk-Tek: Cat 6 LANmark-1000 (10032093); Cat 6A LANmark-XTP 2.6 Distribution Frames — MDF and IDF Build-Out (Phases 1 and 2) The Contractor shall furnish and install complete Main Distribution Frame (MDF) and Intermediate Distribution Frame (IDF) equipment rooms and closets, including the items below (where specific need is determined by the District). In Phase 1, this work is limited to the rack-mounted fiber interconnect cabinets and the remediation of MDF and IDF spaces required to install the fiber backbone in accordance with best practices and standards. All remaining items, and the associated network closet remediation for the horizontal cabling, are Phase 2. 19-inch EIA standard 42U-48U data racks and/or wall-mount enclosures (24, 36 or 48 inches tall). Rack-mounted fiber interconnect cabinets with LC duplex couplers, fiber storage management, and blank adapter panels for unused ports. 48-port Category 6 and Category 6A 110-termination patch panels with rear and horizontal cable management. A minimum 30-inch clear working space shall be maintained in front of and behind all equipment racks. 2.7 Communications Outlets and Data Jack System (Phase 2) The Contractor shall furnish and install all communications outlets as follows: Recessed-mount faceplates with four-port configurations. Single and dual drops shall include a four-port faceplate with blank inserts in unused ports. Category 6 or 6A jacks for all standard data outlets. Jacks shall comply with ANSI/TIA-568.0-E, 568.1-E, 568.2-E, and TIA-606-D with T568A pin/pair assignment and ETL verification. Recommended Jack Manufacturers: Belden: Cat 6 AX101320; Cat 6A AX102282 Leviton: Cat 6 61110-RW6; Cat 6A 6110G-RW6 2.8 Patch Cords (Phase 2) The Contractor shall furnish and deliver patch cords as follows, with all colors confirmed with the Owner/Engineer prior to ordering: Color coding by device type: Data: Blue WAPs: Yellow Voice: Orange – E-RATE INELIGIBLE, INVOICE ACCORDINGLY IP Speakers: Purple – E-RATE INELIGIBLE, INVOICE ACCORDINGLY Cameras: Green – E-RATE INELIGIBLE, INVOICE ACCORDINGLY Fire: Red – E-RATE INELIGIBLE, INVOICE ACCORDINGLY HVAC/BAS: White – E-RATE INELIGIBLE, INVOICE ACCORDINGLY Cat6/Cat6A Patch Cable lengths per Network Closet: Patch Cords: 80% – 1 ft, 10% – 3 ft, 5% – 5 ft, 5% – 7 ft Recommended Patch Cord Manufacturers: Belden: Cat 6 C6011 Series; Cat 6A CA211 Series Leviton: Cat 6 6D460-xxx Series; Cat 6A 6ASP0-xx Series Fiber Patch Cables: LC to LC, some LC to ST. Lengths and types are specified in the Pricing Submittal Form. 2.9 Cable Routing Infrastructure (Phases 1 and 2) The Contractor shall provide complete cable pathway systems, including: J-Hook Systems: J-hooks shall be sized to accommodate all specified cabling plus 50% additional capacity. Spacing shall not exceed 4-foot intervals. J-hooks shall be positioned no closer than 18 inches from sources of electromagnetic interference (fluorescent lighting, etc.). Cable Trays: Sized to accommodate all specified cabling plus 50%. Minimum 18 inches from EMI sources. Conduit: Required between buildings, in open exposed ceiling areas, and within walls. Fire Stop Penetrations: All penetrations through fire-rated or smoke walls shall be properly fire-stopped per UL Standards and ANSI/TIA-569-E. Introduction and Background 1.1 Purpose The Pinellas County School District (“District”) is soliciting competitive proposals from qualified contractors to furnish all labor, materials, equipment, and services necessary for the upgrade and modernization of Layer 1 network and telecommunications infrastructure throughout schools within the District. This includes, but is not limited to, structured cabling, fiber optic backbone systems, horizontal copper cabling, telecommunications distribution frames and all associated pathways, support components and infrastructure materials. The District is seeking bids for Category 2 Internal Connections, specifically for structured cabling installation for 98 school sites, listed in Attachment A Layer 1 Project List of Schools. This is intended to be a multi-year project from contract award through June 30 th 2031, with no purchases before April 1, 2027. Multiple vendors may be awarded this contract and participation in the project. The work will be conducted in two phases: Phase 1 (fiber optic infrastructure) and Phase 2 (horizontal Category 6/6A Ethernet cabling), as described in Section 2.2. This procurement is dependent on E-Rate Category 2 funding, as described in Section 8.6. A Form 470 for this opportunity has been submitted to USAC, and is available on their website. 1.2 Background The District operates a large-scale enterprise network spanning multiple school campuses throughout Pinellas County, Florida. The existing telecommunications infrastructure requires systematic upgrading to support current and future data and multimedia services. The District’s published Structured Cabling Specification (Section 27 10 00, current revision July 7, 2026) governs all technical requirements (unless otherwise stated here within) and shall be incorporated by reference into this RFP and any resulting contract. The intent of this upgrade is to install a fully standards-compliant, 10+ Gigabit Ethernet capable infrastructure using fiber optic backbone cabling (OS2 single-mode and/or OM4 multimode), Category 6 horizontal copper cabling, and/or Category 6A cabling — all backed by a 25-year manufacturer performance warranty. 1.3 Project Objectives The District’s primary objectives for this project are as follows: Replace and upgrade aging Layer 1 infrastructure across District school facilities Ensure compliance with current ANSI/TIA and IEEE standards Support 10 Gigabit fiber (IEEE 802.3ae) and up to 100 Gigabit fiber (IEEE 802.3ba) for single-mode and shorter multi-mode runs, 10 Gigabit Ethernet over copper (IEEE 802.3an) and/or 1 Gigabit Ethernet over copper (IEEE 802.3ab) Provide a minimum 25-year certi

Published attachments
Addenda and notices
  • Official Notice #1: RSVP for Mandatory Walk-Throughs · 1

    Please contact Brian Doughty with a list of attendees for the mandatory walk-throughts, email doughtyb@pcsb.org .

  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum. This addendum describes changes to RFP 26-BM-045 concerning the scheduling of the two project phases, Attachment B, per-school quotes and project milestones, bonding of phased work, the performance of work without interrupting network service, and the deadline for submitting questions. Each change is explained below together with the RFP sections it affects. Attachment F, Bid Security Instructions 2026 has also been added for clarification. The requirements stated in this addendum amend the RFP. Where any provision of the RFP or its attachments conflicts with this addendum, this addendum governs. This addendum forms part of the solicitation. Proposers shall acknowledge receipt of this addendum as instructed in the RFP. 1. Background and Summary of Changes Section 2.2 of the RFP establishes that the project will be conducted in two separate phases: Phase 1, fiber optic infrastructure, and Phase 2, horizontal Category 6 or Category 6A Ethernet cabling. The bonding provisions under Proposal and Performance Security likewise treat each phase as a distinct stage of the project. As originally issued, however, Attachment B assigned each school a single fiscal year without distinguishing between the two phases, which could be read to mean that all work at a school would be performed in one year. Since the RFP was issued, proposers have also asked how bonds will be calculated and how the work can be completed without disrupting network service during the school day. This addendum resolves those points. In summary, it: schedules Phase 1 fiber work in Years 1 and 2 and Phase 2 horizontal cabling in Years 3 and 4, and replaces Attachment B to show both phases for every school (Sections 2 and 3 below); aligns the per-school quote process and project milestones with the phase schedule (Section 4); restates the bonding requirements so that bonds are provided by Phase and fiscal year (Section 5); sets requirements for assessing existing pathways, maintaining network service during instructional hours, planning cutovers and restoring damaged in-service cabling (Section 6); and extends the deadline for submitting questions to Monday, December 7, 2026, at 12:00 PM (Section 7). The scope of work, the list of 98 schools, the award scenarios, the geographic school lists, the Pricing Submittal Form (Attachment C) and the proposal due date are not changed by this addendum. 2. Project Phasing Sched

  • Official Notice #2: Dunedin HS Walkthrough Parking · 2

    Hi All, Thank you for taking the time to attend today's walkthroughs. For tomorrow morning, please make a point to use the parking lot on the south side of campus. Thanks, and see you tomorrow.

Public questions and answers
  • Will the District accept a proposal supported by a signed commitment from an appropriately licensed Florida qualifying agent to qualify the proposing company, with all required licensing approvals completed before contract execution?

    All required licensing approvals need to be completed at the time of the proposal submitalls deadline.

  • Would the District allow a proposer to meet the Section 4.1 requirements (Florida Low Voltage License, RCDD, manufacturer installer certification, and distributor letter) through a disclosed subcontractor who holds them and performs the related scope, rather than the prime holding them directly?

    Yes, so long as the subcontractor meets the Section 4.1 requirements.

  • Could the District please confirm whether a prime contractor holding a valid Florida General Contractor License may qualify for this project if all low voltage work is performed by a properly licensed Florida subcontractor? Would this arrangement satisfy the RFP's licensing requirements?

    Yes, so long as the subcontractor meets the Section 4.1 requirements.

  • To supplement the existing Section 4.1 question regarding subcontractor-held credentials: May a prime proposer satisfy the following requirements through a disclosed subcontractor that will perform the associated technical scope? 1. Three years continuously in business as a telecommunications systems installer. 2. Three qualifying completed Florida structured-cabling projects within the past five years, including the required educational-facility project. 3. A proposed superintendent who supervised the required comparable projects while employed by that subcontractor rather than by the prime. Or must the prime proposer independently meet each of these requirements? If subcontractor experience is acceptable, please identify the supporting documentation required.

    Yes, that's acceptable. The documentation required is identified in Section 4.1: Licensure: The Contractor shall possess, at minimum, a valid State of Florida Low Voltage License. RCDD: The Contractor shall have a BICSI Registered Communications Distribution Designer (RCDD) on staff. A valid copy of the RCDD certificate shall be submitted with the proposal. Manufacturer Certification: The Contractor shall be a Belden Partner Alliance (PA) contractor, a Leviton Network Solutions Certified Installer, or a certified installer for the approved equivalent manufacturer proposed under Section 3.3, authorized to offer 25-year extended warranties. Valid copies of the manufacturer certification and authorized distributor letter must be submitted with the proposal. Key Personnel: The Contractor shall commit at least one qualified foreman and two journey-level installers or technicians to the project. The proposed Superintendent shall have directly supervised at least two projects of similar scope under the employment of the proposing Contractor. Subcontractors and Partners: The bidder shall identify in its proposal every subcontractor, partner or other third party it intends to use to perform any part of the work, including for each: company name, address, scope of work to be performed, approximate percentage of the work, applicable licenses, and manufacturer installer certifications. All requirements of this RFP and the resulting contract apply equally to subcontractors and partners, i

  • I am getting the following error code when accessing the links below: "This XML file does not appear to have any style information associated with it." - Customer Reference Form - Vendor Contact Information - Resume Submittal Form - Bidders Statement of Principal - Sworn Statement Under Florida Statues - Drug Free Workplace - Debarment Form AD-1048 None of the forms are visible.

    If you are trying to access the documents outside of OpenGov the links will not work. Once you are in OpenGov, click the project in the Procurement Portal to open it. Then click on Draft Response, this will open the Project Information where you can then review the Project Documents. The forms you are referencing are listed in the Proposal section of the bid.

  • Could the District please clarify the Contractor's responsibilities and liability under the 25-year warranty, particularly after the two-year workmanship warranty expires? Is the Contractor responsible only for coordinating manufacturer warranty claims, or would the Contractor also be financially responsible for replacement materials, labor, testing, and other associated repair costs throughout the full 25-year period?

    The 25-year System Performance Warranty is the manufacturer's extended warranty, issued through the Belden Partner Alliance, the Leviton Network Solutions Certified Installer program, or the equivalent program of an approved alternative manufacturer (Sections 3.3 and 6.6). It is registered to the District. The Contractor's own financial warranty obligation is the two-year workmanship warranty. During the two-year workmanship warranty, the Contractor is responsible, at no cost to the District, for correcting any defect in workmanship, including the labor, materials, testing and documentation the correction requires. Product defects, at any time during the 25-year term, are remedied under the manufacturer's warranty in accordance with that program's terms. After the workmanship warranty expires, the Contractor is not financially responsible for repair costs. For the rest of the 25-year term, the Contractor's role is to serve as the District's point of contact for manufacturer warranty claims: respond within five (5) business days, diagnose the reported issue, submit and administer the claim with the manufacturer, and perform any remedy the manufacturer authorizes as its certified installer, with the cost of covered remedies borne as provided in the manufacturer's warranty program. Costs not covered by the manufacturer's warranty are the District's responsibility, and any such work by the Contractor will be performed only at the District's request under a separate quote or purch

  • Could you please confirm whether the District anticipates a preferred construction sequence or specific installation windows for the schools scheduled in FY 2027-28, including any restrictions on performing work during the regular school year?

    The District has not established a preferred construction sequence or specific installation windows for the schools identified in FY 2027-28 at this time. The awarded vendor will be expected to coordinate scheduling with the District and individual school sites to minimize disruption to educational operations. Work may be performed during the regular school year; however, certain activities may be restricted or required to occur outside of instructional hours, during school breaks, or at other District-approved times. Additional scheduling requirements will be communicated during project planning and implementation.

  • Could you please confirm whether prevailing wage requirements apply to this project? If so, could you provide the applicable wage determination and required labor classifications?

    The District refers to Davis-Bacon wage determination or required labor classifications for all projects in our General Terms and Conditions. Contractors are responsible for complying with all applicable federal, state, and local labor/wage and licensing requirements.

