SHIP Program Julio Bueno - Exterior Paint
Description
The Community Services Division is seeking quotations from experienced and qualified contractors to establish vendors for our Homeowner-Occupied Rehabilitation Program. Contractors selected may be awarded based on their qualifications, cost-effectiveness, and capacity to complete work within the required timeframe. The scope of work for the Julio Bueno project includes: Stucco Repair & Smooth‑Finish Conversion House Exterior Painting SCOPE OF WORK Stucco Repair & Smooth‑Finish Conversion Existing Conditions : The existing stucco exhibits cracking, delamination, surface roughness, and weather‑related deterioration. The finish has a rough texture that is inconsistent with the desired smooth architectural appearance. Areas of loose, hollow, or compromised stucco are present and require removal and repair. Scope of Work: The Contractor shall perform comprehensive repairs to the exterior façade stucco across all elevations of the residence. Work includes removal of deteriorated stucco, correction of substrate deficiencies, resurfacing of the entire exterior with new cementitious stucco, and conversion from the existing rough texture to a uniform smooth finish. Upon completion of stucco work, all exterior surfaces shall be primed and painted. Stucco Removal & Surface Preparation Remove all loose, delaminated, hollow‑sounding, or compromised stucco down to a sound substrate. Clean surfaces to remove dust, debris, efflorescence, and contaminants. Perform crack repairs using V‑groove cutting, cleaning, and application of approved bonding agent. Where metal lath is exposed or deteriorated, replace with galvanized lath installed per ASTM C1063. Ensure substrate is structurally sound and ready to receive new stucco. Stucco Application - Smooth Conversion Base Coat Apply bonding agent to all prepared surfaces. Install new cementitious stucco base coat per ASTM C926 and Florida Building Code requirements. Float and level base coat to eliminate surface irregularities and prepare for finish coat. Finish Coat – Smooth Texture. Apply a full resurfacing finish coat designed to achieve a smooth, uniform architectural appearance. Finish shall be troweled smooth, free of ridges, bumps, or texture inconsistencies. Contractor shall ensure consistent finish across all elevations, including transitions at corners, soffits, and architectural details. Control Joints & Expansion Joints Inspect existing control joints for proper placement and condition. Replace or add control joints as required to comply with ASTM C1063 spacing and layout standards. Ensure joints are properly integrated into the smooth finish. Curing & Moisture Control Maintain proper curing conditions per manufacturer recommendations and ASTM standards. Protect stucco from premature drying, excessive moisture, or impact during curing. Verify that moisture intrusion points (penetrations, windows, doors, utility entries) are properly sealed. Primer & Exterior Painting After stucco has fully cured, apply one coat of approved masonry primer. Apply two coats of high‑quality exterior paint suitable for stucco surfaces. Ensure uniform color, coverage, and finish across all elevations. Protect adjacent surfaces, landscaping, and hardscape during painting operations. Cleanup & Final Delivery Remove all debris, stucco waste, and construction materials from the property. Clean surrounding areas affected by construction activity. Conduct final walkthrough with Owner to verify finish quality and completeness. Codes & Standards: All work shall comply with: Florida Building Code (FBC) ASTM C926 – Application of Portland Cement-Based Plaster ASTM C1063 – Installation of Lathing & Furring HVHZ requirements (Miami‑Dade) Manufacturer installation instructions Industry‑accepted best practices House Exterior Painting Scope of Work : The Contractor shall perform complete exterior painting of the residence following the recent stucco repair and smooth‑finish resurfacing. Work includes surface preparation of the new stucco, application of masonry primer, and two finish coats of Sherwin‑Williams premium exterior paint. All work shall comply with Florida Building Code, Sherwin‑Williams manufacturer specifications, and industry standards. Surface Preparation: Ensure all newly applied stucco has fully cured per ASTM C926 and manufacturer recommendations. Clean all exterior surfaces to remove dust, debris, and construction residue from stucco work. Inspect stucco for imperfections; perform minor patching where necessary using compatible cementitious materials. Caulk gaps at trim, windows, doors, and penetrations using Sherwin‑Williams SherMax™ or equivalent exterior sealant. Mask and protect windows, doors, soffits, fascia, landscaping, and adjacent finishes. Primer Application (Required for New Stucco) Apply Sherwin‑Williams Loxon® Masonry Primer to all new stucco surfaces. Primer shall be applied uniformly to ensure proper adhesion and sealing of the stucco substrate. Allow primer to dry per manufacturer’s recommended curing time before applying finish coats. Finish Coats – Sherwin‑Williams Exterior System Product Selection (Color and Sheen determined once the project is awarded) Approved Sherwin‑Williams systems include: Duration® Exterior Acrylic SuperPaint® Exterior Acrylic Latitude® Exterior Acrylic Resilience® Exterior Acrylic (recommended for moisture‑sensitive conditions) Application Apply two full coats of selected Sherwin‑Williams exterior paint to all stucco walls, fascia, soffits, trim, and architectural elements. Ensure uniform coverage, color consistency, and proper film thickness per manufacturer specifications. Apply paint by brush, roller, or spray as appropriate for substrate and environmental conditions. Final Inspection & Touch‑Ups Inspect all painted surfaces for coverage, uniformity, and finish quality. . Perform touch‑ups as needed to correct thin areas, drips, or inconsistencies. . Remove masking materials and clean all work areas. Cleanup & Disposal Remove all paint debris, masking materials, and waste from the property. Dispose of materials in accordance with local regulations. Leave the property in clean, professional condition. Codes & Standards: All work shall comply with: Florida Building Code (FBC) Sherwin‑Williams manufacturer specifications PDCA Industry Standards HVHZ requirements (Miami‑Dade County) where applicable General Construction Requirements Administrative & Compliance Licensing Requirements: The primary Contractor must possess and maintain a valid State of Florida General Contractor, Specialty Electrical, Roofing, etc. license or equivalent. Permitting: The Contractor is solely responsible for obtaining any applicable municipal, county, or state permits required for the work. All work must strictly comply with the current Florida Building Code and all applicable federal, state, and local life-safety and environmental regulations. Municipal permits issued by the City of Hialeah shall be at no cost to the Contractor; if payments are required, they will be reimbursed. Subcontractor: The Contractor must explicitly identify any potential subcontractors within their quote response using the provided Subcontractor Form. All subcontractors are subject to City approval. Site Verification and Protection of Property Site Conditions: The Contractor is responsible for verifying all field conditions, measurements, and utility locations (utilizing Florida Sunshine One Call) prior to submitting a quote and commencing work. Property Damage: The Contractor shall take full responsibility for maintaining and protecting all existing structures, sidewalks, and utilities. Any damage caused to public or private property by the Contractor must be repaired or restored to the City’s satisfaction at the Contractor's sole expense within thirty (30) days. Safety, MOT, and Site Management Safety & Barricades: The Contractor is responsible for all site safety, including compliance with OSHA regulations. The Contractor must supply and use pedestrian warning devices and barricades to keep the public out of the active work zone. Maintenance of Traffic (MOT): If work affects roadways, the Contractor must maintain passable streets and provide all necessary temporary signs, flagmen, and barricades in accordance with the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). Debris & Hauling: The Contractor must keep the premises free of waste accumulation. Any debris or waste generated as a result of construction must be removed by a City-authorized waste hauler, or the Contractor must provide proof of disposal at a licensed facility in compliance with local municipal codes. The Contractor shall be responsible for all costs associated with the legal collection and disposal of all construction-related materials. For more information, please visit https://www.hialeahfl.gov/1079/Non-Exclusive-Franchise-Program . Contract Administration & Invoicing Change Orders: Any work that exceeds or varies from the original scope of work must be pre-approved in writing via an official Change Order by the City’s Project Manager before the work is performed. Unauthorized work will not be compensated. Invoicing and Release of Liens: The Contractor must provide all required partial or full Releases of Lien from the primary contractor and any subcontractors or material suppliers with their payment requests. No invoice will be processed for payment until all applicable signed releases of lien have been furnished to the City. Acceptance, Punch List, and Warranties Completed Work & Punch List: Upon completion, the City will inspect the work. Any punch list items or non-conforming work must be completed within thirty (30) days of the final inspection at no additional cost. Work not satisfactorily completed must be corrected at no additional charge to the City. Guarantee: The Contractor guarantees all workmanship and methods to be free of defects for a period of no less than one (1) year from the date of final acceptance. All manufacturer product warranties shall be transferred to the City upon completion. Project Schedule & Access Timeline: The City desires the project to be completed within ninety (90) days of the Notice to Proceed. Work Hours: Work must typically be performed during normal business hours (e.g., Monday-Friday, 8:00 AM - 5:00 PM EST), unless otherwise approved by the City. Any highly disruptive work must be coordinated in advance and may require after-hours or weekend scheduling. Site Security: Contractor personnel must comply with all City security procedures and access requirements. Unforeseen Conditions: If unforeseen structural or site conditions arise that require a deviation from the original scope, the Contractor must notify the City immediately. The Contractor shall not commence any corrective work without prior written authorization. Testing, Deliverables, and Acceptance Criteria Performance Testing: Visual Inspection Only Required Documentation/Deliverables: Prior to final payment, the Contractor must submit the following to the City: As-Built Drawings Manufacturer Warranty Certificates Operations & Maintenance Manuals Final Acceptance: Final acceptance will be granted by the City's designated representative upon successful completion and verification of all physical tasks, testing requirements, and documentation outlined in this Scope of Work. Minimum Qualifications To be considered responsive, the Contractor must possess and submit proof of the following with their quote in the RESPONSE section: Licensing: A valid State of Florida General Contractor, Building, Residential, or hold a Miami-Dade County issued Specialty Lathing and Plastering Contractor. Business Tax Receipt: A valid Business Tax Receipt (BTR). References: A list of two (2) professional references for completed projects of similar size and scope. The list must include the name of the entity, contract dates, a description of the completed work, a contact person, their email address, and a current telephone number. Do not include references from the City of Hialeah. Completed Contracts: Proof of a minimum of two (2) completed contracts within the last two (2) years that are substantially similar in scope and value to the requirements of this solicitation. This list must include the client entity name, the client's contact person, a narrative description of the servi INTRODUCTION Summary Background Contact Information Timeline The following timetable should be used as a working guide for planning purposes. The City reserves the right to adjust this timetable, as the City deems necessary, during the course of this Solicitation process. GENERAL TERMS AND CONDITIONS CITY OVERVIEW Hialeah, Florida (Estimated population of approximately 221,300) is a diverse community, ideally located midway between Miami and Fort Lauderdale, and encompasses approximately 23 square miles. As the fifth largest city in the State of Florida, Hialeah is committed to growth in its business and residential communities, while also focusing on issues such as education, the arts, leisure activities, public safety, and sustainability to provide a viable future for our residents and preserve the City’s rich history since its incorporation in 1925. In 2025 the City is celebrated its centennial. The City currently has 1500+ employees and provides a wide range of governmental services to its citizens, including public safety/police services, parks and recreation, public works, water and sewer, planning, building and zoning, code enforcement, and community development. The City is a very large consumer of goods and services, and the purchasing decisions of our employees and contractors can positively or negatively affect the environment. By including environmental considerations in our procurement information, along with our traditional concerns with price, performance, and availability, we will remain fiscally responsible while promoting practices that improve public health and safety, reduce pollution, and conserve natural resources, while still evaluating the Proposals on applicable legal and technical criteria. DEFINITIONS Capitalized words and phrases in this Solicitation are defined in this section and in the Agreement. In addition, the following terms, phrases, words, and their derivations shall have the meaning given herein: 'Invitation for Quotes ('ITQ')' means a simplified written solicitation for competitive price quotes, typically used for the acquisition of readily available goods or services of relatively low value. The Invitation for Quotes specifies the required commodity or service, quantity, delivery requirements, and any other relevant specifications, enabling vendors to provide quick and straightforward pricing. The Invitation for Quotes includes instructions prescribing all conditions for submitting quotes and shall be available for distribution to all prospective quoters at the same time. The Invitation for Quotes is used when the city requires a prompt acquisition of standard items or services, where price is the primary factor for selection, and detailed proposals are not necessary. ‘ Agreement, Contractor' means the “ SHIP Program Julio Bueno - Exterior Paint ” , including all of the exhibits and addendums/amendments thereto. No contract rights or expectations can be alleged, anticipated, expected, or claimed unless and until the Agreement is fully executed and a Work Order or similar document, as applicable, has been issued by the City. 'Award' means the acceptance of a Response, offer, similar response, or proposal by the City Council of the City of Hialeah. ' Successful Respondent, Contractor’ means the Respondent that receives an award of the Agreement from the City as a result of this Solicitation. ‘Respondent, Quoter, Proposer, Vendor, Contractor’ means the Person, company, business entity, or organization submitting a Response in reply to this Solicitation. When the terms “Respondent, Quoter, Proposer, Vendor, or Contractor” are used they shall have the same meaning in this solicitation. ' City' means, depending on the context, either (a) the geographic area contained within the municipal boundaries of the City of Hialeah, Florida, or (b) the government of the City, acting through Mayor and/or the City Council or its designees, as applicable. ‘Department’ means the City of Hialeah, FL, Community Development, Housing & Community Services Division and/or their successor City Department, office, agency, or division. 'Director' means the Directior of Housing & Community Services Department , or the Director's authorized designee. 'Solicitation' means this Invitation to Quote (ITQ). ‘Response, Bid, Submission’ means the response submitted in reply to this Solicitation. 'Respondent, Quoter, and Proposer' have similar meanings under this Solicitation insofar as that they refer to the person or entity submitting a response to the Solicitation. ‘Work,’ ‘Services,’ ‘Program,’ ‘Project,’ or ‘Engagement’ mean all matters and things that will require to be done by the Successful Respondent(s) in accordance with the scope of work and all terms and conditions of this Solicitation. ‘Project Manager’ means the individual in charge of serving as the day-to-day representative of the City for the project and contract administration. The City Project Manager will be designated by the Mayor or Director. ' Mayor' means the Chief Executive Officer of the City who manages the day-to-day operations of the City. The Mayor or his/her authorized designee will be authorized to make needed routine contractual decisions on behalf of the City. ' City Council' means the local legislative body of the City who would consider approving the Award, or not, as the case may be and would need to approve any resulting Agreement, and any Amendments to such Agreement. 'Purchasing Division Director’ means the Director of the City’s Purchasing Division who is authorized to respond to and address procurement/purchasing issues relative to this Solicitation and/or the award or other action of the City regarding this Solicitation. INVITATION This Solicitation is extended to any Person, company, and organization that can satisfy the requirements specified herein. The requirements presented in this Solicitation represent the City’s anticipated needs. PUBLIC ENTITY CRIME / DISCRIMINATORY VENDOR LIST The Public Entity Crime Affidavit Form, found in the RESPONSE Section, includes documentation that shall be executed by an individual authorized to bind the Respondent. Any Respondent, or any of its suppliers, subcontractors, or consultants who shall provide goods and services and/or materials that are intended to benefit the City, shall not be a convicted vendor or included on the discriminatory vendor list. If the Respondent or any affiliate of the Respondent has been convicted of a public entity crime or has been placed on the discriminatory vendor list, a period longer than 36 months must have passed since that person was placed on the convicted vendor or discriminatory vendor list. The Respondent further understands and accepts that any contract issued as a result of this Solicitation shall be either voidable or subject to immediate termination by the City. In the event there is any misrepresentation or lack of compliance with the mandates of Section 287.133 or Section 287.134, respectively, Florida Statutes. The City in the event in such termination, shall not incur any liability or cost to the Respondent for any goods, services, supplies, materials, and/or materials furnished. By submitting a response, the Respondent further affirms they are not in violation of Sections 287.1346 , 287.135, 287.1351, 287.136, 287.137 and 287.138, Fl
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
2nd pre-proposal meeting on November 12, 2026, at 10:00 am at 751 SE 7 PL Hialeah, FL 33010. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4 · 4
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #5 · 5
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
QUESTION 1 — PROJECT MEASUREMENTS Please provide the approximate square footage of the exterior walls and the quantities or dimensions of the fascia, soffits, trim, architectural elements, doors, and other surfaces to be painted.
Aprox 2,365 sf
QUESTION 2 — EXTENT OF STUCCO RESURFACING Section 3.1.2 requires “resurfacing of the entire exterior with new cementitious stucco.” Please confirm whether the contractor must apply a new stucco finish coat over 100% of all exterior wall elevations or only over the areas requiring repair.
The Contractor shall perform comprehensive repairs to the exterior façade stucco across all elevations of the residence. Work includes removal of deteriorated stucco, correction of substrate deficiencies, resurfacing of the entire exterior with new cementitious stucco, and conversion from the existing rough texture to a uniform smooth finish. Upon completion of stucco work, all exterior surfaces shall be primed and painted.
QUESTION 3 — EXISTING STUCCO DAMAGE Please provide the estimated square footage or percentage of stucco expected to require removal and replacement, including any known areas of damaged substrate, deteriorated metal lath, or failed control joints.
Aprox 2,365 sf
QUESTION 5 — PAINT SYSTEM Section 3.2 identifies Duration, SuperPaint, Latitude, and Resilience as approved paint systems. Because these products have different costs, please identify the specific Sherwin-Williams product line bidders should use as the basis of their pricing.
The Contractor shall perform complete exterior painting of the residence following the recent stucco repair and smooth‑finish resurfacing. Work includes surface preparation of the new stucco, application of masonry primer, and two finish coats of Sherwin‑Williams premium exterior paint. All work shall comply with Florida Building Code, Sherwin‑Williams manufacturer specifications, and industry standards.
QUESTION 4 — CONCEALED CONDITIONS AND UNIT PRICES Because the extent of concealed substrate, lath, and moisture damage cannot be determined before demolition, will the City establish allowances or request unit prices for additional stucco removal, substrate repair, metal lath replacement, control joints, and other concealed-condition work?
Since the project does not include demolition, concealed substrate, lath, or moisture damage is not expected to be an issue. The scope of work is limited to stucco and painting, so additional allowances or unit prices for concealed-condition work are not necessary.
QUESTION 6 — LEAD, ASBESTOS, AND HAZARDOUS MATERIALS Has the residence been inspected or tested for lead-based paint, asbestos, or other hazardous materials? If testing or abatement becomes necessary, will that work be performed under a separate allowance or written change order?
No remediation is required.
QUESTION 7 — CONTRACT TIME Article III of the sample contract requires completion within 90 calendar days after the Notice to Proceed but also states that Contract Time shall not exceed 30 business days from the date the building permit is ready to be issued. Please clarify which completion period will govern this project.
The completion period shall be ninety (90) calendar days, as specified in Section 3.3 of the General Terms and Conditions within the Scope of Work section.
QUESTION 8 — PERMIT COSTS Section 3.3 states that City of Hialeah permit fees will be provided at no cost to the contractor or reimbursed. Article IV of the sample contract states that the lump-sum Contract Price includes all Building Department permit fees. Please clarify whether bidders should include permit fees in their prices.
Yes, Addendum No. 5 has been issued, adding a separate line item in the pricing proposal for the permit fees.
QUESTION 9 — BONDING REQUIREMENTS The ITQ requires a bid bond when the bid exceeds $100,000 and performance and payment bonds when the contract exceeds $200,000. The sample contract appears to require performance and payment bonds equal to the Contract Sum without stating a minimum threshold. Please confirm the bonding requirements applicable to this project.
There are no bonding requirements for this solicitation. The sample contract is provided for reference purposes only. The final agreement will conform to the requirements established in the solicitation.
QUESTION 10 — INSURANCE REQUIREMENTS Please provide or identify the location of the Insurance Requirements and Insurance Checklist referenced in the solicitation, including all required coverage limits and endorsements. Please also confirm whether builder’s risk insurance is mandatory for this stucco and exterior painting project.
The Insurance Requirements and Insurance Checklist are located in Section 4, Quote Response, under Item 7, Insurance Requirements. Builder’s Risk is not included in the insurance requirements for this solicitation.
Hi, I’m reviewing a painting contract, and I’d like to clarify the licensing requirements. Could you please let me know which license is required for this project? I currently hold a Painting and Waterproofing license and would like to confirm whether my license is sufficient for the work specified in the contract. Thank you for your help!
As specified in the solicitation, the respondent must submit a valid State of Florida General Contractor, Building, or Residential Contractor license, or hold a Miami-Dade County-issued Specialty Lathing and Plastering Contractor license. Subcontractors are permitted to perform the work, provided they hold the appropriate licenses required for their respective scope of work.
Could you please let me know if there is an allocated budget for this project?
The budget for this project is $17,500.00.
Hi, I’m reviewing a painting contract, and I’d like to clarify the licensing requirements. Could you please let me know which license is required for this project? I currently hold a Painting and Waterproofing license and would like to confirm whether my license is sufficient for the work specified in the contract.
As specified in the solicitation, the respondent must submit a valid State of Florida General Contractor, Building, or Residential Contractor license, or hold a Miami-Dade County-issued Specialty Lathing and Plastering Contractor license. Subcontractors are permitted to perform the work, provided they hold the appropriate licenses required for their respective scope of work.
The City has confirmed a project budget of $17,500. Please confirm whether this amount represents the maximum allowable contract value or an estimated construction budget. Will bids exceeding this amount be considered?
The $17,500 project budget is the maximum allowable contract value.
What is the budget for this project include stucco repair and paint?
The budget for this project is $17,500.00.
Is a Payment & Performance Bond required if the quote is under $200,000? (Sample contract Art. II and IV references F.S. 255.05)
No
Where should the project schedule required in Section 3.3.6 be uploaded?
The project schedule can be uploaded under Section 4. Quote Response under question 3.1: Minimum Qualifications.
What year was the residence built? Has lead-based paint testing been performed?
1946, lead testing was conducted, and the results indicated that no lead remediation is required.
The addendum changing this meeting to mandatory was issued after the meeting had already taken place. May be still submit a bid since the meeting was not mandatory.
The pre-bid meetings are not mandatory.
1. Licensing (Scope of Work s. 3.3 and Minimum Qualifications; Quote Response item 3.1) The ITQ asks for a valid State of Florida General Contractor, Building or Residential license, or a Miami-Dade County Specialty Lathing and Plastering license. Greenbelt is a painting contractor and holds none of these. a. May a respondent without those licenses quote only the painting scope (Pricing Proposal line 2, exterior primer and paint), with no structural, lath or stucco work? Or must every respondent price line 1 (stucco) as well? b. If the City requires the respondent to hold one of the listed licenses, may that licensed respondent subcontract the painting scope to a firm that does not hold them, listed on the Subcontractor Form? (We note s. 489.113(2), Fla. Stat.) c. If a license is required for painting-only work, which one? Section 3.3 reads "General Contractor, Specialty Electrical, Roofing, etc. license or equivalent," which differs from the Minimum Qualifications list. Which controls? Our reading, which we ask the City to correct if wrong: s. 489.105(3), Fla. Stat., defines "contractor" by job scopes substantially similar to its listed paragraphs, and painting is not one of them. Section 489.117(4)(a)1 says a local government "may not require a person to obtain a license, issued by the local government or the state, for a job scope which does not substantially correspond to" the state categories, and lists "painting" among those job scopes. Miami-Dade County lists its "Pain
1. The City is seeking one qualified prime contractor to oversee and complete the entire project. Respondents must provide pricing for both stucco and painting. Separate quotes for individual portions will not be accepted. The prime contractor may utilize subcontractors for specific portions of the work, provided all applicable requirements are met. Subcontractors must be identified on the Subcontractor Form. Effective July 1, 2025, painting and plastering licenses are no longer required under the applicable licensing changes. The prime contractor must still meet the applicable licensing requirements for the overall project. 2. The project is a SHIP-funded rehabilitation of a privately owned residence and is not being procured as a traditional public works project. The City requires the prime contractor to meet the applicable licensing requirements for the scope of work. 3. Yes, the correct cite is 8 U.S.C. s. 1324a(h)(3) and 448.095, Fla. Stat. 4. There are no downloadable documents for the affidavits. The City confirms that no separate affidavit is required. Respondents must complete the confirmation item in the Response Section of OpenGov. 5. Yes, the respondent may use a subcontractor for the stucco work, identified on the Subcontractor Form. For Miami-Dade and statewide, no stucco or painting license is required after 7/1/2025. 6. The project budget is set at $17,500. Respondents must provide pricing for the entire scope of work. Quotes for painting alone will not be acc
Shrubs along the east side of the house block access to the stucco. Will the homeowner or the City remove or trim them before work begins, or is this the contractor's responsibility? If the contractor removes them, must they be replaced?
There is not work to be performed on that area.the shrubs do not need to be removed or trimmed by the contractor.
The rear wall has a faux tile baseboard, and some sections are broken. Should it be removed and the area stuccoed, or protected and left in place?
The existing faux tile baseboard shall be removed, and the exposed area shall be stuccoed to match the surrounding wall.
Should the faux brick on the rear elevation be removed and stuccoed over? Or should it remain in place, with the new stucco built out to finish flush against it?
The existing faux brick shall be removed, and the exposed area shall be stuccoed to match the surrounding wall.
On the east elevation, does the scope include the outside face of the enclosure wall, the inside face (within the enclosed area) only, or both faces?
The scope of work includes only the exterior face of the enclosure wall. The interior face and the east side are not included.
The wood faux awnings at the front of the house are deteriorated and rotted. Should they be removed? Or rebuilt and reset? If rebuilt, is the carpentry part of this contract?
The existing wood faux awnings shall be removed and disposed of.
Should the damaged wood at the front porch planters be demolished and replaced, or stuccoed over as it is?
Stucco should be applied over the existing wood. No demolition or replacement is included in the scope of work.
Are the walls at the flat-roof sections and the rear shed included in the stucco and paint scope?
No
The residence was built in 1946. Has the property been tested for lead-based paint? If lead is present, will abatement be handled by the City or included in this contract?
1946, lead testing was conducted, and the results indicated that no lead remediation is required.
Who selects the paint colors? Is it one body color and one trim color?
The paint colors will be selected once the project is awarded.
Are door frames, window frames, security bars, gates and fencing to be painted, or only stucco surfaces?
Only exterior stucco surfaces.
Section 4 (References) states that the Reference Survey must be completed and signed by the referencing entity. However, the Vendor Reference Verification Form (Attachment B) does not include a signature line. Please confirm how the referencing entity should sign the form.
A signature is not required. Providing the reference organization's name, contact person's name and title, email address, and phone number will suffice. The City will conduct a reference verification directly.
Could you confirm whether the $17,500 budget includes material costs, or if materials will be supplied?
The $17,500 budget must include all labor, materials, and supplies necessary to complete the work. The contractor is responsible for providing everything required to perform the work.
Please confirm that the existing fence, gates and site/perimeter walls are not included in the stucco repair and smooth-finish scope (consistent with Q&A #30), and advise whether the east elevation enclosure wall (Q&A #24) is included on the exterior face only, interior face only, or both. Also, what is the required completion time after Notice to Proceed?
Existing fences, gates, and site perimeter walls are excluded from the Scope of Work, including the columns along the east side.
Regarding the Insurance Checklist for ITQ 2026-27-010: (1) Item 4 (Workers' Compensation, statutory limits): If the vendor has no employees and its officer holds a current Florida Division of Workers' Compensation Certificate of Election to be Exempt, will the City accept the exemption certificate in place of a workers' compensation policy? All subcontractors would still carry workers' compensation per Item 14. (2) Item 2 (Automobile Liability, owned, non-owned and hired, $1,000,000 CSL): If the vendor does not own any vehicles in the company name, will the City accept a Hired and Non-Owned Auto Liability policy with a $1,000,000 combined single limit to satisfy Item 2?
Yes, the City will accept a Workers' Compensation exemption if applicable. The City will also accept Hired and Non-Owned Automobile Liability coverage if the company does not have company-owned vehicles.