The USDA Medfly Preventative Release Program requires the complete removal and disposal of the existing backup generator (C100D6C Diesel Genset, 60Hz, 100kW) and Automatic Transfer Switch (ATS) (CBLC, Bypass Transfer Switch?Power Command: 150A/225A/260/300/400/600A), along with the removal and disposal of the associated diesel fuel tank, diesel fuel, and concrete equipment pad. This requirement includes furnishing and installing a new diesel?powered backup generator, a new Automatic Transfer Switch (ATS), a new diesel fuel tank with fuel, and a new concrete pad, as well as all items required to completely install, test, and commission the equipment in accordance with the Statement of Work. The new generator must provide a minimum standby capacity of 100 kW, equal to the existing system. Ge
AGRICULTURE, DEPARTMENT OF is actively seeking qualified contractors for electrical contractors and other wiring installation contractors with a set-aside for Small Business businesses in MINNEAPOLIS, MN. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts