1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: 1.1.1 Phase A: Site Investigation and Analysis 1.1.2 Phase B: Design and Construction Document Preparation 1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. 1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed. 1. Disclosure of the Magnitud
AGRICULTURE, DEPARTMENT OF is actively seeking qualified contractors for highway, street, and bridge construction with a set-aside for Small Business businesses in ALBUQUERQUE, NM. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts