Residential Interior Painting for the Housing Authority of Washington County (HAWC)
Description
The Housing Authority of Washington County (HAWC) is a public entity tasked with providing high quality, safe and affordable housing in Washington County. HAWC manages a diverse portfolio of residential properties that include single-family homes and multi-family apartment communities distributed throughout Washington County, Oregon. Scheduled Interior Painting Includes prep work, paint, spackling and minor drywall repairs. Additional charges for significant drywall repairs will require prior approval. 1 Bed 1 Bath (650 - 750 sq ft) 2 Bed 1 Bath (750 - 850 sq ft) 2 Bed 2Bath (850 - 960 sq ft) 3 Bed 1 Bath (850 - 1000 sq ft) 3 Bed 2 Bath (950 - 1200 sq ft) On-Call Services Truck Charge/Staging - Cost for travel, staging, and other one time charges that would apply to an on-call service. Does not include labor or materials to perform the work, those charges are provided for below. On Call Painting (Includes spackling, texture, and paint) On-Call Sheetrock Repair (Includes patching, texture and paint) Doors Painting (Interior and Exterior) Includes Trim Cabinets Baseboard Trim Tub and Shower Surround Scope of Work General Information Type of contract: Firm Fixed The Contractor shall provide all services at a cost inclusive of: Direct labor hours at specified fixed hourly rates. Equipment, consumable materials, and supplies Overhead and supervision There is no guarantee on the quantity of work that the contractor will be required to do. Work will be performed on an as needed basis as the demands of the housing authority dictate. The Contractor shall complete an affidavit of proof that they did not enter into any collusion with any person in respect to this contract. Contractor must read, understand and be able to meet the requirements set forth in Attachment B - HUD_Forms_Maintenance_2026 The work performed under this contract is on a project assisted under a program receiving direct Federal financial assistance from the Department of Housing and Urban Development (HUD) and is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968. The Act requires that, to the greatest extent possible, opportunities for training and employment will be given to residents of the area of the Section 3 covered project. S afety Measures The contractor shall ensure that residents have continuous access to their units during the project. The contractor shall provide clear signage, fencing, or other barriers to direct residents to the nearest available access point to their units. In the event that access to a unit is temporarily blocked, the contractor shall provide a temporary alternative access point and shall restore access to the original access point as soon as possible. The contractor shall take all necessary steps to minimize disruptions and inconvenience to residents during the project. All HAWC properties are strictly no smoking; this includes all interior and common areas, parking areas and yards. Contractor shall ensure that all employees are aware of the no- smoking policy and shall enforce this provision. Violating personnel may be excluded from the property and this contract by the HAWC contract administrator. Failure to comply with this provision may result in contract termination. The Contractor shall clean the work site each day and upon completion of the project and verify that all debris is removed from the premises. A magnetic sweep will be performed twice daily around the perimeter of the project and along all pedestrian walkways to ensure removal of nails, screws, or any small metal foreign matter. The work site shall be left in a condition comparable with that at the beginning of the project. In accordance with all applicable laws and generally accepted practices, the Contractor will be solely and completely responsible for conditions of the job site, including the safety of all persons and property during the performance of the work. The Contractor shall always prioritize the safety of employees on the work site by taking all necessary precautions. This includes erecting and consistently maintaining all required safeguards to protect both workers and the public, adapting as needed to job conditions and the progress of work. The Contractor shall also clearly post danger signs to warn against any hazards created by ongoing operations and work in progress. If the Contractor fails to correct work that is not in accordance with safety requirements or recognized industry standards, HAWC may order the Contractor to stop all work, or any portion of work. However, the right of the HAWC to stop work shall not give rise to a duty on the part of HAWC to exercise this right for the benefit of the Contractor or any other person or entity. PPE: Safety gear is required of all staff on-site at all times. During the performance of the resulting contract, the Contractor is required to comply with the conditions of the federal Occupational Safety and Health Act of 1970 (OSHA) and the standards and regulations issued thereunder. It shall be the sole responsibility of the Contractor to remain familiar with said standards and regulations and maintain their enforcement. Requirements include, but are not limited to, proper footwear, hard hats, safety eyewear, hearing protection, gloves, vests, etc. Ordering and Schedule Services will be coordinated between the Contractor and HAWC by work order. Work orders will be emailed to the Contractor and will include: The service(s) requested Paint pattern (Section 18 or Public Housing) Jobsite address. Contact information for approved HAWC representative Contact information for scheduling work Any relevant information necessary to complete the work requested. Contractor may be responsible for contacting tenants for scheduling work at occupied units. The Contractor shall communicate with HAWC all site visits to verify site conditions and clarify the specific scope of work. The Contractor may be required to submit a detailed estimate of labor hours to perform the prescribed work. The estimate must be presented in a timely manner to facilitate prompt review and approval. The Contractor, in collaboration with HAWC, shall provide written communication for access and to notify of any necessary preparations to tenants of occupied units prior to work. The Contractor will complete all requested work within 30 calendar days of approval unless other arrangements are made in writing. Work hours will be confined between 8:00 am to 7:00 pm, Monday through Sunday. Additional materials markup, for materials not defined in section 3.1, not to exceed 15% markup. Scope of Work Services under this contract will include the tasks listed under this scope of work. Drywall The Contractor shall provide drywall repairs and improvements on residential properties. Repairs will typically consist of patching damaged gypsum wallboard ceilings and/or walls to match existing texture, paint sheen and color. Contractor shall provide all labor, materials, equipment, and supervision to perform the necessary work. The Contractor agrees to do all work in accordance with the plans, specifications, and performance standards and in accordance with good building practice, any and all municipal codes, and to the satisfaction of HAWC. All drywall must be mold-resistant. All drywall installed at the interior of the house shall be 1/2” or 5/8” per local code requirement s. All drywall shall be nailed and screwed with a full nailing pattern and finished in accordance with the manufacturer’s recommendations. This shall apply to both ceiling and wall installation. Maximum nail spacing at ends (edges in vertical application) within the nailing field shall be screwed or nailed with one (1) nail space 6 inches on center at each support. Minimum nail edge distance shall be 3/8”. This shall apply to both ceiling and wall installation. Drywall shims shall be used only where necessary. Openings cut for outlets, switches, etc., shall be of a tolerance that can be covered adequately with normal switch plates and covers without additional taping or caulking. Drywall shall not be installed without proper backing. All nailing should comply with all county, state, city and manufacturer’s specifications. All exterior corners on drywall shall be covered with non-corrosive metal corner bead and covered with an acceptable installation of joint compound. All corner beads shall be fastened per manufacturer specifications (Max 8” spacing). All interior corners greater than 90 degrees will have flex bead installed. Drywall and metal corner beads shall extend to the concrete and plywood subfloor of all drywalled door openings that receive bi-fold or bypass doors. All other drywall shall extend from the ceiling to within 1/2” of the floor. Drywall shall finish tight to window frames. Ceiling board shall be installed prior to wall board. Joint compound and tape should conform to ASTM Treatment Materials for Gypsum Wallboard. Drywall shall be hung with long dimensions of the board at right angles to the framing. Corner beads shall be used on all corners. The appropriate beads shall be used on all vault and tray ceilings. All metal to be level and plumb. Out-of-alignment vault or tray lines are unacceptable and must be repaired at the Contractor’s expense. All nails in or damage to plumbing pipes or electrical wiring are the responsibility of Contractor. A minimum of three coats of joint compound are required: an embedding coat to bond the tape and two finishing coats over the tape. Each coat must be thoroughly dry before the next is applied to ensure that the surface incurs maximum shrinkage and can be readily sanded. The finished drywall should present a smooth, unblemished, homogeneous appearance with inconspicuous joining between boards and no visible fasteners. There should be no areas of raised fibers due to over-sanding. Clearly visible nail pops, seam lines and cracks are considered unacceptable. No scaffold or ladders to be set in any tub. Contractor shall use extreme caution while working around bathtubs and shower pans and will be held liable for any damage incurred. Contractor shall replace insulation fallen prior to drywall, and notify HAWC agent of lack of any insulation, prior to drywall installation. Contractor shall be responsible for walls covered without insulation and/or insulation inspection. Ceilings will be finished with knockdown texture. Ceiling coverage shall be uniform with no thin or missed spots and must be uniform from wall to wall and room to room. There should be no areas of raised fibers due to over-sanding. Wallboard Patching: Side-to-side punctures in drywall and any damage over half an inch will be patched using professional joint compound. For holes over (1) one inch in diameter: Holes must be repaired by cutting out the damaged area and placing a new piece of drywall that matches existing drywall thickness. Backer board must be installed for proper fastening. Backer must be 4 inches larger than the height of the hole. Drywall screws must be positioned at least an inch from the edges to avoid splitting or crumbling the drywall. Screws must sink slightly below the surface of the drywall. Drywall tape must run around the edges of the patch centering the tape on the seams. Three coats of joint compound are required: an embedding coat to bond the tape and two finishing coats over the tape. Each coat must be thoroughly dry before the next is applied to ensure that the surface incurs maximum shrinkage and can be readily sanded. Contractor will match surrounding texture to a professional standard. Contractor will paint patched area. Please see product specifications provided in this document for paint. The finished drywall should present a smooth, unblemished, homogeneous appearance with inconspicuous joints between boards and no visible fasteners. There should be no areas of raised fibers due to over-sanding. Clearly visible nail pops, seam lines and cracks are considered unacceptable. Contractor shall not use adhesive mesh patches or “California” style patches with no backing. Contractor shall clean up, remove, and dispose of all debris associated with this work. The jobsite shall be broom-swept every day at the end of the shift and before job is considered complete. Permits: If the work being performed requires a permit, the Contractor will apply for and obtain the appropriate permits and coordinate jurisdictional inspections. Painting Contractor will provide as-needed residential interior painting. Painting services will in Paint Specifications Paint Specifications Section 18 Units PH Units Sherwin-Williams or equal Walls: Dumpling SW 9616 Ceiling and Trim: Off White Sheen: Eggshell Rodda or equal Walls and Ceilings: Winter Wheat Sheen: Eggshell Cabinets Doors, Doors Casings and Baseboard Trim White Off White Tub and Shower Surround Two-Component Acrylic Urethane in White Wage Determinations Wage Determination: HUD-determined The contractor is required to pay wages as determined or adopted by HUD for all workers employed under contracts in excess of $2,000 (wage rates are detailed on form HUD-52158). It is the Contractor’s responsibility to review the wage rates and request additional classifications or updated rate sheets from HAWC as needed. The contractor is not required to submit payroll reports. Contractors and subcontractors are required to maintain payroll records and must make such records available to HAWC upon request. The Contractor and subcontractors are responsible, on no less than a semimonthly basis, for paying not less than the applicable wage rates to all maintenance laborers and mechanics in their employ and engaged in work under this contract. The contractor is responsible for its own full compliance, and for the full compliance of any/all subcontractors, with all wage, overtime and record keeping requirements included in this contract. HUD has determined that a Record of Employee Interview (Wage Interview) must be completed by a “representative sample” of workers for each contract. HAWC staff will interview your employees while on our job site and ask them questions regarding their names, job duties, and pay. It is a federal requirement that these interviews be completed and documented on form HUD-11. All wage rules and requirements must be cascaded down to all subcontractors through contractually binding agreements. Misclassification of Employees as Independent Contractors: Per the United States Department of Labor Requirements, as detailed in Administrator’s Interpretation No. 2015-1, when using Federal Funds, it is necessary to assure all employees are classified correctly and paid accordingly. To ensure correct classifications, wages and tax revenues are paid and reported any documentation submitted to HAWC indicating or suspected to indicate an Independent Contractor or Contractor using an IRS1099 Form shall be further investigated by HAWC. It shall be the burden of the Contractor to provide any documentation requested by HAWC. For more information on the Misclassification of Employees as Independent Contractors please visit: www.dol.gov/whd/workers/misclassification/ Quality Assurance Upon job completion, HAWC will inspect to verify work was completed and meets the agreed standards as outlined in this contract. If the property does not meet the standards as agreed upon in this contract, HAWC will contact the contractor to return to rectify any deficiencies. If the contractor is unable to return within 72 hours, HAWC may correct the deficiencies and deduct accrued expenses from payments. All work and materials shall be subject to a final inspection and approval by HAWC. If any defective work or material is found during inspection, the Contractor shall repair or replace at no additional charge. The Contractor warrants all furnished materials and equipment will be of good quality and new unless otherwise required and approved. Work will be free from defects and will conform with the requirements of the contract documents, safety requirements, and safety standards. Work not conforming to these requirements, including substitutions not properly approved or authorized may be deemed defective. If any work is subject to be tested or approved by local jurisdiction, contract documents, or by regulation; the Contractor shall provide HAWC timely notice of its readiness for inspection. If any such work is covered without approval or consent it must, if required by the Contract Administrator or other authorities, be uncovered for examination at Contractor’s expense. Payment Terms Any price adjustments, whether increases or decreases, must be communicated and approved by the contract administrator. For increases, evidence of manufacturer price shifts or labor upsurges may be requested. All invoices must contain the following information: Work order number for the requested services Service Address Date(s) of service Description of services and materials provided. The Contractor shall email all invoices and supporting documentation no later than 15 days after the work is completed to: Housing_Accounting@washingtoncountyor.gov Payment will be issued within 30 days of approval by the Contract Administrator. The County may, at its discretion, withhold payment of the final invoice until all close-out requirements have been met in accordance with work specifications. Bid Table Instructions and Awarding Pricing Requirements Bidders must provide a unit price for each of the line items identified in the Bid Table. Failure to provide pricing for all line items will result in the bid being deemed non-responsive. Evaluation Method For evaluation purposes, the County will calculate an Average Cost for each bidder. The Average Cost will be determined by summing the total cost submitted for all line items and dividing the total number of lines. Contractors will enter the unit cost, which will calculate the total cost by multiplying the unit cost to the quantity. All total costs are added together, regardless of unit of measure, and divided by the number of lines. An example has been provided in NOTICES. An example of the calculation is as follows: Average Total Cost = (Line Item 1 Total Cost + Line Item 2 Total Cost + Line Item 3 Total Cost + Line Item 4 Total Cost + Line Item 5 Total Cost) ÷ 5 Bids will be ranked based on the calculated Average Total Cost, with the lowest Average Cost receiving the highest ranking, subject to a determination that the bidder is responsive and responsible. Introduction Summary Background Contact Information Timeline Legal Advertisement WASHINGTON COUNTY, OREGON INVITATION TO BID No. 2026.100-ITB Residential Interior Painting for the Housing Authority of Washington County (HAWC) The Invitation to Bid (“ITB”) documents will be available at www.WashCoPurch.com/biz Bidders are responsible for checking the site for any addenda to the ITB documents before submitting their bids to the site. Bid are due no later than 2:00 pm on Thursday, December 3, 2026 late bids are unable to be entered. The estimated expense for this contract will be $250,000 Bids must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120(1)(b). Confirmation that bidder will comply with the statement in the bid document regarding compliance with the requirement to pay wages as determined or adopted by HUD for all workers employed under contracts in excess of $2,000 (wage rates are detailed on form HUD-52158). The County may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the County it is in the public interest to do so. Washington County reserves the right to reject any and all bids and to waive any and all informalities in the best interest of the County. Bid
Published attachments
- SAMPLE HUD FORM OF CONTRACT
- General Conditions for Non-Construction Doc 1
- Insurance Requirements
- HUD-5370-C Section II
- HUD Determined Wages 25-27
- Mandatory Contract Clauses
- Record of Employee Interview
- Section 3 Clause 2026 pdf
- Residential_Interior_Painting_for_the_Housing_Authority_of_Washington_County_(HAWC)_(Addendum_#6_Revision).pdf
Addenda and notices
Addendum #1 · 1
Removed duplicate pricing information bullet points D, E & F from Scope of Work section 3.1.A. Updated unit of measure in pricing table lines 1-5 to "EA" Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #1: Prebid Attendees · 1
An informational non-mandatory pre-bid walkthrough was held on November 12, 2026 at 1:00pm. A list of attendees is attached.
Addendum #2 · 2
Added informational non-mandatory pre-bid walk through. Extended date for question submission deadline from November 10, 2026 to November 17, 2026. Extended bid submission deadline from November 12, 2026 to November 19, 2026 Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #2: Pricing Table Example · 2
For clarification on the pricing table; contractors are to enter the Unit Cost only. (Highlighted in Yellow). For the evaluation Washington County will be using the columns titled "Total" in order to calculate the average. The total column is the unit cost (that contractors entered) multiplied by the Quantity column. A provided example is attached, in which quantities are used for visual purposes only and were entered at random. The totals of all 17 lines will be added together and divided by 17. Total of all 17 lines: $7,500 Divided by 17 equals: $441.176 $441.18 is the average cost.
Addendum #3 · 3
Updated 3.1 to include lead certification requirement. 3.8: bid table instructions for further clarification on calculating total average cost. Updated attachment A to the most recent HUD contract sample. Added attachment D: HUD-5370-C section II Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4 · 4
Bid submission due date has been extended to Tuesday, November 24th 2026 at 2:00pm Please use the See What Changed link to view all the changes made by this addendum.
Addendum #5 · 5
Extending bid submission due date to Thursday, December 3rd, 2026 at 2:00pm due to Holiday and needing more time to answer contractor questions. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #6 · 6
Attachment B - HUD Forms and General Maintenance has been updated and broken down into multiple attachments. Section 3 clause has been added. Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
B p 1 says HUD-5370-C Section II applies to maintenance above $2,000 through $250,000, and I plus II above $250,000. Section II is absent from the supplied bundle. Please supply the applicable Section II and identify the controlling federal clause set and final contract attachment mapping for this award. A pp 1–2 also leave the project work/payment schedule and incorporation fields incomplete.
HUD 5370-C Section II has been added as attachment D
Which HUD classifications apply to cabinet refinishing, tub/surround refinishing and mixed painting/drywall/taping duties? What is the procedure for additional classifications, fringe-credit treatment and updated rates after the supplied June 30, 2027 expiration? How do required wage changes interact with the labor-upswing and manufacturer-only price-adjustment language? B p 12; ITB pp 15–16 and 30–31.
The necessary classifications are found in the form HUD 52158 attached in this solicitation. The vendor will select the classification that better resembles the tasks listed in the scope of work. The procedure for additional classifications is an internal practice. An updated HUD 52158 form will be submitted to HAWC prior to the expiration date, if the associated wage changes, we will contact you with instructions on how to proceed about it. The same applies for any future pricing-related interactions.
Which occupied/older building types may be assigned? Who provides lead/asbestos surveys, abatement/clearance, tenant exclusion/access and cure arrangements? Confirm lead-safe evidence required before bid versus each work order, general permit allocation, after-hours assignments and any separately allowed charge. ITB pp 6–8, 10–14, 24 and 32–33; B p 25.
Building types include single-family homes and multi-family complexes. Lead and asbestos abatement will be handled by a separate vendor on an as-needed basis. There will be no after-hours assignments.
Does the secured-facility clause apply to these residential assignments? Specify required persons, background/fingerprint process, drug/alcohol-program evidence, provider, payer and turnaround, without requesting personal histories at this stage. ITB pp 28 and 33.
Our units do not require special access controls or security clearances. All access will be coordinated with a HAWC representative. Vendor must follow safety protocols typical for the industry.
Confirm bid-time versus post-award forms, current income limits/benchmarks, the accepted hiring-plan form (S3-6 is referenced but S3-4 is included), and applicable Oregon fields where S3-5 retains California prompts. The supplied instructions require a plan within 10 days after award and S3-2 for each new hire/trainee. Is the optional business-concern self-certification separate from the required compliance plan? B pp 16–26; ITB p 37.
Section 3 Compliance and Hiring Plan are post-award requirements. The Section 3 Business Concern Self-Certification is separate from the Section 3 Compliance Plan and does not replace any required compliance-plan. limits/benchmarks have been updated. The California references have been removed.
Dear Ms. Howard, Good day. PRO PEACE LLC is a New Jersey-based, SAM.gov-registered small business specializing in government contracting, general supply, and subcontractor-coordinated services. We are interested in participating in the Housing Authority of Washington County's solicitation for interior painting, cabinet painting, tub surround painting, and drywall repair services, published October 30, 2026. We respectfully request clarification on the following: May an out-of-state company participate as the prime contractor while utilizing qualified, locally licensed Oregon subcontractors? Must the prime contractor independently hold an Oregon Construction Contractors Board license, or are there specific licensing arrangements permitted under this solicitation? What are the minimum past-performance and experience requirements? Are there specific insurance, bonding, or certification requirements? Is pricing based on unit rates, individual work orders, or a fixed annual contract amount? Could you please direct us to the complete solicitation package, including the scope of work, pricing schedule, and mandatory submission forms? Thank you for your assistance, and we look forward to evaluating this opportunity. Sincerely, Olu Adetule PRO PEACE LLC 11 Dundar Road, Suite 212 Springfield, NJ 07081 Phone: 973-978-1100 Email: propeacellc@gmail.com Website: www.propeacellc.com UEI: RCEALM35CXX7 CAGE: 25SL7
We require the prime contractor to have an Oregon CCB for this scope of work, even if they are out of state. They must also be registered with the State of Oregon business registry. Insurance / bonding / certification requirements / pricing / work order requirements and the full solicitation package can be found here: https://procurement.opengov.com/portal/washington-county-or/projects/320566
Are bid security, performance bonds and payment bonds required here? If so, specify amounts/percentages, forms and due stage. Which execution deadline controls: 15 business days from prepared-contract receipt or 10 calendar days excluding Sundays from award notice? ITB pp 21, 24 and 35.
Bonds are not required for this solicitation
Does the 15-day or 30-day post-completion invoice deadline apply? Confirm required approval/closeout documentation, any retainage/withholding, and the final work/payment attachment. Payment appears due 30 days after administrator approval, not simple receipt. ITB pp 16 and 31; A pp 1–2.
Washington County will issue your payment within 30 days of receiving your invoice. Vendors will submit invoices once the job has been approved by a HAWC representative. HAWC may withhold the payment if the job does not comply with the standards set in the scope of work.
How should included travel/truck/staging and hourly language be reconciled with separate line 6 and the unit-price tables? Does unit `1` mean each complete scheduled apartment? Is one unweighted average of all 12 submitted unit prices used, despite mixed units and the five-line example; do displayed quantities affect scoring? Define cabinet square footage, door sides/trim coverage and one tub/surround unit. ITB pp 6, 12, 16–19 and 24.
Lines 1-5 are to be the cost all-inclusive for scheduled interior painting to houses of the listed sizes. The unit of measure has been corrected to "EA" via addendum #1; signifying the price per unit. For example, line 5 has an estimated 20 units to be completed during the contract period; we are asking for a per unit cost. These quantities are for bidding purposes only and not a true depiction of the amount of work to be awarded. The separate line 6 is the cost of mobilization for any type of on-call work regardless of the size or qty of units. All lines are added together, with quantities taken into account, and averaged regardless of unit of measure. Square footage can be defined as the addition of all the surface lengths. Cabinet work includes painting inside the cabinets.
What qualifies as similar local-government work, and is relevant owner/predecessor or State-agency experience accepted? Confirm evidence and timing for the apparent-low-bidder response, without assuming a waiver of the three-consecutive-year requirement. ITB p 32.
See ORS 279C.375 for detailed information on bidder responsibility requirements.
We are a refinishing contractor, and all we do is showers/countertops refinishing and cabinet refinishing/refacing. We don't do general paint and drywall work. Is there an opportunity to bid only on a scope that's relevant to what we do?
No, the selected vendor should be able to perform all tasks listed in the scope of work and all lines must have a price in order to be seen as responsive.
Scheduled Interior Painting line items 1–5, please confirm whether the all-inclusive unit pricing is intended to cover painting all interior walls, ceilings, doors, door casings, and baseboards. Alternatively, are these prices intended for wall painting only, with ceilings, doors, and trim authorized separately as needed? Please also confirm whether scheduled painting generally involves vacant units between tenants or may include occupied units.
Pricing for items 1-5 only include walls and ceilings. The doors, door casings, baseboards and other painting tasks are a separate charge.
Since the Lead and asbestos abatement will be handled by a separate contractor, is my company required to be lead certified at the time of bidding?
Lead Certification is not a requirement. **Revised answer as of 11/18/2025: After further review the County has decided to require lead certification due to the County owning (some) houses which date prior to 1978. An addendum has been issued to notify all project followers and potential bidders.
For scheduled interior painting under bid line items 1–5, are contractors expected to price painting of vacant, unoccupied units between tenants, or must the fixed unit prices also accommodate occupied units? If occupied units are included, please clarify whether additional compensation will be available for the increased preparation, protection, furniture movement, and coordination required when residents and personal belongings remain in the unit.
Prices must include occupied units, however, painting in occupied units is extremely rare. The vendor will not be tasked with anything that is not already stated in the scope of work. Tenants will be responsible for coordinating, and seeing that their belongings are removed from the work areas.
The County's November 9 response clarified that scheduled interior painting under bid line items 1–5 includes walls and ceilings, while doors, door casings, baseboards, and other painting tasks are charged separately. Please confirm whether the walls and ceilings inside closets, including bedroom closets, linen closets, pantries, and other enclosed storage areas, are included in the fixed unit prices for scheduled interior painting.
All wall surfaces are included in the fixed-unit prices. This includes closets, storages, and pantries.
For scheduled interior painting under bid line items 1–5, does HAWC require a minimum of two finish coats on all walls and ceilings, or may the contractor apply one finish coat where the existing coating is sound and the new coating achieves complete coverage, uniform color, and the specified finish? Please also confirm whether spot priming is acceptable for routine preparation or whether full-surface priming is required under any standard circumstances.
Spot priming is acceptable. One coat is acceptable as long as the finish is uniform. For painting unusually damaged areas, additional charges must be pre-approved by the HAWC.
The Pricing Proposal states that scheduled interior painting under bid line items 1–5 includes spackling and minor drywall repairs, while significant drywall repairs may be charged separately with prior approval. Please define the extent of drywall repair that must be included in each fixed unit price. Is there a maximum repair size, number of repairs per unit, or labor-hour allowance that distinguishes minor repairs from significant repairs? Please also confirm whether repairs requiring drywall replacement, backing, taping, multiple coats of joint compound, and texture matching qualify for separate compensation.
Spackling and minor repairs refer to small and shallow holes under 1-inch in diameter. For any wall repair requiring backing or several coast of mud, the on-call price can be applied. This will require prior HAWC approval.
Section 7.8 identifies an estimated contract expenditure of approximately $250,000 and provides for an initial one-year contract with renewal options for a maximum term of five years. Please confirm whether the $250,000 estimated expenditure represents the anticipated value of the initial one-year contract, an annual spending estimate, or the estimated total expenditure over the potential five-year contract term. Please also confirm whether HAWC anticipates awarding the contract to one contractor or multiple contractors.
Only one contractor will be selected. $250,000 is limit over a potential 5-year contract. It is not a guarantee or an estimation of the expenditure.
Bid line items 7 and 8 request unit prices per square foot for on-call painting and sheetrock repairs, including preparation, texture, and painting. Please clarify how billable square footage will be determined for these services. For example, for a small drywall hole requiring a larger surrounding area to be patched, textured, and painted, will the contractor be compensated based on the original damaged area, the repaired area, or the total finished surface area? Additionally, will HAWC establish a minimum billable quantity or minimum service charge for small repairs, separate from the mobilization charge identified in line item 6?
