NWS Southern Region WFO Emergency Power Generator Replacement (Multiple Sites)
Key Takeaways
- Set-aside for Small Business businesses
- Work to be performed in SILVER SPRING, MD
- Industry: All Other Miscellaneous Electrical Equipment and Component Manufacturing
Contract Details
- Notice ID
- 1305M426Q0048
- Opportunity Type
- Combined Synopsis/Solicitation
- Agency
- COMMERCE, DEPARTMENT OF
- Sub-Agency
- NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
- Office
- DEPT OF COMMERCE NOAA
- Posted Date
- Friday, August 21, 2026
- Response Deadline
- Friday, September 4, 2026
- PSC Code
- 6115
- Set-Aside
- Small Business Set Aside - Total
- Place of Performance
- SILVER SPRING, MD, 20910
- Status
- Active
Description
NWS Southern Region WFO Emergency Power Generator Replacement: NOAAs National Weather Service (NWS) requires the replacement of an existing generator at each of the Weather Forecast Offices (WFO) in the Southern Region. The 14 generators installed will be Kohler 277/480-volt 3-phase and range from 125 to 150 kVA. Option 1 will include fuel tank refurbishment or replacement, Option 2 will replace electrical panels, option 3 will provide building repairs. Location: Brownsville, TX; Corpus Christi, TX; Jacksonville, FL; Key West, FL; Lake Charles, LA; Slidell, LA; Little Rock, AR; Melbourne, FL; Mobile, AL; Nashville, TN; San Juan, PR; Tampa, FL; and Birmingham, AL: Atlanta, GA.
Why This Opportunity Matters
COMMERCE, DEPARTMENT OF is actively seeking qualified contractors for all other miscellaneous electrical equipment and component manufacturing with a set-aside for Small Business businesses in SILVER SPRING, MD. This set-aside designation means eligible businesses face reduced competition from larger firms.
Similar Opportunities
Browse Related
Looking for more opportunities?
Browse our full directory of government contracts