Negrito Well Install

Combined Synopsis/SolicitationSmall BusinessActive

Key Takeaways

  • 6 days remaining to prepare your response
  • Set-aside for Small Business businesses
  • Work to be performed in ALBUQUERQUE, NM
  • Industry: Water and Sewer Line and Related Structures Construction

Contract Details

Notice ID
127EAV26Q0026
Opportunity Type
Combined Synopsis/Solicitation
Sub-Agency
FOREST SERVICE
Office
Southwestern Regional Office, Region 3
Posted Date
Monday, February 9, 2026
Response Deadline
Monday, February 23, 2026
PSC Code
S114
Place of Performance
ALBUQUERQUE, NM, 87102
Status
Active

Description

The contractor shall construct a new well at the Negrito Fire Base to replace the existing well system, which was deemed irreparable due to a crushed drop pipe and fallen pitless adaptor. Work shall include but is not limited to: drilling, casing installation, surface prep, and complete assembly of a functional water system according to NMED Standards. All work must comply with applicable federal, state, and local regulations. The well should be as close as to the existing well as possible/feasible and should be connected into the existing distribution system. Contractor is responsible for all labor, tools, equipment, permitting, and materials. This solicitation replaces a prior solicitation that was canceled following award due to awardee withdrawlal.

Why This Opportunity Matters

AGRICULTURE, DEPARTMENT OF is actively seeking qualified contractors for water and sewer line and related structures construction with a set-aside for Small Business businesses in ALBUQUERQUE, NM. This set-aside designation means eligible businesses face reduced competition from larger firms.