Billing per square foot applies when the repair requires extensive preparation such as backing, or when spackling is not an option, such a 3-inch hole and bigger.
The County's November 3 response clarified that cabinet painting under bid line item 10 includes painting the interiors of cabinets. However, the bid schedule requests pricing per square foot without specifying the measurement method. Please confirm whether cabinet square footage is calculated using the exterior face dimensions of the cabinet assembly or the total actual surface area to be painted, including both sides of doors, drawer fronts, cabinet frames, interior walls, shelves, and other exposed surfaces. Please provide a representative example of how HAWC would measure and compensate the painting of a standard kitchen base cabinet and wall cabinet.
The price per square foot for painting cabinetry must include height, width, and depth. It is up to the vendor to creatively determine a fixed price per square foot.
Bid line item 12 requests a fixed price per tub and shower surround. Section 3.3 describes refinishing the tub and shower surfaces using a compatible coating system, while Section 3.4 specifies a two-component acrylic urethane finish. Please confirm whether the fixed unit price must include refinishing the bathtub basin itself in addition to the surrounding walls, or whether the scope is limited to the tub/shower wall surround. Please also identify the typical substrates (fiberglass, acrylic, ceramic tile, or other materials) and approximate dimensions contractors should assume when developing the fixed unit price. Will unusually large surrounds or substantially damaged surfaces qualify for separate pricing?
Price includes tub basin and surround. Price it for 5 foot wide and 36-inch deep tubs. We do not refinish non-fiberglass surrounds such as tile. We do not own properties with acrylic surrounds.
The attached HUD-52158 maintenance wage determination expires June 30, 2027, while the proposed contract may extend for up to five years. Section 7.23 also establishes limitations on price adjustments, including a 180-day firm-price period and provisions primarily addressing manufacturer price changes. Please clarify whether contractors may request adjustments to their unit prices at annual contract renewals to account for changes in HUD-required wages and fringe benefits, employee labor costs, insurance, and material costs. If HUD issues a new wage determination during an active contract year that increases mandatory labor costs, will HAWC permit corresponding adjustments to the contracted unit prices, and what approval process will apply?
The HAWC will authorize price adjustments if the wage determination increases. Typically, you can also increase your prices once your contract has reached maturity after one year of being active upon HAWC approval.
The scheduled interior painting bid table identifies five apartment configurations by bedroom count, bathroom count, and approximate floor area. However, the documents do not provide floor plans, ceiling heights, or representative interior conditions. Can HAWC provide sample floor plans, photographs, or representative measurements for each unit configuration to assist contractors in calculating paintable wall and ceiling areas? If this information is unavailable, please confirm the standard ceiling height and whether contractors should assume conventional flat ceilings and typical residential interior configurations when preparing their fixed unit prices.
Floor plans are unavailable. 90 percent of our properties have 8 feet high, flat ceilings. Additional charges for vaulted ceilings may be approved on a, as-needed basis.
Section 3.3 requires the contractor to protect tenant belongings during painting operations. For work performed in occupied residential units, please clarify whether HAWC or the tenant is responsible for moving furniture, appliances, wall decorations, and personal belongings away from surfaces scheduled for painting before the contractor arrives. If the contractor is expected to move and replace these items, should that labor be included in the scheduled unit prices, or will it be separately authorized and compensated?
Tenants will be required to make sure their belongings are out of the work areas. The contractor is not required to move furniture or wall decorations. Contractors may charge for moving appliances upon HAWC approval. Painting in occupied units accounts for less than 1 percent of the total work assignments.
Section 3.2 provides for work assignments through individual work orders, with completion generally required within 30 calendar days after approval. Please clarify the typical advance notice contractors can expect between receipt of an approved work order and the requested start date. When multiple units at the same apartment community require painting, will HAWC generally coordinate those units for consecutive or concurrent completion, or should contractors assume that each work order may require a separate mobilization? Please also confirm whether HAWC anticipates a minimum or maximum number of work orders that may be assigned simultaneously.
There is no notice for work orders. Each work order requires separate mobilization. There is no maximum number of work orders that may be assigned simultaneously.
Section 3.2 requires completion of approved work within 30 calendar days unless alternative arrangements are approved in writing. Please confirm whether the completion deadline may be extended without penalty when work is delayed by circumstances outside the contractor's control, including unavailable tenant access, incomplete tenant preparations, lead or asbestos abatement by another vendor, or other prerequisite work that prevents painting from proceeding. What notification and documentation must the contractor provide to obtain an extension under these circumstances?
Yes it may be extended without penalty when it is outside of contractor's control / at no fault of the contractor. The expectation is that clear communication be maintained between the Contractor and Contract Administrator to disclose any obstacles or delays that may arise. This is preferred to be handled via email, or other previously agreed form of communication, including requests for extensions.
