Retamal Dam Buoy System

SolicitationNo Set AsideActive

Key Takeaways

  • Set-aside for No Set Aside businesses
  • Work to be performed in El Paso, TX
  • Industry: Other Heavy and Civil Engineering Construction

Contract Details

Notice ID
191BWC26R0006
Opportunity Type
Solicitation
Sub-Agency
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Office
INTERNAT. BOUNDARY AND WATER COMM.
Posted Date
Thursday, August 13, 2026
Response Deadline
Wednesday, September 9, 2026
PSC Code
2050
Set-Aside
No Set Aside
Place of Performance
El Paso, TX, 79902
Status
Active

Description

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the complete the Design-Build of Retamal Dam Buoy System. Upon conclusion of the project, the new waterway barrier line will prevent public access to dangerous hydraulics upstream/downstream of the dam, the warning system and signage will alert the public of the danger ahead providing a waterway barrier line to include anchors, alert system, and warning signs at the Retamal Dam. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing. The working hours of the USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractor

Why This Opportunity Matters

INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO is actively seeking qualified contractors for other heavy and civil engineering construction with a set-aside for No Set Aside businesses in El Paso, TX. This set-aside designation means eligible businesses face reduced competition from larger firms.