Professional Construction Management/ General Contracting Services for the Volusia County Branch Jail Air Handler and Fire Alarm Project
Description
Volusia County Branch Jail — Air Handler & Fire Suppression System Replacement and Upgrade Volusia County is seeking qualified Construction Management and General Contractor firms to deliver a major life-safety and HVAC renewal at the Volusia County Branch Jail, 1300 Red John Drive, Daytona Beach. The facility is a single-story detention center that operates around the clock. Its core building systems have reached the end of their service life at the same time, and they no longer meet current code for detention occupancies. Those systems are the housing-pod air handling units, the fire/smoke dampers, the fire alarm system, and the smoke control system. The project restores reliable conditioned air to every housing pod and brings the facility's life-safety systems up to current NFPA, Florida Fire Prevention Code, and UL standards. The work includes replacing the pod chilled-water air handling units along with their mechanical-room ductwork, coils, and outside-air louvers. Fire/smoke dampers will be replaced facility-wide with UL 555/555S rated units. New smoke exhaust fans will give each pod its own isolation and purge capability for the first time. The existing fire alarm system will be replaced with a networked, addressable system running on redundant fiber-optic communication loops. New equipment will be integrated with the facility's building automation system. Design is complete through a Bid Set prepared by Dewberry (mechanical) and Ingenuity Engineers (electrical and fire alarm). Because the jail remains fully occupied throughout construction, success depends on a qualified General Contractor with strong phasing, coordination, and life-safety management skills. The selected firm will manage the following: Temporary cooling for occupied pods Security protocols, including background checks, escorts, and coordination around inmate movement Close coordination with Corrections staff and County Facilities Management Scope of Work VCBJ Air Handler-Fire Alarm Removal and Replacement VOLUSIA COUNTY FACILITIES MANAGEMENT Scope of Work — CM/GC Delivery Project VCBJ Air Handler / Fire Suppression System Removal, Replacement and Upgrade — CA No. 26308 Location Volusia County Branch Jail, 1300 Red John Drive, Daytona Beach, FL (occupied 24/7 detention facility) Design Team Dewberry Inc. (Mechanical, 50166610) / Ingenuity Engineers, Inc. (Electrical & Fire Alarm, I22569.00) Delivery CM/GC — Phase I Preconstruction (fixed fee); Phase II Construction under a GMP 1. Project Summary Replace the end-of-life air handling units, smoke exhaust fans, fire/smoke dampers, and facility fire alarm system at the Branch Jail, and upgrade smoke control to provide per-pod isolation and purge. The County is using CM/GC delivery so the contractor can help resolve open design items, verify existing conditions, and plan phasing before a GMP is set. 2. Phase I — Preconstruction Services Task CM/GC Responsibility Document review Constructability review at each milestone; comment log tracked to resolution; pricing input on open items (Section 6). Existing conditions Field-verify AHUs, piping, ducts, rigging paths, roof, and electrical capacity. Survey fire alarm conduit for reuse. Provide written deficiency report on damper relay panels. Phasing & logistics Pod-by-pod phasing with Corrections; temporary cooling plan; fire alarm/smoke control cutover and fire watch plan; security plan. Cost & schedule Milestone estimates, value analysis, master schedule, and early release of long-lead equipment if authorized. Procurement & GMP Competitive trade bidding with open tabulations; GMP with clarifications, allowances, contingency, and schedule of values. 3. Phase II — Construction Scope System Scope Air handling units Demolish existing AHUs and in-room ductwork/piping to points of disconnect. Install new chilled-water AHUs per M0.2 (AHU-1.1 through AHU-16, plus AHU-K kitchen RTU with curb adapter). Replace HW reheat coils and OA louvers like-for-like. Hydronics New CHW/HW piping from risers, valves, balancing, gauges, insulation, supports, vibration isolation, and identification. Smoke control Replace purge/exhaust fans (SEF series, UL smoke-control rated); replace fire/smoke dampers facility-wide (UL 555/555S); repair damper relay panels; implement per-pod isolation and purge sequences per E6.04. Controls / BAS Controls for all new equipment integrated with the BAS, with graphics, alarms, and point verification. Final extent confirmed in preconstruction. Fire alarm Full replacement: networked addressable system, pod FACPs #1–#10 and Master FACP on redundant Class A 2-hr fiber loops; voice evacuation; all HVAC, damper, door, PA, and lockdown interfaces; approx. 68 new devices; reuse existing conduit where devices stay in place. Electrical Power to new equipment, disconnects and VFD wiring, panel modifications per E10 series, grounding, surge protection, and demolition of existing HVAC electrical to source. Temporary work Temporary cool air units while units are being replaced; fire watch not required whenever life-safety systems are impaired. Closeout TAB, HVAC commissioning, NFPA 72 and smoke control acceptance testing, AHJ inspections, training, O&M manuals, and record drawings. 4. Detention Facility Requirements Background checks, escorts, and controlled tool and material inventories for all personnel. Work in or near housing pods scheduled with facility staff; existing security features and lockdown systems remain intact at all times. Fire Marshal notification and 24-hour watch before disabling any existing smoke control or fire alarm system. 5. Allowances and Contingency Existing conduit replacement — Owner allowance in the GMP, sized from the preconstruction survey; written authorization required before use. Damper relay panel repairs — allowance until the deficiency report defines the work. CM contingency in the GMP; Owner contingency held separately by the County. 6. Exclusions Ductwork and controls beyond the mechanical rooms and penthouses serving the pods. Central chilled-water and hot-water plants (existing to remain). Hazardous materials abatement, unless identified and priced in the GMP. Introduction Summary Background Contact Information Timeline Purpose and Overview Purpose and Overview The purpose of this request for statement of qualifications (RSQ) is to select the most highly qualified firm or firm(s) to provide the requested services. It is anticipated that one (1) firm or multiple firms will be awarded a basic contract to provide the necessary services for a period of NO VALUE may be allowable exercisable at the option of the County and as approved by the County and mutually agreed upon. This solicitation is made in accordance with the provisions of Chapter 287.055, Laws of Florida, known as the Consultants’ Competitive Negotiation Act (CCNA). Special Terms and Conditions Closing Date and Non-mandatory Pre-Solicitation Conference A. Request for Statement of Qualifications (RSQ) Closing Date Response must be received through the County's eProcurement Portal before 3:00 pm on Thursday, December 3, 2026 . Responses received after this time will not be considered. B. Pre-solicitation Conference 1. A non-mandatory pre-solicitation conference will be held at 9:00 am on Thursday, November 12, 2026 at 1300 Red John Drive, Daytona Beach FL, 32124 . While this is not mandatory, all interested parties are encouraged to attend and participate. 2. In accordance with the American Disabilities Act and Section 286.26, Florida Statutes, persons with disabilities needing a special accommodation to participate in the proceedings, or an interpreter to participate in any proceedings, should contact the County’s ADA Coordinator at 386‑248‑1760 for assistance, at least two (2) business days before any meeting date. Assisted listening system receivers are available for the hearing impaired, and can be obtained from the Deputy Clerk by contacting the County’s ADA Coordinator at 386-248-1760. Read the full ADA Notice under The American with Disabilities Act (Title II), at County of Volusia Notice Under the Americans With Disabilities Act (Title II) . Read the County of Volusia Grievance Procedure under The Americans with Disabilities Act (Title II). 3.Non-mandatory Pre-solicitation: You may RSVP via the County's eProcurement Portal. The County will electronically record attendance of the firms via the County's eProcurement Portal. Additionally, the County of Volusia reserves the right to add a second pre-bid meeting, if the County deems it necessary. Authorized Official The Solicitation response and all required forms must be submitted/signed by an official authorized to legally bind the Respondent to all Solicitation provisions. A Memorandum of Authority may be submitted to document that the individual is authorized to commit the firm to a contract. Payment Terms 1. The County will remit full payment on all undisputed invoices within forty-five (45) business days from receipt by the appropriate person(s) (to be designated at time of Agreement) of the invoice(s) or receipt of all products or services ordered. 2. Pursuant to Chapter 218, Florida Statutes, the County will pay interest not to exceed one percent (1%) per month on all undisputed invoices not paid within thirty (30) days after the due date. 3. The County has the capability of Electronic Funds Transfer (EFT). List any discounts for prompt payment and/or willingness to accept Electronic Funds Transfer (EFT) and the discount to be applied to such payments. Contractor s offering prompt payment discounts, for example 1% - net 10, the discount shall be taken if the check issue date is within specified time period from date of invoice. By submitting a Response to the County of Volusia, Florida, the Respondent expressly agrees that, if awarded an Agreement, the County may withhold from any payment monies owed by the Respondent to the County for any legal obligation between the Respondent and the County, including, but not limited to, real property taxes, personal property taxes, fees, and commissions. Award Term The County is looking to promote partnership relationships within the policies and procedures of public procurement. Pursuant toward that end, the successful Respondent shall be awarded an Agreement for an initial 610 Days or until project completion, whichever occurs first. term with the option for No renewals . All renewals will be contingent upon mutual written agreement and, when applicable, approval of County Council. Damages Due to the nature of the services to be provided and the potential impact to the County for loss, the awarded Respondent cannot disclaim consequential or special damages related to the performance of this Agreement. The awarded Respondent shall be responsible and accountable for any and all damages, directly or indirectly, caused by the actions or inaction of its employees, staff, or Subcontractor . There are no limitations to this liability. This section does not apply to the extent precluded or prohibited by applicable law. Liquidated Damages Time is of the essence for this project. Any delays from the dates contained in the Agreement issued to the awarded Respondent shall inconvenience the Public and result in monetary losses and damages to the County. The losses and damages shall be difficult to determine. In the event that the deliverables are not provided by the date set in the resulting Agreement, there shall be deducted, as agreed, fixed liquidated damages from the Agreement price being paid by the County of Volusia. This computed sum shall be Two Thousand Five Hundred Dollars ($2,500) per day , including Saturdays and Sundays. Such sums are hereby agreed to be reasonable predictions of damages, which will be sustained and are specifically declared to not constitute a penalty for breach of contract. Evaluation Method The County will appoint a committee consisting of County staff to evaluate the proposals and to make recommendation to the County Council. The County will be the sole judge of its own best interests, the proposals, and the resulting Contract, if any. The County’s decisions will be final. Award will be made to the proposal(s), which presents the best value to the County based on the entire evaluation process and all the information gathered. Note: Respondents are prohibited from contacting any of the committee members, other than the Procurement Analyst, prior to the recommendation of award from the committee . Presentations by Respondents 1. The County of Volusia, at its sole discretion, may ask individual Respondents to make oral presentations and/or demonstrations without charge to the County. 2. The County reserves the right to require any Respondent to demonstrate to the satisfaction of the County that the Respondent has the fiscal and managerial abilities to properly furnish the services proposed and required to fulfill the requirements of the RSQ. The demonstration must satisfy the County and the County shall be the sole judge of compliance. 3. Respondents are cautioned not to assume that presentations will be required and should include all pertinent and required information in their original proposal package. Proposal Acceptance/Rejection The County reserves the right to accept or reject any or all proposals received as a result of this Solicitation, or to negotiate separately with competing Respondents, and to waive any informalities, defects, or irregularities in any proposal, or to accept that proposal or proposals, which in the judgment of the proper officials, is in the best interest of the County. Proposal Acceptance Period Any Proposal in response to this RSQ shall be valid through June 3, 2027 . At the end of this time the proposal may be withdrawn at the written request of the Respondent if no award has been made. If the Proposal is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled regardless of the status of the proposal bond. The County reserves the right to request an extension of the proposals if a Contract has not been executed by June 3, 2027 . Termination (RSQ) The performance of Work or Services under a Contract may be terminated by the County in accordance with this clause in whole or from time to time in part, upon at least thirty (30) days prior written notice to Contractor whenever the County shall determine that such termination is in the best interest of the County. Any such termination shall be effected by delivery to the Contractor of a Notice of Termination specifying the extent to which performance of work under a Contract is terminated, and the subsequent date upon which such termination becomes effective. County may terminate a Contract in whole or part for convenience at will or for non-appropriation of funds by County. Upon receipt of such notification, Contractor shall inform County of the extent to which performance is completed and unless notified in writing by the County otherwise, the Contractor shall take no further steps towards completion of the Project. Upon payment by County, Contractor shall deliver to County any and all completed Deliverables and Deliverables-in-progress that then exist for the Project. If the County terminates the Project due to the Contractor ’s failure to meet a completion deadline as set forth in a Contract, the County may seek the services for the Project from another consultant and no sums shall be due to the Contractor as a result of any work or services that have been performed by the Contractor for the Project. After receipt of a Notice of Termination as set forth in above, and except as otherwise directed by the County, the Contractor shall: Stop work under a Contract on the date and to the extent specified in the Notice of Termination. Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of such portion of the work under a Contract, as it is not terminated. Terminate all orders and subcontracts pursuant to this Article to the extent that they relate to the performance of Work or Services terminated by the Notice of Termination. Assign to the County, in the manner, at the times and to the extent directed by the County, all of the right, title, and interest of the Contractor under the orders and subcontracts so terminated, in which case the County shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts. With the approval of the County and to the extent required by the County, settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts. County's approval of such settlements shall be final for all the purposes of a termination under the Article. In addition, Contractor shall transfer title and deliver to the County, in the manner, at the times, and to the extent, if any, directed by the County: The sketches, calculations, reports, models, studies and other Work-in-process, completed Work or Services, supplies, and other materials produced as a part of, or acquired in connection with the performance of the Work or Services terminated by the Notice of Termination; and, The completed or partially completed designs, plans, drawings, information, and other property, which, if the Contract has been completed, would have been required to be furnished to the County. Contractor shall complete performance of such part of the Work or Services as shall not have been terminated by the Notice of Termination. After receipt of a Notice of Termination, the Contractor shall submit to the County its termination claim, in the form and with a certification as prescribed by the County. Such claim shall be submitted promptly but in no event later than thirty (30) days from the effective date of termination, unless one (1) or more extensions in writing are granted by the County, upon request of the Contractor made in writing within such thirty (30) day period or authorized extension thereof. Upon failure of the Contractor to submit its termination claim within the time allowed, the County may determine on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall there upon pay to the Contractor the amount so determined. Subject to the provisions of set forth above, the Contractor and the County may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant to this Article which amount or amounts may include a reasonable allowance for profit on work done; provided, that such agreed amount or amounts exclusive of settlement costs, shall not exceed the total contract price or Compensation as reduced by the amount of payments otherwise made and as further reduced by the contract price of Compensation for Work not terminated. As such, the Contract shall be amended accordingly and the Contractor shall be paid the agreed amount. Nothing herein, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor and the County to agree upon the whole amount to be paid to the Contractor by reason of the termination of Work or Services pursuant to this clause, shall be deemed to limit, restrict, or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor . In the event of the failure of the Contractor and the County to agree as provided in Section 6. above upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this Article, the County shall pay to the Contractor the amounts determined by the County as follows, but without duplication of any amounts already agreed upon by the parties. For completed Work or Se
Published attachments
- Exhibit_A_-Insurance Requirements 27-SQ-14KO CMGC VCBJ Air Handler & Fire Alarm
- Exhibit_B_-VCBJ_Air_Handler-Mechanical
- Exhibit_C_-2007_AH_Plans
- Exhibit_D_-VCBJ_Air_Handler-_Fire_Alarm_Spec_Book
- Exhibit_E_-VCBJ_Electrical-Fire_Alarm_Plans
- Exhibit_F_-_Vendor_Background_Check_Packet_Rev_05-22-2025
- Exhibit_G_-_Pre-Bid_Parking_Map
- Exhibit_H_-DRAFT, Part A, CM-GC contract,27-SQ-14KO
- Exhibit_I_-DRAFT, Part B, CM-GC contract, 27-SQ-14KO
- Exhibit_J_-27-SQ-14KO-Payment_and_Performance_Bond_
- Professional_Construction_Management_General_Contracting_Services_for_the_Volusia_County_Branch_Jail_Air_Handler_and_Fire_Alarm_Project_(Addendum_#3_Revision).pdf
Addenda and notices
Official Notice #1: Requests for Substitutions or Equivalents · 1
Please submit all requests for substitutions or equivalents to kott@volusia.gov for your products to be reviewed. The approval or denial will be posted once the determination has been made. Please submit all documentation needed to review the proposed product i.e. drawings, cut sheets, etc. with your request. REQUESTS MUST BE SUBMITTED NO LATER THAN NOVEMBER 19, 2026.
Addendum #1 · 1
The bid bond requirement has been removed from this solicitation. A bid bond is no longer required and should not be submitted with your response. Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #2: Evaluation Committee Meeting · 2
Evaluation Committee Meeting- Wednesday, January 6th at 10:30am
Addendum #2 · 2
Exhibit I Title Updated. Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #3: Pre Bid Sign In Sheet 27-SQ-14KO · 3
Addendum #3 · 3
Exhibit_I_-DRAFT, Part B, CM-GC contract, 27-SQ-14KO- Revision made to Section 5.1: Date of Commencement and Substantial Completion. Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
While reviewing the project specifications for the Volusia County Branch Jail Air Handler & Fire Alarm Project, we noted the language in Section 28 30 00.00-11, Part 2 – Products, Section 2.1 Manufacturers, which states: "Available Manufacturers: All devices shall be provided for and manufactured by Notifier with approved equals by EST as prior approved by the Owner." Johnson Controls/Simplex would like to confirm whether Simplex would be considered an acceptable approved equal manufacturer for this project and permitted to submit a fire alarm bid. As background, Simplex is an approved equal to EST, and the existing fire alarm system at the facility was historically a Simplex system that was originally installed approximately 25 years ago. Given this, we would appreciate clarification as to whether a Simplex-based solution will be accepted for bidding and consideration by the Owner.
Per the posted notice, "Please submit all requests for substitutions or equivalents to kott@volusia.gov for your products to be reviewed. The approval or denial will be posted once the determination has been made. Please submit all documentation needed to review the proposed product i.e. drawings, cut sheets, etc. with your request. REQUESTS MUST BE SUBMITTED NO LATER THAN NOVEMBER 19, 2026."
Please confirm the preferred network communication method between the two Fire Alarm Control Panels (FACPs). Should the panels be connected via single-mode fiber or multi-mode fiber? The fire alarm riser diagram appears to indicate two TrueSite Workstations (TSWs) within the same facility. Was the inclusion of two TSWs intentional as part of the design, or is this shown in error? Are there any additional fire protection or fire alarm drawings, specifications, or supporting documents available that would identify any further fire alarm scope not shown in the current drawing set?
The current project drawings and specifications are included in the solicitation exhibits for reference and evaluation. Specification Section 2.9(B) identifies multimode fiber for the fire alarm network. Final communication requirements and equipment configurations, including the quantity and necessity of the TrueSite Workstations shown on the riser diagram, will be reviewed and confirmed with the Architect/Engineer of Record during preconstruction. The fire alarm drawings and specifications currently available to the interested bidders have been included in the solicitation exhibits. Any additional design clarification or supporting documentation determined necessary will be coordinated with the awarded contractor and design team during Part A. Respondents should evaluate the project based on the documents provided and demonstrate their ability to identify and resolve technical and constructability concerns as part of the CM/GC preconstruction process. The current solicitation is for Construction Management/General Contracting (CM/GC) services, beginning with Part A – Preconstruction Services. A CM/GC has not yet been selected, and construction services under Part B have not been authorized.
The Legend calls for Voice Speaker but the panel details, Specifications, and riser calls for horn strobe can you clarify if voice or non-Voice system is desired/needed?
The current project documents reference both speaker/strobe and horn/strobe notification devices. A combination of these devices may be appropriate depending on the final system configuration and operational requirements of the facility. As this solicitation is for CM/GC services, the County anticipates further coordination with the Architect/Engineer of Record during Part A – Preconstruction Services to verify the intended notification system, associated equipment, and integration with existing facility operations. Any necessary design clarifications will be addressed during preconstruction and incorporated into the final construction documents and Guaranteed Maximum Price (GMP) development prior to authorization of Part B.
Where are allowable staging areas located for crane usage.
As this solicitation is for Construction Manager/General Contractor (CM/GC) services, specific crane locations, equipment staging areas, and lifting logistics have not yet been finalized. The County anticipates coordinating these requirements with the selected CM/GC, County Project Manager, and Architect/Engineer of Record during Part A – Preconstruction Services to evaluate and establish appropriate locations and methods prior to construction.
Section 3.7 requires a bid bond of not less than 5% of the bid amount and directs respondents to “complete and submit the Bid bond form provided in this solicitation.” However, no bid bond form is among the attachments (Exhibit J is the Payment and Performance Bond), the questionnaire has no upload section for bid security, and this RSQ asks for no bid price. Please clarify: (a) Is bid security required with the RSQ response, or only at a later stage (e.g., GMP)? (b) If required, what dollar amount should the 5% be based on? (c) Will the County provide its bid bond form, or is a standard surety form (e.g., AIA A310) acceptable? (d) Where in OpenGov should it be uploaded?
The bid bond requirement has been removed from this solicitation. A bid bond is no longer required and should not be submitted with your response.
Sections 7.1. Firm Licenses, Certifications, and Team Qualifications and 7.4. Project Manager and Key Personnel both ask for resumes. Should we include our team resumes in both uploads?
No. Resumes do not need to be uploaded twice. Submit all required resumes under Section 7.4. In Section 7.1, provide the firm's licenses, certifications, and qualifications, and reference the resumes submitted in Section 7.4 as needed.
The Phase II scope table states “fire watch not required whenever life-safety systems are impaired.” Section 1.2 and Section 4 (Detention Facility Requirements) require fire watch and a 24-hour watch before disabling any smoke control or fire alarm system. Please confirm that fire watch is required during all impairments, and whether its cost is to be carried in the CM/GC’s GMP or provided by the County.
The County's intent is to maintain required life-safety protections throughout construction and minimize interruptions to existing facility operations. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager, Architect/Engineer of Record, and facility representatives during Part A – Preconstruction Services to develop an appropriate construction phasing and temporary life-safety plan, including fire watch requirements where applicable. Any required fire watch or alternative temporary protection measures will be coordinated with the applicable fire authority and incorporated into the construction scope and Guaranteed Maximum Price (GMP) development for Part B. Responsibility for providing these services and associated costs will be established during preconstruction prior to authorization of Part B.
Section 1.1 and the scope header refer to “Fire Suppression System Replacement,” but the scope describes no sprinkler or suppression work. Spec Section 283000, paragraph 1.3.G (Pathway Survivability Level 3), assumes the building is fully sprinklered per NFPA 13. Please confirm: (a) whether any sprinkler/suppression work is included in this project, and (b) whether the Branch Jail is currently fully sprinklered.
The anticipated project scope includes replacement and upgrades to the existing fire alarm system and associated air handling equipment, including required interfaces and coordination with existing fire suppression and life-safety systems. A complete replacement of the existing sprinkler or fire suppression system is not currently identified as part of the proposed scope. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to verify existing conditions, evaluate applicable code requirements, and identify any additional work necessary to support the proposed improvements. The existing sprinkler system configuration and applicable pathway survivability requirements will be reviewed and confirmed during preconstruction, with any necessary design clarifications incorporated into the final construction documents prior to establishment of the Part B Guaranteed Maximum Price (GMP).
The scope describes “redundant Class A 2-hr fiber loops,” while Spec Section 283000, paragraph 1.3.G, requires fiber optic cable that is “3 hour rated.” Please confirm which rating governs.
The County acknowledges the discrepancy between the scope of services and Specification Section 283000 regarding the fire alarm fiber-optic cable rating. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to review and confirm the required fiber-optic cable rating, redundant communication pathways, and applicable life-safety requirements. Any necessary design clarifications will be incorporated into the final construction documents and Guaranteed Maximum Price (GMP) development prior to authorization of Part B – Construction Services.
Spec Section 283000, Part 1, paragraph G requires a minimum 2-year warranty on all components and labor, but the same paragraph refers to “the one-year labor warranty.” The Part B contract provides a one-year general warranty. Please confirm the required warranty period for the fire alarm system.
The County anticipates a minimum two-year warranty on fire alarm system components and labor, consistent with Specification Section 283000, Paragraphs 1.8(G) and 1.10(I). The general one-year construction warranty identified in the proposed Part B contract does not preclude additional system-specific warranty requirements. Final warranty language will be reviewed and reconciled with the Architect/Engineer of Record during Part A – Preconstruction Services and incorporated into the Part B construction documents.
The scope calls for replacement of SEF-series purge/exhaust fans, UL smoke-control rated, but the Spec Book (Exhibit D) has no specification section for these fans. Please confirm whether fan requirements appear only on the drawings, or whether a specification section will be issued.
The County acknowledges the bidder's observation regarding the smoke exhaust fan specifications. The current project drawings and specifications are provided as the basis for evaluating the anticipated project scope. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to review the smoke exhaust fan requirements, verify applicable equipment performance and life-safety criteria, and identify any additional specifications or design clarifications necessary. Any required supplemental specifications will be developed by the design team and incorporated into the final construction documents prior to establishment of the Guaranteed Maximum Price (GMP) for Part B.
General Note 8 on M3.1–M3.3 states “All dampers shall be stainless steel or aluminum.” Section 233300 and Detail 1/M4.2 (Ruskin FSD60) call for galvanized fire and combination fire/smoke dampers. Please confirm the required material.
The County acknowledges the differing damper material references within the project documents. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to review the applicable damper types, material requirements, and performance criteria based on their intended locations and functions. The final damper specifications and any necessary design clarifications will be confirmed by the design team and incorporated into the construction documents prior to establishment of the Part B Guaranteed Maximum Price (GMP).
General Note 6 on M3.3 states that all outside air louvers are to be “replaced like for like.” Reference Note 6 on M3.1/M3.2 states that the existing OA intake louvers are to remain, and Section 230000 §1.8.D.9 assigns louvers to other sections. Please confirm whether louvers are to be replaced and, if so, by which trade.
The County acknowledges the differing references regarding replacement or reuse of existing outdoor-air intake louvers. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to evaluate existing louver conditions, determine where replacement or reuse is appropriate, and coordinate the associated trade responsibilities. Any required modifications or replacements will be identified and incorporated into the final construction scope and Guaranteed Maximum Price (GMP) development prior to authorization of Part B.
The M0.1 Temporary Service notes require a minimum of (2) 50-ton chilled-water AHUs. Please confirm: the intended phasing sequence; the number of AHUs that may be out of service at the same time; the anticipated overall construction duration; any approved roof locations or crane access points for the temporary units.
The current project documents identify the anticipated temporary cooling requirements to support the replacement of existing air handling equipment while maintaining facility operations. As this solicitation is for CM/GC services, the County anticipates working with the selected contractor, County Project Manager, Architect/Engineer of Record, and Corrections representatives during Part A – Preconstruction Services to develop and evaluate the proposed construction phasing, temporary cooling arrangements, equipment outage limitations, and anticipated construction schedule. Temporary equipment locations, crane access, and associated staging requirements will also be evaluated during preconstruction based on existing site conditions, operational restrictions, and applicable safety requirements. The final approved phasing and temporary cooling plan will be incorporated into the construction scope and GMP development prior to authorization of Part B.
EF-X appears on 2/M3.3 but is not listed in the Exhaust Fan Schedule on M0.2. Please confirm whether EF-X is new or existing to remain, and provide its performance data if new.
The County acknowledges the bidder's observation regarding the EF-X designation and associated equipment schedule. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to verify the existing equipment, confirm whether EF-X is intended for replacement or reuse, and identify any necessary performance criteria or schedule revisions. Any required design clarifications will be incorporated into the final construction documents and GMP development prior to authorization of Part B.
The AHU schedule calls for VFDs on AHU-1.1, 1.2, 16 and K. The MR1 plan shows wall-mounted VFDs, and Section 232923 also applies. Please confirm whether the VFDs are factory unit-mounted or separate wall-mounted units.
The current project documents identify VFD requirements associated with the referenced air handling equipment, including the equipment schedules, mechanical drawings, and Specification Section 232923. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to verify the intended VFD configuration, mounting locations, electrical requirements, and equipment interfaces. The final configuration, including whether the VFDs are factory-mounted or separately wall-mounted, will be confirmed during preconstruction and incorporated into the construction scope and GMP development prior to authorization of Part B.
Notes 1–11 of the HWC schedule on M0.2 (UL listed for smoke control, air pressure switch, hi-limit, ceramic holders, 80-20 wire, 24V transformer) appear to apply to electric duct heaters. The scheduled coils are hot-water coils (Trane D5WB). Please confirm that these notes do not apply.
The current project documents identify VFD requirements associated with the referenced air handling equipment, including the equipment schedules, mechanical drawings, and Specification Section 232923. As this solicitation is for CM/GC services, the selected contractor will coordinate with the County Project Manager and Architect/Engineer of Record during Part A – Preconstruction Services to verify the intended VFD configuration, mounting locations, electrical requirements, and equipment interfaces. The final configuration, including whether the VFDs are factory-mounted or separately wall-mounted, will be confirmed during preconstruction and incorporated into the construction scope and GMP development prior to authorization of Part B.
General Note 4 on M0.1 requires verification of existing conditions before equipment is purchased. Please advise: whether the Owner can share as-built information on the existing equipment; the access route for bringing new AHU sections into the interior mechanical rooms (doors, roof hatches or other openings); whether any temporary roof or wall openings are permitted.
As this solicitation is for CM/GC services, the County anticipates further coordination with the selected contractor, County Project Manager, Architect/Engineer of Record, and Corrections representatives during Part A – Preconstruction Services to verify existing equipment conditions, evaluate access limitations, and develop appropriate equipment removal and installation methods. Available existing-condition documentation will be reviewed during preconstruction. Proposed rigging routes, staging areas, and any temporary roof or wall openings will be evaluated based on facility operations, structural considerations, security requirements, and applicable permitting. No specific rigging route or temporary structural opening is approved at this stage. Any proposed modifications will require review and authorization by the County and applicable design professionals prior to implementation. The resulting construction methodology and associated costs will be incorporated into the final scope and GMP development for Part B.
Are there page limits or formatting requirements for the narrative responses in Sections 6 and 7?
There are no page limits. Responses must be submitted in one of the allowable file formats identified in the solicitation (Microsoft Word, Microsoft Excel, or Adobe PDF).
Criterion 4 asks respondents to confirm named staff can pass “Department of Corrections background screening.” Please confirm whether this refers to the Volusia County Corrections process in Exhibit F, and whether a written statement of eligibility is sufficient at submission, with screenings completed after award.
Yes. This refers to the Volusia County Corrections background screening process in Exhibit F. A written statement confirming the proposed staff can pass the required background screening is sufficient with the proposal. The background screening and Exhibit F forms will be completed after award, before personnel are granted site access.
Does the County intend to shortlist firms for oral presentations or interviews? If so, please provide the anticipated timeframe.
Presentations have not been predetermined at this time. The County reserves the right to conduct presentations. Shortlisted firms will be notified if they are required.
The RSQ states an award term of 610 days, while Exhibit I (Part B) Section 5.1 sets Substantial Completion at 365 calendar days after Notice to Proceed, with $2,500/day liquidated damages. Please clarify: (a) whether the 365 days begins at the Part B Notice to Proceed issued after GMP approval, (b) whether long-lead equipment released early during preconstruction counts against Contract Time, and (c) whether the 365 days may be adjusted in the GMP based on the phasing plan developed with Corrections.
Exhibit I has been revised to reflect the correct 610-calendar-day contract time. (a) Yes. The 610-calendar-day contract time begins upon issuance of the Part B Notice to Proceed following GMP approval. (b) Long-lead equipment procurement initiated during preconstruction will be taken into consideration when establishing the project schedule. (c) The County reserves the right to negotiate and finalize the contract time, including any adjustments to the 610-calendar-day duration, as part of the GMP development based on the approved phasing plan and project needs.
The Phase I table calls for “pricing input on open items (Section 6),” but Section 6 of the scope is Exclusions. Please identify the open design items the County expects the CM/GC to address during preconstruction.
Open design items the CM/GC is expected to address in preconstruction: Smoke control rational analysis (highest priority). No FBC 909 rational analysis has been issued. When it is, it may change fan, damper and sequence scope. The CM/GC works with the design team as it’s prepared and gives constructability and pricing feedback. This includes who handles the 909.18 special inspection and acceptance testing. Fire alarm basis of design. Three sources conflict: Spec 283000 names Notifier, drawings E5.01–E5.11 show Edwards EST3, and the permit checklist responses reference Gamewell-FCI. One manufacturer must be selected. BAS extent. Specs 230900 and 230940 describe a new BAS, but current direction is to tie in to the existing system. This needs an Owner decision, and the CM/GC prices both options. Fire/smoke damper schedule. The set has no damper schedule. Damper actuator voltage and control interface also conflict across 233300, 260501, 230940 and E6.04. Voice evacuation. Voice evacuation is required, but no amplifiers or voice components appear on the FACP diagrams. Electrical coordination. On AHU-9B, 11B and 12B, the breaker sizes (15A) don’t match the MOCP (20A). The AHU-K kitchen RTU at 208V with a 90A breaker also needs confirmation. Code references. Make every code edition cited match FBC 2023 and FFPC 7th Edition. Document completeness. Some sheets are listed on G-001 but missing from the issued set. Spec Section 238216.11 is cited in a pre-bid response but isn’t in the Ta
Please confirm: (a) Section 2.1 states a contract period of “NO VALUE”; what is the intended term? (b) The Exhibit I title references “27-SQ-114KO”; please confirm this should read 27-SQ-14KO
(a) The contract period of "No Value" in Section 2.1 is a placeholder and will be updated upon award. (b) Yes. Exhibit I has been corrected to reference 27-SQ-14KO.
Temporary Service Note 4 on M0.1 requires coordination of a 24-hour watch with the Owner before the existing smoke control system is disabled.
Please clarify the question being asked so we can provide an appropriate response.
Detail 2/M4.1 shows a 4" concrete pad under the AHUs.
Please clarify the question being asked so we can provide an appropriate response.
Can you please provide a site plan with perimeter road to coordinate crane logistice.
As this solicitation is for Construction Manager/General Contractor (CM/GC) services, specific crane locations, equipment staging areas, and lifting logistics have not yet been finalized. The County anticipates coordinating these requirements with the selected CM/GC, County Project Manager, and Architect/Engineer of Record during Part A – Preconstruction Services to evaluate and establish appropriate locations and methods prior to construction.
The proposed RTU for mechanical number 2, 6, 7, 10, 13, and 50 is showing to be mounted above the roof line. Please provide structural detail for the attachment.
As this solicitation is for CM/GC services, the County anticipates further coordination with the selected contractor, County Project Manager, and Architect/Engineer of Record during Part A – Preconstruction Services to review the proposed rooftop equipment installations, existing structural conditions, and associated support and attachment requirements. The appropriate structural support details, equipment anchorage, and any necessary modifications will be evaluated and coordinated with the design team during preconstruction and incorporated into the final construction documents and Guaranteed Maximum Price (GMP) development prior to authorization of Part B – Construction Services.
Johnson Controls Fire Protection (Simplex) has submitted attached product data and cut sheets for the proposed fire alarm system, including the Simplex 4100ES, 4010ES, and TrueSite Workstation (TSW), for the Volusia County Branch Jail Air Handler & Fire Alarm Project. Please confirm whether the proposed Simplex ES Net-based fire alarm system is considered an acceptable equivalent to the specified EST system and is eligible for bidding and consideration on this project. If not, please identify any deficiencies or additional documentation required to support the equivalency review.
The County acknowledges the request for consideration of the proposed Simplex fire alarm system and associated equipment. As this solicitation is for CM/GC services, the County anticipates further coordination with the selected contractor, County Project Manager, and Architect/Engineer of Record during Part A – Preconstruction Services to evaluate proposed equipment alternatives and verify compliance with the project's technical specifications, operational requirements, and applicable life-safety codes. The proposed Simplex system may be submitted for consideration during the preconstruction process; however, no determination of equivalency or approval of the proposed equipment is being made at this stage. Any proposed alternative must demonstrate compliance with the applicable project requirements and receive the necessary review and approval prior to incorporation into the final construction documents and Guaranteed Maximum Price (GMP) for Part B.
OpenGov categories
- 03167 · HVAC Equipment, Accessories and Supplies (Not Otherwise Classified)
- 34016 · Fire Alarm Systems, Power Sirens, and Controls
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 91000 · Building Maintenance, Installation And Repair Services
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91400 · Construction Services, Trade (New Construction)
- 95220 · Correctional