Section 3.6 and Section 7.16 require contractors to correct defective workmanship and materials, but the solicitation does not specify a defined warranty period. Please confirm the required workmanship warranty duration for standard interior painting, cabinet refinishing, drywall repairs, and tub/shower refinishing. Are contractors expected to provide the same warranty period for all services, or will different warranty requirements apply based on the coating system or type of work performed? Please also clarify whether normal wear, tenant-caused damage, moisture intrusion, and failure of previously existing coatings are excluded from the contractor's workmanship warranty.
Correcting defective workmanship does not refer to a warranty. If a job is determined to be defective, payment will not be processed until the corrections are made. Additional charges for extra coatings may be approved by the HAWC. Moisture intrusion will be handled by a separate vendor.
In response to a previous bidder's question, HAWC stated on November 9, 2026, that lead certification is not required for this solicitation. However, Oregon Construction Contractors Board (CCB) requirements generally require contractors performing renovation, repair, or painting work that disturbs painted surfaces in pre-1978 residential housing to hold the appropriate lead-based paint renovation certification. To ensure that bidders meet all applicable licensing requirements, please confirm whether all residential properties that may be assigned under this contract were constructed in 1978 or later. If any properties were constructed before 1978, please clarify how HAWC intends to address the applicable lead-safe renovation certification requirements, even when lead or asbestos abatement is performed by a separate contractor. Specifically, will pre-1978 properties be excluded from work orders issued to contractors without the required lead certification, or must bidders possess the appropriate certification to be eligible for the contract?
After further review the County has decided to require lead certification due to the County owning (some) houses which date prior to 1978. An addendum has been issued to notify all project followers and potential bidders.
To assist bidders in developing accurate unit pricing for ITB No. 2026.100-ITB, can HAWC provide historical annual quantities of completed painting and repair work orders, preferably for the past 12–24 months? If available, please provide the approximate number of scheduled apartment repaints by unit size and the number of on-call assignments for painting, drywall repairs, doors, cabinets, baseboards, and tub/shower refinishing. Please also indicate the approximate percentage of scheduled painting work performed in vacant versus occupied units.
Our current vendor has painted 15 units this year. 8 are 3 bed 2 bath. 7 are 2 bed 1 bath All vacant units. 5 have included cabinet painting and interior doors.
Section 3.8 of ITB No. 2026.100-ITB states that bids will be evaluated by summing the unit prices for all line items and dividing by the number of lines. However, the County's November 3 response to a previous question states that quantities will be taken into account when calculating the average. Please confirm the exact mathematical formula the County will use to rank bids. Specifically, will each unit price be multiplied by its estimated quantity before calculating the average? If so, will the denominator be the total estimated quantity (87) or the number of bid lines (12)? Will an addendum be issued to reconcile the evaluation method described in Section 3.8?
Yes, each unit price will be multiplied by it's estimated QTY before calculating the average. Each line total will have it's total price, no matter what the unit of measure is. All line total prices will be added together and divided by the number of lines to come up with the total average price. Lowest total average price will be used to determined the low bidder. An example has been posted in Notices
For the Pricing Proposal, please confirm that the Unit Cost column represents the price for one unit of measurement, and that the Total column represents Unit Cost multiplied by Quantity. For example, Bid Item 4 lists five 3-bedroom/1-bathroom apartments. Using a hypothetical unit price of $100 per apartment solely for illustration, should the Unit Cost be entered as $100 and the Total as $500? Alternatively, if a bidder enters $100 as the total for all five apartments, would HAWC interpret that as a unit price of $20 per apartment? Please also clarify whether bid evaluation uses the extended totals (Unit Cost × Quantity) and how the County handles bids where the entered unit cost and extended total are inconsistent.
Unit cost is the cost for one unit. The system will automatically calculate the extended total for you, which is the unit cost X the QTY. For your example, if you were to enter $100 as the unit cost, and the QTY is 5 then it gives $500 as the extended total. The evaluation is using the extended totals only. An example has been posted in Notices.
For a CCB-licensed construction LLC whose working members qualify as nonsubject workers under ORS 656.027(25), what current form and supporting documentation will HAWC accept instead of a workers’ compensation certificate, and at what stage is it due? Please identify the County Counsel review process, if required, and provide the current form.
In these cases, an exemption form will be used at the time of contract execution.
For line 8, is billable area the damaged opening, the repair patch, or the entire area prepared and painted? Is there a minimum billable area? Please also clarify treatment of shallow holes between one and three inches.
The charges per square footage applies for damage that cannot be repaired by conventional spackling. If a hole is bigger than 3 inches, it will require new backing, drywall, texture and painting. and it can be charged per square foot. These repairs must be approved by a HWAC representative.