  • Could you please confirm whether a bid bond or any other proposal-stage financial security is required? The RFP specifies Performance and Payment Bonds for each phase but does not expressly identify a bid bond requirement.

    Yes, a bid bond is required. Added Attachment F Bid Security Instructions for more information.

  • Regarding the 100% Performance and Payment Bonds, could you please clarify whether the required bonds will be calculated against the entire awarded Phase 1/Phase 2 value for each vendor or separately for individual schools or work authorizations?

    The Contractor shall provide separate Performance and Payment Bonds for each distinct Phase of the Project as defined in the Contract Documents. Phase 1 Execution: Prior to the commencement of any work on Phase 1, the Contractor shall deliver Performance and Payment Bonds in an amount equal to 100% of the total of the Phase 1 quotes approved by the District for that fiscal year. A separate bond shall be delivered before Phase 1 work begins in each of Year 1 (FY 2027-28) and Year 2 (FY 2028-29). Phase 2 Execution: Before the District issues a Notice to Proceed for Phase 2 work in each of Year 3 (FY 2029-30) and Year 4 (FY 2030-31), the Contractor shall deliver a separate Performance and Payment Bond equal to 100% of the total of the Phase 2 quotes approved by the District for that fiscal year."

  • The Proposal section requires a Certificate of Insurance upload, while Attachment E states that insurance coverage must be obtained within 10 working days after award. Could you please confirm whether a current certificate is required with the proposal or whether full compliance may be demonstrated after award?

    Current Certificate of Insurance is recommended to be uploaded at the time of bid submittal. If not available, then it must provided as specified on Attachment E.

  • Section 6.2 specifies that Year 1 quotations are due within 30 business days of School Board approval, while Attachment B refers to 30 days after award. Could you please confirm which timeframe governs?

    Quotations are due within 30 calendar days of Board approval of award.

  • The RFP estimates a total project value of approximately $20 million and references approximately 85% E-Rate funding (approximately $16 million). Could you please confirm the anticipated funding amount and applicable E-Rate discount percentage?

    These are estimated project values. Anticipated applicable funding will be determined via E-Rate approval process.

  • Could you please confirm whether Davis-Bacon prevailing wage requirements are mandatory for RFP 26-BM-045, given that the project is funded through the E-Rate program? If so, could you please confirm whether Wage Determination FL20260222 (Building Construction, Pinellas County, Florida) is the correct wage determination to use for pricing? Additionally, could you please confirm whether this determination applies to both fiber optic and structured cabling installation, as well as underground construction activities, or whether different wage determinations and labor classifications are required? Thank you very much for your clarification!

    The District refers to Davis-Bacon wage determination or required labor classifications for all projects in our General Terms and Conditions. Contractors are responsible for complying with all applicable federal, state, and local labor/wage and licensing requirements. USAC and the FCC do not impose a federal prevailing wage requirement on E-Rate funded projects. However, state or local prevailing wage laws still apply whenever your project triggers them. Universal Service Fund exemption. E-Rate is funded through the federal Universal Service Fund rather than direct federal appropriations, and its authorizing statute (the Telecommunications Act of 1996) does not invoke the federal Davis-Bacon Act. Even without a USAC mandate, E-Rate rules strictly require applicants to follow all state and local procurement laws.

Plain text

OpenGov categories

  • 20464 · Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Firewall Devices, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc.
  • 20564 · Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Firewall Devices, Hubs, Line Drivers, MSAUs, Routers, Transceivers, etc., Environmentally Certified Products
  • 20623 · Communication Processors and Protocol Converters: Front-End Processor, Network Interface Module, Protocol Interchange, Switching Controls, etc.
  • 20656 · Imaging Systems, Mini and Main Frame Computer (Incl. Digital Imaging Network and Technology)
  • 20827 · Communications: Networking, Linking, etc. (Includes Clustering Software)
  • 20928 · Communications: Networking, Linking, etc.
  • 28029 · Communications/Telecommunications Cable and Wire
  • 72559 · Telecommunication Parts and Accessories (Not Otherwise Classified) (EFFECTIVE 3-1-07 THIS CLASS-ITEM INACTIVATED FOR NEW USE, REFER TO 838-85))
  • 83833 · Communications: Networking, Linking, Fiber Modems, Power Over Ethernet, Wireless
  • 83883 · Telecommunication (Internet Protocol) Network Monitoring, Surveillance, Intrusion Detection Systems and Networking Products
  • 92037 · Networking Services (Including Installation, Security, and Maintenance)
  • 92066 · System/Network/Database Administration Services
  • 92076 · Testing of Systems Infrastructure, Components or Software, IT Services