DEPT OF DEFENSE
- Posted
- Nov 4, 2026
- Due
- Not specified
- NAICS
- 333618
This notice records an award. Find active opportunities
DEPT OF DEFENSE awarded this contract to FAIRBANKS MORSE, LLC for $3,404,927 on November 3, 2026, as part of federal procurement initiatives.
This award is part of federal acquisition procurement activities.
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
MIRA MAJE Brown
Primary contact
Kristin Liljestrom
Secondary contact
This is the history collected by Gov Contract Finder. Times show when information was captured or a version was assembled, not when SAM.gov originally changed it. Earlier revisions may be missing.
Publications are grouped by matching evidence; revision relationships are inferred.
The original SAM.gov root publication has not been verified.
Opportunity version
Initial information
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Solicitation: N5523626R0009
Publication: 58fd304c458e4c4cb46ce54d5bc6c92d
Current publication
Changed fields: Description
First established information: Description
Opportunity version
New opportunity observed
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Solicitation: N5523626R0009
Publication: 58fd304c458e4c4cb46ce54d5bc6c92d
Current publication
Changed fields: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, Award$, AwardAmount, AwardDate, AwardNumber, Awardee, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PopStreetAddress, PopZip, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, descriptionUrl, fullParentPathCode, fullParentPathName, groupingConfidence, logicalOpportunityId, naicsCodes, pointOfContact, resourceLinks, samNoticeId, samRootId, solicitationNumber, source, sourceResourceCount, sourceResourceIds
Opportunity capture
Initial information
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Solicitation: N5523626R0009
Publication: 58fd304c458e4c4cb46ce54d5bc6c92d
Current publication
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE
DEPT OF DEFENSE