Santa Fe Regional Airport, Airport Certification Manual, Airport Emergency Plan, and Snow and Ice Control Plan Rewrite
Description
The purpose of the RFP is to solicit sealed proposals to establish a contract through competitive negotiations for the procurement of: The Santa Fe Regional Airport (SAF) is seeking qualified and experienced vendors to develop and produce a complete and comprehensive Airport Certification Manual (ACM), Airport Emergency Plan (AEP), and Snow and Ice Control Plan (SCIP). The selected vendor shall also develop a complete and derivative Snow and Ice Control Plan (SICP) and Airport Emergency Plans (AEP) that is consistent for current classification, certificate limitations, exemptions, and any further applicable requirements for FAA-certificated Part 139 airports. The purpose of this project is to develop a new, comprehensive, accurate, and operationally functional ACM that reflects the current operations, facilities, equipment, personnel, policies, procedures, and regulatory requirements of Santa Fe Regional Airport. The consultant will be responsible for verification that the completed ACM is designed correctly for the Santa Fe Regional Airports procedural assignments and responsibilities reflecting current Airport Operations. SCOPE OF WORK This section is used by the department to provide a Detailed Scope of Work that will also be included in the Draft Contract and the resulting contract. Scope of Work The consultant shall provide the coordination, document development, and project management necessary to complete all three documents. This effort shall include: Conducting an initial review and gap analysis of existing Airport documents, procedures, and applicable FAA requirements. Conducting onsite meetings and interviews with Airport Operations, Airport Maintenance, Aircraft Rescue and Firefighting (ARFF), and other applicable Airport personnel to understand existing operational practices and capabilities. Coordinating with Airport departments, tenants, outside agencies, and other applicable stakeholders throughout the development process. Facilitating document review periods, stakeholder meetings, and coordination necessary to obtain and incorporate applicable comments. Maintaining communication with the Airport regarding project progress, outstanding information, coordination needs, and anticipated completion dates. Coordinating with the FAA throughout the development process and addressing applicable FAA comments and requested revisions. Providing final documents in professionally formatted, editable electronic format and PDF. Providing final revisions and incorporating applicable Airport and stakeholder comments prior to acceptance. Airport Certification Manual (ACM) The consultant shall develop a complete and comprehensive ACM incorporating all applicable requirements under 14 CFR Part 139 and applicable FAA guidance. The ACM shall accurately reflect the Airport's current operations, procedures, responsibilities, and certification programs, including but not limited to: Airport operational responsibility, succession, and assigned duties. Movement areas, safety areas, pavement, markings, signage, and lighting. Training, records, self-inspections, and airport condition reporting. Aircraft rescue and firefighting (ARFF) facilities, equipment, staffing, and procedures. Fueling and hazardous materials, vehicle and pedestrian controls, and obstruction management. Wildlife hazard management, public protection, construction and unserviceable areas, and navigational aid protection. Applicable emergency planning requirements and references to the Airport Emergency Plan. Snow and Ice Control Plan (SICP) The consultant shall develop a complete and comprehensive SICP reflecting the Airport's current winter operations, available equipment, staffing, responsibilities, and snow removal procedures. The SICP shall include, but not be limited to: Review and evaluation of existing snow and ice control procedures. Airport snow removal priorities and designated operational areas. Personnel responsibilities, training, and equipment requirements. Snow removal procedures for movement areas, non-movement areas, ramps, and designated priority surfaces. Snow accumulation monitoring, reporting, and airport condition assessments. Coordination with airport tenants, airlines, and other affected stakeholders. Snow disposal locations and applicable restrictions. Applicable FAA requirements and coordination with the FAA, as necessary. Airport Emergency Plan (AEP) The consultant shall perform a complete and comprehensive rewrite of the AEP. This effort shall include extensive coordination with local, state, federal, and other emergency response agencies, Airport departments, tenants, and applicable stakeholders. The consultant shall be responsible for facilitating the coordination necessary to develop an accurate, comprehensive, and operationally practical emergency plan. The AEP development shall include, but not be limited to: Review and evaluation of the existing AEP and applicable FAA requirements. Identification of participating agencies, stakeholders, and emergency response partners. Coordination and facilitation of interagency meetings to establish emergency response roles, responsibilities, and procedures. Development and revision of emergency response procedures for applicable emergency scenarios. Establishment of agency notification procedures, communication protocols, and emergency coordination responsibilities. Review of emergency response resources, equipment, airport access points, staging areas, and response capabilities. Coordination of agency reviews, comments, and revisions throughout the development process. Incorporation of agency feedback and stakeholder input into the final document. Development of procedures for emergency exercises, training, and ongoing plan maintenance. Final coordination and submission of the completed AEP to the FAA, as applicable. Deliverables The selected consultant shall provide complete, comprehensive, and professionally organized updates and rewrites of the following Airport certification and operational documents for Santa Fe Regional Airport: the ACM, SICP, and AEP. All documents shall incorporate applicable FAA requirements and accurately reflect the Airport's current operations, procedures, responsibilities, resources, and programs. INTRODUCTION PURPOSE OF THIS RFP The Santa Fe Regional Airport (SAF) is seeking qualified and experienced vendors to develop and produce a complete and comprehensive Airport Certification Manual (ACM.) for Santa Fe Regional Airport. The selected vendor shall also develop a complete and derivative Snow and Ice Control Plan (SICP) and Airport Emergency Plans (AEP) that is consistent for current classification, certificate limitations, exemptions, and any further applicable requirements for FAA-certificated Part 139 airports. The purpose of this project is to develop new, comprehensive, accurate, and operationally functional ACM that reflect s the current operations, facilities, equipment, personnel, policies, procedures, and regulatory requirements of Santa Fe Regional Airport. The consultant will be responsible for verification that the completed manual and plans are designed correctly for the Santa Fe Regional Airports procedural assignments and responsibilities reflect current Airport Operations. SCOPE OF PROCUREMENT The resulting contract will result in a Professional Services Contract with a term of one (1) year with the option to extend to two (2) years. The SAF is in need of a firm to rewrite a comprehensive ACM, AEP, and SCIP, that will be ready for full review by the Federal Aviation Administration (FAA). The current manuals and plans are outdated and require revisions to meet current FAA Advisory Circulars (14 CFR Part 139). This revision process will require communication with the SAF Operations Manager and possible onsite coordination. PROCUREMENT MANAGER Sebastian Gallegos has assigned a Procurement Manager who is responsible for the conduct of this procurement whose name, telephone number, and email address are listed below: Sebastian Gallegos, Airport Project Manager 505-695-3538 sfgallegos@santafenm.gov Any inquiries or requests regarding this procurement should be submitted via the OpenGov Procurement Portal at https://procurement.opengov.com/portal/santafenm/projects/324046 . DEFINITION OF TERMINOLOGY This section contains definitions of terms used throughout this procurement document, including appropriate abbreviations: “Addendum” means a written or electronic document issued by the City to modify, clarify, or supplement the information in the original RFP prior to the proposal due date. This may also be called Amendment or RFP Amendment. “Amended Proposal” means a revised and complete version of a proposal submitted by an Offeror prior to the proposal due date, clearly labeled as superseding the original submission. “Authorized Purchaser” means an individual authorized by Santa Fe Regional Airport to place orders against this contract. “Award” means the point at which the contract document has been fully executed. See also “Contract” and “Final Award" . “Best and Final Offer” or “BAFO” means a final revised proposal submitted by an Offeror, upon request by the City, to provide updated pricing or other proposal elements. “Business Hours” means the normal business hours of the Requesting department; 8:00 AM through 5:00 PM Mountain Standard or Daylight Time, whichever is in effect on the date given. “Central Purchasing Division” or “CPD” means the City office responsible for overseeing and managing the procurement of tangible personal property, services, and construction, including ensuring compliance with applicable procurement laws, policies, and procedures. “Chief Procurement Officer” or “CPO” means that person within the CPD who is responsible for the control of procurement of items of tangible personal property, services, or construction. “City” means the City of Santa Fe, New Mexico which in the procurement context may act through the Finance Director, City Manager, or Governing Body. City align expectations, mitigate risk, and finalize project understanding prior to contract execution.. “Confidential” means confidential financial information concerning Offeror’s organization and data that qualifies as a trade secret in accordance with the Uniform Trade Secrets Act NMSA 1978, Sections 57-3-A-1 through 57-3A-7. The following items may not be labelled as confidential: Offeror’s submitted Cost response, Staff/Personnel Resumes/Bios (excluding personal information such as personal telephone numbers and/or home addresses), and other submitted data that is not confidential financial information or that qualifies under the Uniform Trade Secrets Act. “Contract” means any agreement or Price Agreement for the procurement of items of tangible personal property, services, or construction. “Contractor” means any business having a contract with the City of Santa Fe. “Department” means the Requesting Department sponsoring this Procurement. “Determination” means the written documentation of a decision of a procurement officer including findings of fact required to support a decision. A determination becomes part of the procurement file to which it pertains. “Desirable” the terms “may,” “can,” “should,” “preferably,” or “prefers,” identify a desirable or discretionary item or factor. “Electronic Submission” means a successful submittal of Offeror’s proposal consisting of text, images or both readable on computers or other electronic devices. “Evaluation Committee” means a body appointed to perform the evaluation of Offerors’ proposals. “Evaluation Committee Report” means a report prepared by the Procurement Manager and the Evaluation Committee to support the Committee’s recommendation for contract award. It will contain scores and written evaluations of all responsive Offeror proposals. “Final Award” means the point at which the contract(s) resulting from this RFP have been fully executed through the final required signature—either by the City Manager or City Mayor, depending on the contract amount—thereby making the contract(s) legally binding. See also “Contract.” “Finalist” means an Offeror who meets all the mandatory specifications of this RFP and whose score on evaluation factors is sufficiently high to merit further consideration by the Evaluation Committee. “Hourly Rate” means the proposed fully loaded maximum hourly rates that include travel, per diem, fringe benefits and any overhead costs for contractor personnel, as well as subcontractor personnel if appropriate. “Living Wage” means the minimum hourly wage established by the City of Santa Fe’s Living Wage Ordinance, which contractors must comply with, as posted at https://santafenm.gov/economic-development/business-resources/living-wage-information . “Mandatory” the terms “must,” “shall,” “will,” “is required,” or “are required,” identify a mandatory item or factor. Failure to meet a mandatory item or factor may result in the rejection of the Offeror’s proposal. “Minor Irregularities” means anything in the proposal that does not affect the price, quality and/or quantity, or any other mandatory requirement. “Offeror” means any person, corporation, or partnership who chooses to submit a proposal. “OpenGov” means the City of Santa Fe’s official electronic procurement platform used to post solicitations, receive vendor proposals, facilitate communication with Offerors, and manage procurement activities in a transparent, streamlined, and auditable manner. “Procurement Manager” or “PM” means any person authorized by both the CPD and the Requesting Department to facilitate the procurement process and/or administer the resulting contract(s). The Procurement Manager is re PROCUREMENT LIBRARY A procurement library has been established. Offerors are encouraged to review the material contained in the Procurement Library by viewing the attachment section of the solicitation. The library contains information listed below: Electronic version of RFP, Questions & Answers, RFP Amendments, etc. https://procurement.opengov.com/portal/santafenm/projects/324046 CONDITIONS GOVERNING THE PROCUREMENT This section of the RFP contains the schedule of events, the descriptions of each event, and the conditions governing this procurement. TIMELINE The CPD and the Procurement Manager will make every effort to adhere to the following schedule: Issue RFP: November 20, 2026 Deadline for Written Questions: November 25, 2026, 5:00pm Response to Written Questions: November 26, 2026, 5:00pm Proposals Due Date: December 4, 2026, 3:00pm Evaluation*: December 7, 2026, 10:00am Best and Final Offers*: December 14, 2026, 3:00pm Finalize Contracts*: December 16, 2026 Contract Award*: January 29, 2027 *Dates indicated after "Proposals Due Date" are estimates only and may be subject to change without necessitating an amendment to the RFP. Explanation of Events The following paragraphs describe the activities listed in the Timeline/Sequence of Events. The City reserves the right to: Change or extend the Proposals Due Date. Revise the RFP before the due date. The city will process addenda if it is determined that modifications, clarifications, or additions to the RFP are necessary. Similar to the initial invite, addenda will be emailed to registered Potential Offerors who have selected the commodity codes for this event. Issue RFQ This RFQ is being issued on behalf of the City on the date indicated in the timeline. Deadline for Written Questions Potential Offerors may submit written questions to CPD and the Procurement Manager as to the intent or clarity of this RFQ as indicated in Section the Timeline. All written questions must be submitted via the OpenGov Procurement Portal. Questions shall be clearly labeled and shall cite the Section(s) in the RFQ or other document which form the basis of the question. Responses to Written Questions Responses to the written questions will be provided on OpenGov, on or before the date indicated in the Timeline. Proposals Due Date Only electronic proposal submission is allowed. ALL PROPOSALS MUST BE SUBMITTED FOR REVIEW AND EVALUATION BY THE CPD AND EVALUATION COMMITTEE VIA UPLOAD. Pursuant to NMSA 1978, Section 13-1-116, the contents of proposals shall not be disclosed to competing Offerors during the negotiation process. The negotiation process is deemed to be in effect until the contract is awarded pursuant to this RFQ. Awarded in this context means approved by the City Manager or Mayor. Evaluation An Evaluation Committee will perform the evaluation of proposals. This process will take place as indicated in the timeline, depending upon the number of proposals received. During this time, CPD or/and the Procurement Manager may initiate discussions with Offerors who submit responsive or potentially responsive proposals for the purpose of clarifying aspects of the proposals. However, proposals may be accepted and evaluated without such discussion. Discussions SHALL NOT be initiated by the Offerors. Selection of Finalists The Evaluation Committee will select, and the Procurement Manager will notify the finalist Offerors as per the timeline or as soon as possible thereafter. A schedule for Oral Presentation, if any, will be determined at this time. Finalists will be comprised of the Offerors receiving the highest cumulative scores in the following sections: Organizational Experience, Organizational References, and Mandatory Specifications. Finalize Contracts After approval of the Evaluation Committee Report, any contractual agreement(s) resulting from this RFQ will be finalized with the most advantageous Offeror(s), taking into consideration the evaluation factors set forth in this RFQ, as per Section the Timeline or as soon as possible thereafter. The most advantageous proposal may or may not have received the most points. In the event mutually agreeable terms cannot be reached with the apparent most advantageous Offeror in the timeframe specified, the City of Santa Fe reserves the right to finalize a contractual agreement with the next most advantageous Offeror(s) without undertaking a new procurement process. Contract Awards Upon receipt of the signed contract, the Department will award pursuant to the Timeline, or as soon as possible thereafter. The award is subject to appropriate Department and City Manager/Governing Body or Board approval. Contractors must not commence work until the Department issues them a Purchase Order (PO) and instructions to start. Protest Deadline Any protest by an Offeror pertaining to the solicitation or award must be submitted within 15 days from the notice of solicitation or award and in conformance with NMSA 1978, Section 13-1-172 and applicable procurement regulations. As a Protest Manager has been named in this RFQ, pursuant to NMSA 1978, Section 13-1-172 and Procurement Manual Section Y, ONLY protests delivered directly to the Protest Manager in writing and in a timely fashion will be considered to have been submitted properly and in accordance with statute, rule, and this RFQ. The 15-calendar day protest period shall begin on the day following the notice of award of contract(s) and will end at 5:00 pm MST/MDT on the 15th day. Protests must be written and must include the name and address of the protestor and the RFQ number. The protest must include a detailed statement of the grounds for the protest, al
Published attachments
Public questions and answers
A. Contract Term and Optional Second Year 1. Section I, Scope of Procurement – Term. The contract term is one (1) year "with the option to extend to two (2) years," while the deliverable is a complete rewrite of the ACM, AEP, and SICP ready for FAA review. Please clarify: 1. Must all three documents be complete and submitted to the FAA within the first year? 2. Is the optional second year intended mainly to cover FAA review, comments, and resubmittal if FAA acceptance/approval goes beyond year one? 3. Does the second year include any other services, such as AEP annual review, ACM amendments, training support, or exercise support? If so, please describe the expected scope. 4. Should offerors price the optional year separately, or is the single "total calculated for the complete rewrite" (Business Specifications, Cost) expected to cover both years?
Yes, the ACM, AEP, and SICP will all be completed and submitted within the 1 year contract term. The second year would be an amendment and is optional per the airport's approval. the Pricing Sheet is only a calculated lump sum for each document.
Section I, Scope of Procurement – Acceptance. The RFP asks for documents "ready for full review by the FAA." Is final acceptance and payment tied to (a) City acceptance of documents ready for submittal, or (b) FAA approval/acceptance? If the FAA review timeline is outside the consultant's control, how will that be handled under the contract term?
that goal is to have all documents into review and have approval within the 1 year term. in the instance that this is not possible there is and option for amendment of term.
4. Section I, Purpose. Please confirm SAF's current Part 139 certificate class, any certificate limitations, and any active FAA exemptions the documents must reflect.
Class 1, no Exemptions.
B. Scope and Existing Documents 3. Section I, Purpose / Section IV, Scope of Work. Please provide or make available the current ACM, AEP, and SICP (or a summary: page count, last FAA-approved revision date, and editable format available). If they cannot be released before proposals are due, may offerors inspect them?
The current ACM is a public document, however will reqired and IPRA be done prior to the release of any documents.
5. Section I, Purpose. The RFP calls for a "derivative" SICP. Is the SICP intended to be part of the ACM (as referenced in 14 CFR 139.313) or a stand-alone document that the ACM references?
The SICP will be part of the ACM .
6. Section IV, Scope of Work – ACM. Are there open FAA findings, letters of correction, or recent inspection items that the rewritten ACM must address?
Yes to all three items.
7. Section IV, Scope of Work – ACM. Does SAF have a current Wildlife Hazard Assessment and Wildlife Hazard Management Plan, and current airport diagrams/drawings? Is the consultant expected to prepare or update any of these, or only reference them?
This is not an addressed Apendicies
8. Section IV, Scope of Work. Will the City provide approved operational decisions (staffing, ARFF Index, equipment, responsibilities) for the consultant to document, or is the consultant expected to recommend them?
No, the classifications are as set by the FAA and are current.
C. Coordination, Meetings, and FAA Review 9. Section IV, Scope of Work – Onsite meetings. Please estimate the number of onsite visits, interviews, and stakeholder meetings the City expects, or confirm that offerors should state their own assumptions.
this is dependent of the individual consultants.
10. Section IV, AEP – Interagency coordination. Please list the agencies expected to take part (for example, City/County Fire, police, emergency management, hospitals, the FAA ATCT, TSA, mutual-aid partners) and about how many interagency meetings should be planned.
that will be determined by professional findings and necessity
11. Section IV, AEP – Exercises and training. The AEP scope includes "development of procedures for emergency exercises, training, and ongoing plan maintenance." Please confirm this means writing procedures only, and does not include planning, running, or evaluating a tabletop or full-scale exercise.
just development of the plan
12. Section IV, Scope of Work – FAA coordination. How many FAA review and resubmittal cycles should offerors include in their pricing? Will the City or the consultant formally submit the documents to the FAA?
the document will not be considered complete until FAA final approval is given.
13. Section IV, Scope of Work – Review periods. Will City comments be given to the consultant as one consolidated set per review cycle through the Airport Operations Manager?
Yes, reviews cycles will be in one comment period.
14. Section IV, Scope of Work. Is there a required completion date or milestone schedule for the three documents (for example, finishing the SICP before the 2027–2028 winter season)?
The Airport would like these documents to be on an expedited timeline.
17. Section II, Local Preferences; Section V, Cost. What funding sources will pay for this contract, and will the City award local preference points for this solicitation? If any federal funds will be used, please identify the additional contract terms, required proposal forms, and any DBE participation goal that applies to this contract.
This project will be paid using local funding, local preference will be utilized and is in the vendor questionnaire section.
18. Business Specifications, Cost. Is there an estimated budget or not-to-exceed amount for this project?
No, at this time the RFP will be scored on multiple sections and 1 being cost.
D. Cost Proposal and Funding 15. Business Specifications, Cost / Definition U, "Hourly Rate." The definition says rates are "fully loaded" including travel and per diem, but cost is evaluated as a total for the full rewrite. Please confirm whether the City wants a firm fixed price, not-to-exceed hourly pricing, or both. Should travel be included in hourly rates or listed separately on the COST_RESPONSE_FORM?
all estimated costs should be included in the lump sum as requested on the Cost form.
16. Business Specifications, Cost. The RFP says "All charges listed in the Cost must be justified and evidence of need documented." Please explain what documentation is expected (for example, hours by task and by person).
Expected documentation will be the Cost form and explanation of need in the proposal as the consultant sees fit.
19. Section II, Gross Receipts Tax. Should New Mexico gross receipts tax be included in the cost proposal or shown as a separate line?
No, NMGRT will be calculated at time of the contract.
E. Qualifications and Teaming 20. Section V, Mandatory Specification A. Must the company submitting the proposal have performed the required rewrites itself, or may it use projects completed by (a) a proposed subcontractor or (b) proposed key personnel while working for a previous employer? If one project included all three rewrites, may it count as one example in each document category?
this is subject to the consultant, but should be identified in the proposal.
21. Organizational Experience C. The RFP asks for "at least two project successes of a rewrite of an ACM, AEP, and SICP that was approved by the FAA." Must each example include all three documents for the same airport, or may examples cover separate documents at different airports?
Examples may cover different airports.
23. Organizational References / Timeline. What is the deadline for references to return the Organizational Reference Questionnaire, and who should receive it?
Reference questionnaire should be given to the consultant selected person/s and should be completed and sent to the contact emails in the RFP document. the deadline is proposal due date.
25. Section II / Section VII – Draft Contract. Please confirm that the draft contract posted on OpenGov is the final version for review. Please also list the required insurance types and limits (including professional liability), so offerors can confirm coverage before submitting.
all necessary insurance requirements are stated within the contract. the draft contract is for review and redline and is the current City contract template, the final contract will be set after project award.
26. Section IV, Deliverables – Ownership and security. Please confirm the City will own the final editable files. Are any source documents or final documents considered Sensitive Security Information (SSI) or otherwise restricted? If so, what handling requirements apply to the consultant and its subcontractors?
This is considered a public document but will need and IPRA to obtain it as requested. Yes, the Santa Fe Regional Airport will own the Final Documents. The SSI will be addressed at consultant and airports descression at time of developement.
27. Section VII – Desirable Certifications. Will the desirable certifications (AAE, CM, ACE-Operations, CEM, ICS-100 through 400) be scored? If so, under which evaluation criterion and with what weight? Can they be held by any key personnel, including subcontractor staff?
These documents will not be scored and are not required, these are simply desirable certs.
28. Section II, Timeline. Given that the Thanksgiving holiday falls between the answers to written questions (November 26) and the proposal due date (December 4), would the City consider extending the proposal due date?
No, this RFP is on an expedited timeline and can not be amended.
14 CFR Part 139.337 requires commercial service airports to conduct a wildlife hazard assessment after certain qualifying wildlife strikes and to implement a Wildlife Hazard Management Plan. Does the airport have a current Wildlife Hazard Management Plan or possess documentation that it does not need one? Further, can you confirm that this RFP does not require the development of a Wildlife Hazard Management Plan?
This RFP is specifically for the three documents, ACM, AEP, and SICP, there will not be a need for any other Airport required documents referred to in Part 139.
RFP Section III. Response Format and Organization states: The maximum page limit for the entire Proposal is ## pages. Can clarification be provided if there is a page limit to any potential proposal?
This was an error and can be disregarded.
22. Organizational References. References must be within the last three (3) years, while Mandatory Specification examples may be within the last ten (10) years. Please confirm the difference is intentional. Also, the Organizational Reference section in the Vendor Response lists "disaster preparedness, response, mitigation, and recovery professional services" as the technical environment. Please confirm what references should show for this airport project.
The difference is intentional, the technical environment should be referenced in the mandatory specification examples.
F. Proposal Format and Contract Terms 24. Section III, Response Format – Page limit. The page limit is shown as "## pages." Please state the maximum page count and whether forms, resumes, certificates, and example excerpts count toward it.
This was an error on our part and can be disregarded.
Airport Certification Manuals and the Snow and Ice Control Plan require exhibits that require specialized software to construct, such as the Sign and Marking Plan, Snow Removal Priority Diagram, and potentially elements of the Wildlife Hazard Management Plan. Will proposals need to include the creation of the required diagrams in their work effort? This will significantly impact the cost portion of my proposal.
all required diagrams will be needed for the three requested document. ACM, AEP, and SICP.
The FAA issued a draft Advisory Circular on November 19, 2026, titled AC 150/5200-31D, Airport Emergency Plan. That Advisory Circular may drive unknown changes to writing an Airport Emergency Plan. Should potential proposers plan to include costs associated with this updated Advisory Circular as its approval would be anticipated within the time of a proposed contract, or would this be outside the scope of the RFP?
If the AC is approved and issued during the time of the rewrite then yes it will be needed to be addressed.
FAA Regions vary by region how including letters of agreement in the airport certification manual. At a minimum, the letter of agreement for RSA access is typical. Are letters of agreement current with Air Traffic Control? If not, will the creation of these letters of agreement need to be included in the proposal or will them be provided?
We have letters of agreement but the creation/ or edit of LOAs will not be included in this project
3. Is any advance or mobilization payment permitted upon contract execution and issuance of the purchase order? If so, what conditions or limitations apply?
no, there is not.
What is the payment period following receipt of a proper invoice, and what review or acceptance period applies before an invoice becomes payable?
30 days from invoiced date.
Is any portion of payment contingent upon FAA review or approval? If so, may the contractor receive payment for completed deliverables while FAA review is pending?
Final payment will be contingent on FAA approval.
Regarding Section II, General Requirements, paragraphs O–Q; Section V, Business Specifications—Cost; and the referenced Draft Contract: 1. May the contractor invoice incrementally upon completion and City acceptance of agreed project milestones, rather than waiting until completion of all three final documents?
Yes.
2 Alternatively, will the City permit monthly progress invoices for services performed?
Yes.
Should an offeror’s proposed payment schedule be included in the Cost Proposal, submitted as a redline to the Draft Contract, or both?
Neither, this is covered within the contract itself.
Would three qualifying engagements, each covering all three documents, satisfy the requirement for three ACM, three AEP, and three SICP examples? Or does the City require nine distinct engagements?
as long as the three are covered and described in the proposal it will met the requirements.
Regarding the response to Question 22, please provide the exact recipient name and email address—or other required submission method—for completed Organizational Reference Questionnaires. Please also confirm: a. References must submit completed questionnaires directly to the City, rather than return them to the offeror. b. The City must receive the questionnaires by December 4, 2026, at 3:00 p.m. Mountain Time, rather than merely sometime on the proposal due date. c. If the questionnaire’s recipient or submission instructions differ from the RFP or published Q&A, which instructions control? Please identify any required email subject line or solicitation-number notation.
For reference information, please refer to the RFP document, all necessary information is provided and nothing extra will be needed. The due date for anything required by the RFP for submissions is December 4th, 2026 @ 3:00pm MST
How old is the current ACM?
Approximately 10 Years
Will the rewrite need to include record keeping profiles and/or considerations that need to be updated to a new system?
Can you pleas expand with more detail to your question.
Specifically, how many sections of the (ACM) need to be full rewrites versus updates?
It is a full rewrite.
Does the rewrite include considerations for the Phase II build-out? If so, up to what point (ie the new tower relocation and build)?
Written to current conditions of the Airport at time of rewrite.
Does the rewrite need to include engineering? If so, exactly what considerations and number of documents.
To be determined at time of rewrite.
Section IV - Scope of Work: Will the Airport provide existing electronic base mapping to support the development of the required exhibits, including AutoCAD files, GIS data, Airport Layout Plan (ALP) drawings, record drawings, and aerial imagery? Please identify available file formats and approximate dates of the information.
Airport will supply all documentation currently available at start of project.
Section IV - Scope of Work: Which of the required ACM, AEP, and SICP exhibits currently exist? Are editable versions of these exhibits available, or should consultants anticipate developing all exhibits from scratch?
Yes, this is a a full rewrite project, current ACM, AEP, and SICP will be given at start of project.
Section IV - Scope of Work, ACM: Does the Airport maintain a current airfield sign and marking inventory, including sign locations, inscriptions, orientation, and marking configurations? If so, will this information be provided to the selected consultant?
Yes.
Section IV - Scope of Work, ACM: Does the Airport maintain a current inventory or drawing identifying obstructions required to be marked or lighted under Part 139? Will existing obstruction survey data be made available to the selected consultant?
Yes, but information will need to be updated.