The project is described as Warehouse, Shop and Gym HVAC equipment Replacement. The United States Department of State (DOS) requires engineering and construction services to remove and replace three (3) curb mounted roof top units (RTUs) installed on the warehouse, Workshop and Gym at the U.S Embassy Compound in Paramaribo Suriname. The buildings are one (1) story buildings located around the perimeter of the compound. The intent is for the new RTUs to fit on the existing to remain RTU curbs. The contractor shall remove and properly dispose of demolished equipment and materials or otherwise instructed by COR or Facility manager. This work will also include any necessary modifications to the buildings roofing/flashing, electrical, and HVAC systems and their associated components. The antici
STATE, DEPARTMENT OF is actively seeking qualified contractors for plumbing, heating, and air-conditioning contractors with a set-aside for No Set Aside businesses in WASHINGTON, DC. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts