Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Maintenance Facility Painting Project

Description

The Greater Dayton Regional Transit Authority (RTA) is soliciting Bids for Maintenance Facility Painting Project . The successful bidder shall provide all labor, supervision, materials, equipment, tools, transportation, permits, and incidentals necessary to prepare and paint designated RTA facilities and structures. SCOPE OF WORK Scope of Work 1.0 PROJECT INFORMATION A. Provide all labor, supervision, materials, equipment, tools, transportation, permits, and incidentals necessary to prepare and paint designated RTA facilities and structures. The Work shall improve facility appearance, protect surfaces from deterioration, and extend the service life of Authority assets. B. Related Documents 1 . Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections per RTA Requirements, apply to this Section. C. Summary 1. Work Includes: a. Interior and exterior painting. b. Surface preparation. c. Protective coatings. d. Utility pipe identification painting. e. Protection of existing facilities and equipment. f. Cleanup and closeout requirements. g. Coordination with active transit operations. 2. Project Locations a. 600 Longworth Street, Dayton, Ohio 45402 b. 601 Longworth Street, Dayton, Ohio 45402 c. 901 Ludlow Street, Dayton, Ohio 45402 Refer to contract drawings for areas included in the Work. 3. Field Verification a. Contractor shall verify all dimensions, quantities, and existing conditions. Measurements shown on drawings are for reference only. It shall be the responsibility of the Contractor to field verify all measurements and conditions prior to bidding. b. Each facility shall be made available for inspection during the pre-bid walkthrough and thereafter by appointment through the RTA Project Manager. c. Attendance at the pre-bid walkthrough is strongly encouraged. D. Project Manager Julie Hoffman Director of Capital Management Greater Dayton Regional Transit Authority Phone: (937) 425-8362 Email: jhoffman@greaterdaytonrta.org E. Contractor Qualifications 1 . Contractor shall have a minimum of five (5) years of documented experience performing commercial and industrial painting and coating work of similar size, complexity, and operational constraints. 2 . RTA prefers the Contractor to have successfully completed a minimum of five (5) comparable projects within the last five (5) years involving occupied commercial, industrial, transportation, maintenance, or municipal facilities. Project Reference Sheet provided in Bid Requirements under requirement 24. All comparable projects must be uploaded in this section accordingly and include the following: 3 . Contractor shall provide project references including: a. Project name and location. b. Owner contact information. c. Contract value. d. Description of work performed. e. Date of completion. 4 . Personnel performing coating work shall be trained and experienced in industrial surface preparation and application of commercial coating systems. 2.0 PAYMENT PROCEDURES, INFORMATIONAL SUBMITTALS, RFIs, AND PROJECT MEETINGS A. Section includes administrative and procedural requirements for: 1 . Preparation and submission of the Schedule of Values. 2 . Applications for Payment. 3 . Informational Submittals. 4 . Requests for Information (RFIs). 5 . Project Meetings. B. Related Requirements 1 . Section 012600 "Contract Modification Procedures" for administrative procedures governing changes to the Contract. 2 . Section 017700 "Closeout Procedures" for administrative requirements related to Substantial Completion and Final Payment. C. Definitions 1 . Schedule of Values (SOV): A statement prepared by the Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Applications for Payment. 2 . Request for Information (RFI): A written request submitted by the Contractor seeking clarification, interpretation, or additional information regarding the Contract Documents. D. Schedule Of Values 1 . Coordinate preparation of the Schedule of Values with the Contractor's Construction Schedule. 2 . Coordinate Schedule of Values line items with activities identified in the Construction Schedule. 3 . Submit the Schedule of Values to the RTA Project Manager no later than seven (7) days prior to submission of the initial Application for Payment. 4 . Where the Work is phased, provide separate Schedule of Values breakdowns for each phase of the Work. 5 . Format and Content a. Use the following list as a guide for establishing Schedule of Values line items. i. Interior Areas 1. Mechanical Rooms 2. Maintenance Bays 3. Vehicle Storage Areas 4. Shop Ceilings 5. Structural Steel 6. Storage Rooms 7. Utility and Industrial Components 8. Exposed Piping ii. Exterior Areas 1. Bollards 2. Exterior Doors and Frames 3. Exterior Louvers b. Provide at least one line item for each applicable Specification Section. c. Arrange the Schedule of Values in a format consistent with AIA Document G703 or an approved equivalent. d. Include the following information for each line item: i. Related Specification Section or Division. ii. Description of Work. iii. Applicable Change Order Numbers. iv. Dollar Value of Work. 6 . Provide separate identification of: a. Labor b. Materials c. Equipment 7 . Provide a breakdown of the Contract Sum in sufficient detail to facilitate review of Applications for Payment and progress reports. 8. Include separate line items for materials or equipment purchased and stored but not yet installed. a. Differentiate between materials stored on-site and materials stored off-site. 9 . Include all applicable overhead and profit costs proportionately distributed throughout the Schedule of Values. 10 . Revise the Schedule of Values whenever Contract Modifications, Change Orders, or Construction Change Directives alter the Contract Sum. E. Applications For Payment 1 . Applications for Payment following the initial Application shall be consistent with previously approved applications and payments. 2 . Submit Applications for Payment monthly unless otherwise approved by RTA. a. Payment Application Schedule i. The payment period shall extend from the first day through the last day of each month. ii. First submit a “Pencil Copy” to the Project Manager for review before (5) Contract Terms 1. Contract Pricing This is a fixed price contract. All prices offered and accepted are firm for the duration of the contract. Contractors may not change or negotiate contract prices. Except as provided in this contract, no special fees or expenses shall be charged directly to the RTA. 2. Contract Duration The duration or term of this contract shall be for until final receipt after project completion. RTA reserves the right to award this contract to one or more contractors. The Greater Dayton Regional Transit Authority may extend the term of this contract by written notice to the Contractor within 30 days, provided that the RTA shall give the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the RTA to an extension. 3. Quantity and Delivery Requirements There is no set quantity nor delivery schedule for this contract. Goods and/or services shall be provided as required by RTA. Awarded vendors responsible for meeting all requirements for the awarded items over the contract period. No guarantee is made or implied as to the minimum quantities that may be ordered for the duration of the contract. Letter to Bidders RELEASE DATE: Friday, October 16, 2026 DEAR PROSPECTIVE BIDDER: Re: Construction Initiation for Bid (CIFB) Maintenance Facility Painting Project CIFB No. GD 26-53 The Greater Dayton Regional Transit Authority (RTA) is soliciting bids for Maintenance Facility Painting Project . Your firm is invited to submit a bid. A pre-bid conference has been scheduled for Tuesday, November 3, 2026 at 9:00 am at 901 Ludlow Street, Dayton, Ohio 45402, Training Conference Room . Please make arrangements to attend. You may email clarification questions to the undersigned prior to the pre-bid conference. Public Bid Opening: Greater Dayton RTA will be hosting a public bid opening for this project at 4 S Main Street., Dayton, OH 45402. Bids will be opened on Tuesday, December 1, 2026 at 11:00 am . Attendance is not required, but if you plan on attending, please arrive at least ten minutes prior to the time of the bid opening. Bids are required to be submitted via OpenGov and paper or emailed bids will not be accepted. All bids and related documents shall be subject to a financial assistance contract between the RTA and the United States Department of Transportation under the Urban Mass Transportation Administration Act of 1964, as amended, terms and conditions established under the Act will apply. All bidders will be required to certify they are not on the U.S. Comptroller General's Consolidated list of ineligible contractors. Manufacturers appearing on said list will be considered ineligible. In accordance with the drawings and specifications on file at the Greater Dayton Regional Transit Authority (RTA). Pursuant to Section 153.54 et seq. of the Ohio Revised Code, the bidder shall submit a Bid Guaranty in the form of either: A bond for the full amount of the bid conditioned that if the bid is accepted, the bidder after the awarding or the recommendation for awarding the contract, will enter into a proper contract based upon the bid; or A certified check, cashier's check, or letter of credit pursuant to Chapter 1305, Ohio Revised Code, in the amount of 10 percent of the base bid amount. If a 10% GUARANTY is submitted, provided that the bid is accepted, the bidder will, after the awarding or recommendation for awarding the contract, enter into a proper contract and indemnify the RTA against all damages suffered by failure to perform the contract by supplying a performance bond in accordance with Section 153.54(2) et. seq. of the Ohio Revised Code for the full amount of the bid. RTA hereby notifies all bidders that, in regard to any contract entered into pursuant to this procurement, advertisement or solicitation, disadvantaged business enterprises will be afforded full opportunity to submit bids in response and will not be subjected to discrimination on the basis of race, color, sex or national origin in consideration for an award. DBE Participation: It is the policy of the Department of Transportation (DOT) that DBEs, as defined in 49 CFR, parts 23 and 26, shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with federal funds under this Agreement. The DBE goal for this procurement is 0 %, RTA welcomes DBE participation. Please Note: This procurement package and any addenda are available on OpenGov, https://procurement.opengov.com/portal/greaterdaytonrta . In order to ensure that you receive all updates and addenda, please be sure to follow this project on OpenGov. Should you have any questions or comments concerning the procurement, please submit through the Q&A Section of the posting on OpenGov prior to the due date and time for questions. The award for this procurement is based on the lowest responsive and responsible bidder as determined by Greater Dayton RTA. Should you have any questions or comments concerning the procurement, please submit through the Q&A Section of the posting on OpenGov prior to the due date and time for Questions/Inquiries. Sincerely, Michelle Collier Senior Purchasing Agent Instructions to Bidders Greater Dayton RTA Background History RTA is an independent political subdivision of the State of Ohio organized pursuant to Ohio Revised Code Section 306.30 through 306.71, inclusive, as amended. The RTA was created on September 6, 1971, pursuant to the Revised Code, by ordinances of the Councils of the City of Dayton and the City of Oakwood. After completing the purchase of the assets of City Transit, the major privately owned public transportation system in the area, the RTA became operational on November 5, 1972. In September 1980, after the approval in the preceding April by the voters of the County of a one-half percent sales and use tax of unlimited duration for all purposes of the RTA, the boundaries of the RTA were extended to be co extensive with the boundaries of Montgomery County and parts of Greene County. Governing Body All power and authority of the RTA is vested in and exercised by its nine (9) member Board of Trustees. Bid Submission Instructions The Greater Dayton Regional Transit Authority, hereinafter called "RTA", requests bids for Maintenance Facility Painting Project , hereinafter called "above-named project" or by the specific project name, under the following requirements and conditions, which shall be considered an essential part of the contract documents. 1. Submission and Modification Submissions are due electronically by 11:00 am , Dayton (Eastern) time on Tuesday, December 1, 2026 , through OpenGov. Any submission received after the exact date and time specified will not be considered. Submissions may be modified online through OpenGov prior to the due date and time by unsubmitting a bid or proposal and making modifications and then re-submitting. In addition, any costs incurred while preparing a bid or proposal submission, including site visits, will not be reimbursed by RTA. If Bonding requirements are being met via a certified check made out to "Greater Dayton Regional Transit Authority", please mail the certified check to 4 S Main Street, Dayton, OH 45402. 2. Requests for Clarification All requests for clarifications or changes must be submitted through the Q&A Section of the project on OpenGov prior to the stated due time and date. Any new or relevant information given to any one contractor will be furnished to all contractors as addenda to this procurement. 3. Administration of Sealed Bids Sealed bids shall be submitted through the appropriate project in the official Greater Dayton RTA OpenGov site prior to the advertised due date and time. At which time the bids will be publicly opened at 4 S Main St., Dayton, OH 45402 in the 8th floor conference room. Any bid received after the time referred to will not be considered. Any bid received and opened may not be withdrawn by the bidder for sixty (60) days from the date on which the bids were opened. Because bids and offers can at times be ambiguous, the RTA reserves the right to request additional information before making an award. The RTA also reserves the right to seek clarification from any bidder or offeror about any statement in its bid or proposal that the RTA finds ambiguous. The RTA reserves the right, as the interests of the RTA may require, to postpone, accept or reject all bids and to waive defects or irregularities in bids received and to award a contract(s) in the best interest of the RTA. In determining the successful bidder, consideration will be given to the price, the experience of the bidder, responsibility of the bidder including financial responsibility, responsiveness to these specifications, and the bidder's record as an equal opportunity employer. All bids submitted are subject to instructions and general conditions, and any special conditions and specifications contained herein, all of which are made a part of this bid by reference and constitute the contract documents and shall become a part of any agreement and/or purchase order between the RTA and the successful bidder. 4. Contract Award Contract awards are based on the lowest responsive and responsible bidder as determined by the Greater Dayton Regional Transit Authority (RTA). The RTA reserves the right, as the interests of the RTA may require, to postpone, accept or reject all bids and to waive defects or irregularities in the bids received. In awarding a contract(s), the RTA reserves the right to consider all elements entering the determination of the responsibility of the bidder. Any bid which is incomplete, conditional, obscure, or which contains additions not called for or irregularities of any kind, may be cause for rejection of the bid. Contract(s) for the purchase of goods and/or services will be awarded within ninety (90) calendar days from the date upon which bids were opened to the lowest bidder the RTA deems responsive and responsible. The successful bidder will be required to execute the attached contract within five (5) calendar days after notification of award. In the event a single bid is received, the RTA will conduct a price and/or cost analysis of the bid. Price analysis is the process of examining and evaluating a price submitted without examining in detail the separate cost elements and the profit included in the cost bid. It should be recognized that a price analysis through comparison to other similar procurements must be based on an established or competitive price of the elements used in the comparison. The comparison must be made to a purchase of similar quantities and involving similar specifications. Where a difference exists, a detailed analysis must be made of this difference and costs associated thereto. RTA has the right to enter into a negotiated procurement should only a single bid be received. Where it is impossible to obtain a valid price analysis, it may be necessary for the RTA to conduct a cost analysis of the bid price. 5. Funding The proposed contract shall be funded in part from the Federal Transit Administration (FTA) and the Ohio Department of Transportation (ODOT). Each vendor shall examine all contract documents noting particularly all requirements, which will affect the contractor's work. 6. Specified Material and "Approved Equals" Contractors shall furnish with their submission, as an integral part thereof, complete descriptions and specifications of the product they propose to furnish. When the descriptions and specifications of the product meet the description and specifications provided in the solicitation document, no additional submission is required. Where brand names or specific items or processes are used in the specifications, consider the term "or approved equal" to follow. However, a request for approval for any proposed substitution as an equal must be submitted in writing. For all items listed and which are described or defined by dimensions or another measure of physical characteristics or performance, it is understood that such information indicates the character of the required items and so strict interpretations with resp Terms & Conditions The Greater Dayton RTA's General Terms and Conditions and Construction Terms and Conditions are attached to this solicitation as Attachments B and C respectively. FTA Required Clauses - Construction No Federal Government Obligation to Third Parties The RTA and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation of this Contract, absent the express written consent by the Federal Government, the Federal Government is not a party to this Contract and shall not be subject to any obligations or liabilities to the RTA, Contractor or any other party (whether or not a party to that Contract) pertaining to any matter resulting from the Contract. Contractor shall include the above clause in each subcontract financed in whole or in part with Federal assistance provided by the FTA. It is further agreed that the clause shall not be modified, except to identify the subcontractor who will be subject to its provisions. Incorporation of FTA Terms The preceding provisions include, in part, certain Standard Terms and Conditions required by the U.S. Department of Transportation (DOT), whether or not expressly set forth in the preceding contract provisions. All contractual provisions required by DOT, as set forth in FTA Circular 4220.1F, and are hereby incorporated by reference. Anything to the con

Published attachments
Addenda and notices
  • Addendum #1 · 1

    A pre-bid meeting and site visits were held today @ 9:00 am at 901 Ludlow Street, Dayton, Ohio 45402. The following were in attendance: Michelle Collier - RTA Julie Hoffman - RTA Mike Chaney - RTA Shane Rhodehand - True United Contractors Ryan Midlam - True United Contractors Jimmy Kellar - Niche Painting Cody Ellis - Ohio Valley Painting George Gialousis - A1 Industrial Painting Brian Denny - Fresh Coat Paint AJ Davidson - Fresh Coat Paint Patrick Winchester - Fresh Coat Paint Brad McHargue - CertaPro Painters Braden Clark - CertaPro Painters Jacob Banks - CertaPro Painters John Waiter - True United Contractors Khalid Joshua - KRA Design Questions and Answers that were a result of the pre-bid meeting will be posted separately below. Thank you to all who attended.

  • Addendum #2 · 2

    Please note all questions raised during the pre-bid meeting and walk-through have been entered and answered in the Questions & Answers section of the solicitation for all bidders to review.

  • Addendum #3 · 3

    Please note that a section has been added to the bid form for the Underground Parking Garage in the 600 Longworth location. Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #4 · 4

    This addendum shows all questions that have been asked and each of the corresponding answers.

  • Addendum #5 · 5

    Please see the attached drawing showing an additional area to be included in the 901 Ludlow Street location. You can also find this drawing in the attachment section of the solicitation.

Public questions and answers
  • 1. Prime Contractor Experience Requirements The solicitation requires a minimum of five years of documented commercial and industrial painting experience. Would RTA consider a newer general contracting company as the prime bidder if the painting work is performed by an established subcontractor with more than five years of relevant experience and comparable project references? 2. Subcontracting Requirements Does RTA permit the prime contractor to subcontract the majority or entirety of the painting and coating work to a qualified industrial painting company while retaining responsibility for project management, contract administration, compliance, and overall performance? If permitted, must the proposed subcontractor be identified and approved before bid submission, or can approval occur after contract award? 3. Project References If subcontracting is permitted, may the prime contractor submit the painting subcontractor's completed project references to satisfy the experience and project-reference requirements? 4. Bonding Requirements Would RTA accept bid and performance bonds issued in the prime contractor's name with the support of an established painting subcontractor? Are there any additional bonding or financial qualification requirements for newly established businesses? 5. Project Schedule Does RTA have an anticipated project start date, required completion date, or estimated duration for the painting work? Will the work be completed in phases to accommodate ongoing tr

    1. Prime Contractor Experience Requirements The solicitation requires the Contractor to have a minimum of five (5) years of documented experience performing commercial and industrial painting and coating work of similar size, complexity, and operational constraints, and to have successfully completed at least five (5) comparable projects within the last five (5) years. These requirements apply to the prime contractor. While subcontractor qualifications may be submitted as part of the project team qualifications, the prime contractor must independently satisfy the minimum qualification requirements established in the solicitation. 2. Subcontracting Requirements The prime contractor may utilize subcontractors to perform portions of the work, including painting and coating activities. However, the prime contractor shall remain fully responsible for project management, contract administration, scheduling, quality control, safety, regulatory compliance, and overall contract performance. The successful contractor will be required to submit a list of subcontractors. If you are planning to include their relevant experience as a way to meet the team's experience, you should name them in your project documents. Any subcontractors utilized on the project are subject to RTA review and approval, per the terms and conditions of the RTA Contract documents. 3. Project References Project references submitted to satisfy the minimum qualification requirements should be those of the prime contra

  • The link for Certificate of good standing appears to be in error https://ohio.gov/business/resources/certificates-of-good-standing You recieve a 404 error code can this be corrected please

    All forms must be downloaded while in OpenGov. You cannot export the package and access the forms this way. It must be in OpenGov.

  • Is the a specific Bid Security Form required from the bonding agent?

    No, there is not a formal Bid Security FORM.

  • 1. Are any of the mezzanines to be painted? If so, can you identify them on a drawing? 2. Can all the duct work be painted? It will be easier to paint all the duct work than to protect the duct that has not been painted already. 3. Are there janitors closets/ slop sinks available to clean equipment? ( Paint brushes, rollers, sprayers, paint trays, etc.) 4. Are all the sprinkler pipes and fire alarm conduits to be painted red? During the walk it was noticed that some are red and some had been painted the ceiling color. 5. Is there somewhere to dispose of waste water from cleaning the areas to be painted as long as all the cleaning solutions are environmental friendly? 6. Are the exterior sides of doors and frames to be painted? 7. Are the exterior bollards included in this project? 8. Do the offices and break room in 601 Longworth get painted? The drawings do not have these areas shaded but it was stated at the walk that these were included. 9. During the walk, some areas of the metal deck shows evidence of roof leaks. Are there any current leaks in the roofs that may need to be addressed before painting? 10. Per the paint manufacturer, the galvanized drain pipes needs to have all previous alkyd coating removed then painted with acrylic. Is this the intention for this project? 11. Can the air handlers be turned off in areas while painting to prevent propagation of overspray? 12. In the wash bays, it is recommended by the paint manufacturer to use epoxy on the walls and decking

    1. Mezzanines in 600 Longworth Mezzanine structures above the inventory department are not included, as inventory is excluded; they are located in the center of the 600 facility. All other mezzanines are already highlighted in green on our current drawing and should be included. 2. Ductwork RTA would be willing to consider painting all ductwork at the contractor's convenience after award, but no HVAC machine equipment should be painted. Bidders have been told to match the existing paint layout and paint items that are currently painted. 3. Janitor’s closets and equipment cleaning RTA will identify any approved janitor’s closet, slop sink, or equipment-cleaning location during the preconstruction meeting. The contractor shall not clean brushes, rollers, sprayers, trays, or other painting equipment in RTA sinks or drains without prior approval. The contractor remains responsible for collecting and properly disposing of paint residue and cleaning waste. 4. Sprinkler piping and fire-alarm conduit No. Sprinkler piping and fire-alarm conduit are not automatically required to be painted red. Existing utility and safety color designations shall be maintained unless otherwise directed by RTA. Fire-alarm devices, sprinkler heads, valves, identification markings, testing information, and other functional components shall not be painted. Where piping or conduit is to match the ceiling, the contractor shall confirm the treatment with RTA before painting. 5. Disposal of cleaning wastewater

  • Could you please provide marked-up floor plans or a detailed location breakdown identifying the exact areas and surfaces associated with each bid form line item for Buildings 600, 601, and 901, including clarification on which line items (2A–2I) should include the lower-level painting scope in Building 600?

    The bid form is structured as a lump-sum bid, and the basis of award will be the total of all bid-form line items. The line-item values are requested for cost allocation and payment administration and should not be interpreted as purely separate geographic scope boundaries. For Buildings 600, 601, and 901, bidders shall allocate costs to the applicable line item according to the surface, preparation requirements, or category of work described. For example, the service-bay line item shall include the bus-wash areas and other service-bay surfaces requiring different or more extensive surface preparation or coating systems. The lower-level painting scope in Building 600 is being added as a line item to the bid sheet for clarification. Bidders are responsible for including the complete designated painting scope in their total bid based on the contract documents, pre-bid walkthrough, and field verification

  • For Building 600 – Lower Level, please confirm whether the existing red fire sprinkler piping is included in the painting scope.

    Yes, it is included

  • Would pressure washing be acceptable within the garages and in interior buildings as one of the surface preparation methods?

    Pressure washing may be used as a surface-preparation method within garage, service-bay, wash-bay, and similar industrial areas where the existing substrate, drainage, electrical conditions, equipment, and facility operations permit its safe use. The Contractor shall protect buses, equipment, electrical components, HVAC equipment, fire alarm devices, cameras, sensors, lighting, overhead traction-power infrastructure, and adjacent occupied areas from water and debris. Pressure washing is not acceptable in moisture-sensitive interior areas, near OCS or Powered Equipment unless specifically approved in writing by RTA. The Contractor remains responsible for selecting surface-preparation methods compatible with the substrate and proposed coating system. Surfaces must be fully dry, clean, and accepted by RTA before primer or coating application. Pressure washing shall not be used on lead-containing coatings unless it is part of an approved lead-safe work plan meeting applicable containment, wastewater-control, and disposal requirements. Prior coordination and written approval from RTA will require at least 72 hours’ notice and: A. Isolation or protection of electrical and traction-power equipment B. Collection and lawful disposal of wash water C. No discharge into storm drains D. Adequate ventilation and drying time E. Moisture verification before coating F. Restoration of the area to a clean, operational condition

Plain text

OpenGov categories

  • 23832 · Painting and Wall Covering Contractors
  • 238320 · Painting and Wall Covering Contractors