St. Paul's Blue- Greenway - Stormwater Phase
Description
The St. Paul's Blue-Greenway Stormwater Phase includes daylighting of approximately 1,200 linear feet of existing box culvert, excavation, active-flow management, deep foundations, retaining structures, a pedestrian bridge, drainage work, erosion and sediment controls, and restoration. SCHEDULE OF UNIT PRICES For St. Paul's Blue-Greenway - Stormwater Phase The unit prices have been computed in accordance with Paragraph 7.3.3.2 of the General Conditions of the Contract for Construction (as amended). Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents. The prices quoted shall include, without exception, all materials, labor, equipment, appliances, clean-up, applicable sales, use and other taxes, building permits or fees, and the Contractor's labor, overhead, profit, mobilization, and other mark-ups, and in full accordance with the Specifications. Include allowance for waste where appropriate. The unit prices shall be maintained throughout the contract period. Unit prices shall be used in determining additions or deductions from the TOTAL CONTRACT AWARD amount in the event of changes in the work. Mobilization and Demobilization Construction Surveying Silt Fence Inlet Protection Outlet Protection, VDOT Standard EC-1 Construction Entrance Temporary Dewatering Structure Temporary Sediment Basin A Flow Bypass Operations Temporary Seeding Erosion Control Matting, Jute EC-2 Tree Protection Demolish Asphalt Paving Demolish Concrete Paving Demolish Concrete (miscellaneous) Demolish Concrete Curb and Gutter Demolish Chain Link Fence Demolish Goal Post Demolish Tree Demolish Sanitary Sewer Piping Demolish Hot and Cold-Water System Piping Demolish Water Piping Demolish Storm Drain Piping Demolish Storm Drain Structure Demolish Storm Drain Flared End Section and Outlet Protection Cap Utility Demolish Box Culvert Complete Demolish Box Culvert General Abandon Box Culvert Timber Pile Removal Regular Excavation and Disposal Select Material, VDOT Type II Slope Protection Rip Rap Storm Drain Manhole (5’ Diameter) Storm Drain Manhole (8’ Diameter) Standard Grate Inlet 18” RCP 24” RCP 30” RCP Affidavit (Form of Bid, Page 1.3-4) Please upload a certified copy of the Affidavit with the Form of Bid, page 1.3-4 . The successful apparent low bidder, plus 2nd and 3rd placed bidders shall MAIL the Affidavit certified no later than the bid date. Failure to provide an original Affidavit matching the electronic Affidavit accompanying the bid may be grounds for debarment from future bidding. Project Details Important Bid Details Work to be Substantially Completed in: 360 calendar days Liquidated Damages: one thousand two hundred dollars ($1,200.00) per day Performance Bond: one hundred percent (100%) Payment Bond: one hundred percent (100%) Bid Bond: five percent (5%) Closing Date/Time: Friday, December 18, 2026 4:00 pm Partial funding for the project is being provided by the Land and Water Conservation Fund of the National Park Service administered in Virginia by The Department of Conservation and Recreation and must be undertaken in accordance with the Land and Water Conservation Fund guidance of the NPS, 2, 36, and 43 CFR, and the Build America, Buy America Acts. This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget’s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022. Physical Correspondence All physical correspondence will be sent to the address shown below and include the Project ID and Project Title. Ken Peacock , Design & Construction Contracting Specialist Project - 19263 : St. Paul's Blue-Greenway - Stormwater Phase City of Norfolk, Public Works 810 Union St, 7th Floor Norfolk VA, 23510 Plan Holders List / Project Followers Upon request, contact Ken Peacock at kenneth.peacock@norfolk.gov . Please also check the Followers Tab on this e-Procurement Portal. Other Methods to Receive Bidding Documents Bidding Documents are available from the Department of Public Works at no cost by download at https://procurement.opengov.com/portal/norfolk/projects/308994 or from the City of Norfolk’s website, http://www.norfolk.gov/bids.aspx . A Bid Bond, certified check, or cashier’s check made payable to the Treasurer, City of Norfolk, for five percent (5%) of total bid must accompany each bid. Offerors shall upload a copy of the bid guarantee with the Offeror’s acknowledgement to mail the original sealed document to the Owner, within two (2) business days. State Contractor registration class and number is required by electronic bidding via the Vendor Questionnaire. The City reserves the right to cancel the bid opening or to reject any or all bids in whole or part, when it is in the best interest of the City. The right to waive informalities and to determine responsiveness of any bid and responsibility of all bidders is reserved to the City. Withdrawal of bids will be in accordance with Section 33.1-42.1 of the Norfolk City Code and Section 11-54 of The Code of Virginia, 1950 (as amended). Introduction Summary Background Contact Information Timeline Vendor Questionnaire Unit Price Bid Bid Award shall be based on the lowest responsive and responsible Total Bid regardless of whether the City elects to award any or all of the Add Alternates. Attachments
Published attachments
Addenda and notices
Addendum #1 · 1
ADDENDUM NO. 1 Dated: November 13, 2026 19263 - St. Paul's Blue-Greenway - Stormwater Phase Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (1) page. ITEM NO. DESCRIPTION FRONT END RFI Due Date: RFI / Q&A has been extended to Friday, November 20, 2026. Response Due Date: Response Due Date has been extended Friday, December 18, 2026. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Kyle Quick , PE, PG Issued by: Ken Peacock, Design & Construction Contracting Specialist
Addendum #2 · 2
ADDENDUM NO. 2 Dated: November 13, 2026 19263 - St. Paul's Blue-Greenway - Stormwater Phase Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of two (2) pages. ITEM NO. DESCRIPTION FRONT END – Form of Bid Delete Bid Item #63 – Timber Pile Removal, As Needed Add bid Items: #63 – Baseline Project Schedule #64 – Progress Schedule Updates #65 – Contaminated Soil Treatment and disposal as Hazardous Waste #66 – Contaminated Soil Treatment and disposal as Non-Hazardous Waste BACK END / TECHNICAL SPECIFICATIONS / DRAWINGS Technical Specifications – The following specification sections shall be replaced with technical specification sections included with this Addendum. 01 27 00 Measurement and Payment The included specification section has all revisions clouded. Technical Specifications – The following specification sections are added to the bid documents with this Addendum. 02 61 00 Contaminated Soils 31 09 13 Survey and Vibration Monitoring Drawings – The following drawings shall be deleted: LJ-101, LJ-102, LJ-103, LJ-104, LJ-105, LJ-106, LJ-109, LJ-110, LJ-111, LJ-112, LJ-116, LJ-117, LJ-118, LJ-119, and LJ-120. And replaced with the drawings included with this Addendum: LJ-101, LJ-102, LJ-103, LJ-104, LJ-105, LJ-106, LJ-107, LJ-108, LJ-109, LJ-110, LJ-111, LJ-112, LJ-113, LJ-114, and LJ-115. The included drawings have all revisions clouded with changes indicated and dated 10/28/2026 in the revision block. Appendix C – Interim Milestone Completion Date was corrected from October 1, 2026, to October 1, 2027. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Kyle Quick , PE, PG Issued by: Ken Peacock, Design & Construction Contracting Specialist
Addendum #3 · 3
ADDENDUM NO. 3 Dated: November 20, 2026 19263 - St. Paul's Blue-Greenway - Stormwater Phase Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of one (2) pages. ITEM NO. DESCRIPTION FRONT END – Form of Bid Corrected Quantity for Bid Item #63 to 1 LS versus 50 LS Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Ken Peacock, Design & Construction Contracting Specialist Issued by: Ken Peacock, Design & Construction Contracting Specialist Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4 · 4
ADDENDUM NO. 4 Dated: November 24, 2026 19263 - St. Paul's Blue-Greenway - Stormwater Phase Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of five (5) pages. ITEM NO. DESCRIPTION Pre Bid Meeting/ Meeting Minutes See attached meeting minutes. Receipt of this addendum shall be acknowledged on page 1.3-1 of the Bid Form Prepared by: Katelyn Kroboth, Design & Construction Contracting Specialist Issued by: Katelyn Kroboth, Design & Construction Contracting Specialist
Public questions and answers
We request that the bid due date be extended to December 16th or December 17th so that it does not fall on Monday, December 14. It can be very difficult to get subcontractors and suppliers to furnish their quotes in a timely manner coming off a weekend (i.e., on a Monday) which adversely impacts timely completion of the Contractor’s bid.
The bid due date has been extended. Refer to Addendum No. 1 and the revised solicitation posting. Bids are now due no later than 4:00 PM (EST) on Friday, December 18, 2026.
Please consider extending the Pre-Bid question deadline from November 13 to November 20. This will provide more time for Contractor’s to review the bid documents so that any potential conflicts or ambiguities can be resolved by the Owner before the bid date, especially since an Addenda is still forthcoming.
The bid question deadline was extended to Friday, November 20. Refer to Addendum No. 1 and the revised solicitation posting.
Appendix C indicates that the Interim Milestone Completion Date is October 1, 2026. Please revise this date.
Appendix C was updated in Addendum 2 to reflect the correct Interim Milestone Completion Date of October 1, 2027.
Please provide as-built drawings of the existing box culvert.
The City does not have as-built drawings of the existing box culvert available for distribution. Due to the age of the structure, as-built records are not available.
Please provide electronic CAD files of the plan sheets to facilitate earthwork quantity calculations.
Electronic CAD files are not being distributed during the procurement process. The files will be provided to the successful Contractor after award of the contract, subject to execution of the City's standard data release agreement.
There are two different bid items for timber pile removal, Bid Item No.’s 30 and 63. Please clarify the distinction between the two in terms of when each bid item is applied for payment purposes.
Refer to Addendum No. 2. The original Bid Item No. 63, [Timber Pile Removal, As Needed], was consolidated with Bid Item No. 30, [Timber Pile Removal]. The current pay item descriptions and bid quantities are reflected in the latest Bid Schedule issued by addenda.
Instructions To Bidders, Section No. 5 (Bid Guarantee) requires that “offerers” shall upload a copy of the bid guarantee with the (electronic) bid and provide acknowledgement to mail the original sealed document to the Owner. The Invitation For Bids (dated October 15, 2026) adds that the original sealed document must be mailed by “offerers” within 2 business days. Section No. 5 (Bid Guarantee) further states that “apparent low bidder” shall provide original bid security to the City within 2 business days. Please clarify if original bid guarantee must be provided by all “offerers” or only by the “apparent low bidder” and clarify whether this must be mailed (or hand delivered) two days before the bid date or within two days after the bid date.
The digital copy of the Bid Bond / Guarantee must be uploaded with the response. Physical copies of this bond must be mailed within 2 days of the bid closing by all bidders.
Please consider removing the reference to coverage for “mischief and vandalism” in AIA A201 General Conditions of the Contract for Construction Section 11.1.1 and adding the requirement for “mischief and vandalism” coverage to Section 11.1.6 since this type of coverage is not usually included under liability policies but is instead covered under property insurance policies.
The AIA A201 terms will remain as is. These terms have been written to the requirements of the City and approved by the City's Attorneys Office.
Please consider revising AIA A201 General Conditions of the Contract for Construction Section 11.1.1.4 to read “Environmental Impairment Pollution Liability Insurance” and to establish a $1,000,000 per occurrence and aggregate policy limit and remove “will be determined by the City”.
The AIA A201 terms will remain as is. These terms have been written to the requirements of the City and approved by the City's Attorneys Office.
Please consider revising AIA A201 General Conditions of the Contract for Construction Section 11.1.1.3 to remove the sub-limits associated with auto liability (Bodily Injured and Property Damage) to align with the Combined Single Limit policy terms.
The AIA A201 terms will remain as is. These terms have been written to the requirements of the City and approved by the City's Attorneys Office.
Please consider establishing individual unit price bid items for: root pruning (by each), tree pruning (by each), tree protection fencing (by LF), and mulch (by SY) to facilitate quantity changes made by the Owner during construction.
The City will not be adding the requested bid items. Bidders shall base their bids on the bid items included in the latest Bid Schedule issued through addenda.
Technical Specification Sections 01 45 10 and 03 30 00 requires that the Contractor retain the services and pay the cost for an Independent Testing Agency for required field tests. There is no discussion within the Technical Specifications regarding Quality Assurance personnel. Please confirm that the Contractor is not required to staff the project with a dedicated full-time Quality Assurance representative and that daily construction inspection services will be provided by the Owner or the Owner’s representative.
Confirmed. The Contractor is not required to provide a dedicated full-time Quality Assurance (QA) representative for this project. Daily construction inspection services will be provided by the Owner or the Owner's representative. The Contractor shall provide all required Quality Control (QC) testing and inspections in accordance with the Contract Documents, including, but not limited to, concrete field and compressive strength testing, soils testing, and other construction materials testing specified in the Contract Documents.
Please confirm that the Contractor is not required to furnish a field office for the Owner’s use.
Confirmed. The Contractor is not required to furnish a field office for the Owner's use.
Addendum 2 established a new Bid Item No. 63 (Baseline Project Schedule) as a LS item but with a quantity of 50. Please revise the quantity to 1 (one) to correspond to a LS item by reissuing the Schedule of Unit Prices.
Corrected in Addendum 3.