This work consists of furnishing all labor, equipment, access, and materials for replacing the hydraulic swivel coupling and trolley hydraulic hoses that operate the hydraulic swivel coupling on the piggyback crane meeting the requirements of this specification at Meldahl Locks and Dam. The existing brackets shall be replaced by the contractor with draw chains. All components shall be new. The Contractor shall be responsible for the proper handling, maintenance, storage and protection of all materials and equipment until installed and accepted. Once all these items are installed, the Contractor shall test the crane to ensure the crane operates without further issues to these components. Contractor shall remedy any issues and retest until the crane is returned to service. Prior to any work
The Department of DEFENSE is actively seeking qualified contractors for commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance with a set-aside for Small Business businesses in HUNTINGTON, WV. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts