The Stegall Substation Stage 07 Phase 01 Project (Equipment Replacements and Upgrades) replaces end of life equipment and installs a new control building. Replaced equipment shall include the 1960s era control building, 30+ disconnect switches, problematic brown glass insulators, main bus reconductor and rating increase, 2-115kV oil circuit breakers, replace 1990s vintage GE D20 RTU with three SEL RTACs, and add transfer bus dead end structure between 230kV east and west interconnect.
ENERGY, DEPARTMENT OF is actively seeking qualified contractors for power and communication line and related structures construction with a set-aside for Small Business businesses in LOVELAND, CO. This set-aside designation means eligible businesses face reduced competition from larger firms.