The contractor shall provide labor, equipment, and materials needed to efficiently complete all work in accordance with this scope of work, the attached drawings, the specifications, and all other contract documents and requirements. The result will be an upstream embankment free of debris at the John Redmond Dam Embankment. The earth-fill dam embankments are protected by rip rap on the upstream face. Debris (trees, limbs, trash, etc.) accumulates on the upstream side of the dam embankments during periods of high water. The removal of this debris is to be completed without the movement/impacts/displacement of the protective rip rap through the proposed process. CLIN 0001 Bid Item J-1: John Redmond Reservoir Upstream Dam Embankment Debris Removal and Disposal. Located approximately 5 miles
The Department of DEFENSE is actively seeking qualified contractors for other waste collection in TULSA, OK.
Looking for more opportunities?
Browse our full directory of government contracts