Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly. See Attached SOO for full details.
The Department of DEFENSE is actively seeking qualified contractors for electrical contractors and other wiring installation contractors with a set-aside for Small Business businesses in MALMSTROM AFB, MT. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts