The U.S. Embassy Guatemala INL requires the acquisition of prefabricated structures that fulfill or exceed the requirements of the statement of work (SOW) detailed in this document. The Contractor shall furnish and install all materials required by this contract. The contract drawings are set forth in Section J as Attachment 1. For a thorough understanding of the requirements, the Contractor must design and deliver one building for classroom, that will accommodate 30 students. The building must be made by using prefabricated modules. These modules should be manufactured in accordance with the basic architectural layout outlined in attached drawings. The Contractor will be responsible for providing shop drawings (blueprints) for approval that incorporate all design elements. If the Contract
STATE, DEPARTMENT OF is actively seeking qualified contractors for industrial building construction with a set-aside for No Set Aside businesses in WASHINGTON, DC. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts