The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. 5.3.4 Demo existing piping 5.3.5 Run new Pex piping to the in-row coolers. 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. 5.3.7 Existing 3 Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feede
The Department of DEFENSE is actively seeking qualified contractors for all other miscellaneous electrical equipment and component manufacturing with a set-aside for Small Business businesses in CHEYENNE, WY. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts