Description
The Work generally consists of: Demolition and removal of the existing sinks, faucets, toilets, urinals, toilet partitions, countertops, and light fixtures; installation of new commercial-grade, water-conserving lavatories, toilets, urinals, and flush valves; new solid plastic or phenolic toilet partitions and urinal screens; new solid-surface or quartz countertops; new damp-rated LED lighting with occupancy controls; and surface preparation and painting of walls, ceilings, doors, and frames with a moisture-resistant coating system. The Work also includes demolition and installation of drywall, framing, and associated finishes, as well as the remodeling of the existing trellis structure and the replacement and installation of water heaters. Base Bid Items Mobilization & Demobilization (5% maximum of Total Base Bid) Demo all existing items shown on plans Plumbing Complete Construct Std. Showers Complete Construct ADA Showers Complete Install all Electrical Complete Paint & Epoxy Coatings Fixtures & Finishes (Counters, mirrors, dispensers, grab bars, seats, hand dryers, etc.) Exhaust/Venting Partitions & Misc. Curtains Trellis Structure Remodel Project Close out Alternate Bid Item Mobilization & Demobilization for Family Restrooms (5% maximum of Total Base Bid) Demo all items necessary to complete Family Restroom Construct Family Restroom Complete Project Close out for Family Restrooms Introduction Summary Background Contact Information Timeline Vendor Questionnaire Pricing Proposal Please refer to "Description of Bid Items" in the RFB document, for a detailed explanation of each line item. Document Uploads
Published attachments
Addenda and notices
Official Notice #1: Wave Waterpark Restroom Remodel Project Pre-Bid Sign-In Sheet · 1
Attached is the Wave Waterpark Restroom Remodel Project Pre-Bid Sign-In Sheet.
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. Please see attachment.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum. Deadline to submit bids has been extended to 8:00 AM on Monday November 23, 2026.
Public questions and answers
Please see section 23 of the RFP. Please advise if there is a veteran owned Preference for this project.
Yes, Veteran-owned business entity preference applies to this RFB.
There is no plan Set in the provided Documents, please advise if there is plan set for the proejct.
Please refer to Appendix B in the RFB Document.
What license is required.
Please refer to the RFB documents for the required contractor license(s).
Page P001 Pipe Schedule and Material indicates that PEX Water Piping is an approved equal if sized by the PEX manufacturer and approved by jurisdictions. Please clarify that PEX Water Piping that if sized correctly is approved by the responsible jurisdictions..
Confirmed.
Page P001 Pipe Schedule and Material detail indicates that PVC/ABS pipe and fittings may be used. Please clarify that PVC/ABS can be used where applicable.
Confirmed.
Will the City accept references for commercial/private-sector projects of comparable size, scope, and complexity, completed as the general/prime contractor, in place of the public-agency references requested on Page 34?
Bidders shall prepare and submit their bids in accordance with the requirements set forth in the RFB documents.
Reference: Notice Inviting Bids, Section 5; Instructions to Bidders, Section 14 The project is open to Class B General Building Contractors, while Section 14 requires the prime contractor to self-perform at least 50% of the adjusted non-specialty Contract Price with its own personnel. Please confirm whether the City intends to waive or modify this requirement for a Class B prime contractor that coordinates appropriately licensed trade subcontractors on this multi-trade renovation. If the requirement remains applicable, please identify whether any particular bid items must be performed by the prime rather than subcontracted, specify which onsite own-force work qualifies, and provide the method for calculating the adjusted 50% threshold. If an exception is intended, please issue an addendum expressly stating it.
Project specifications must be adhered to regarding the 50% performance with exception to bid items designated as Specialty Bid Items.
Reference: Architectural Drawing A1.0.0, Project Team; Notice Inviting Bids, Section 5 The Project Team information on drawing A1.0.0 identifies ICCS, LLC in the “Contractor” field, while the solicitation requests competitive bids from Class B General Building Contractors. Please clarify whether this designation relates to an earlier design, permit or preconstruction phase only, and confirm that ICCS, LLC has not already been awarded the general construction contract for the scope now being bid. Please confirm that award remains open to all qualified, responsive Class B bidders. If ICCS, LLC has a separate existing contract or scope at this site, please identify that scope and its interface with this solicitation, and correct or clarify the drawing by addendum.
Confirmed, the award remains open to all qualified, responsive Class B bidders. ICCS will perform the Construction Management on the project for the City of Vista.
Page P101 indicates new waste and vent piping for both men's and women's restrooms. The demolition of floors and walls is not found on the architectural demolition pages.. Please provide a demolition drawing for these two bathrooms.
New piping is only proposed for the family restrooms, shower drains and relocated showers.
Page P-201 shows single line diagram of water piping overhead. Please confirm that all of the water piping in both men's and women's rooms will be new piping. Please confirm that all ceilings will be removed to allow for the installation of the water piping
The connections from the water heater to the existing water distribution system are shown schematically to illustrate the intended connections. New water piping is proposed only where new connections are required as listed above. All existing fixtures are to be replaced but no water piping is to be replaced except as listed below. New fixture locations identified above will have new water piping per the drawings. The contractor should verify the condition of the existing piping in the field to confirm that it is suitable for reuse or if replacement is necessary. The plans have been updated in regard to the demolition note. Only ceilings requiring removal are where required to replace lighting and sprinkler heads or to facilitate new water to the new fixtures.
P 301 shows new 1/2" MPG installed to both men's and women's rooms. Please clarify if this piping is install below grade or above grade. Please confirm that all demolition that will be required is shown on the demolition drawings.
The new MPG is to upsize the service the new water heater outside of the women’s restroom. This is intended to be run underground outside of the building or overhead inside the building as the contractor deems feasible. The exact routing must be determined in the field. There is no underground trenching or demo expected inside the building or in the locker rooms for this scope of work. Please advise when a routing is determined by the installing contractor.
Per P001 and the Overall Plumbing Fixture Unit Counts for Women’s and Men’s restroom the following fixtures are being required to be replaced ; mop sink public (mb-e), service sink (ss-e), drinking fountain (DF-e), and Floor drain FD-e However per the plumbing fixture schedule these fixtures are not listed Please provide make and model for the above fixtures if they do need to be replaced
Not replacing mop sinks, service sinks drinking fountains or any floor drains that are not shower drains.
Please confirm existing toilets and urinals have a carrier system in the wall. Confirm if all the existing carriers are being replaced.
No carriers are intended to be replaced.
Confirm the existing water heater in the Men’s Restroom remains as is.
Confirmed.
Confirm the existing floor drains in both restrooms are to remain as is. If not, are the bidders to include replacing floor drain tops?
Floor drains are not intended to be replaced but replacement of the drain tops is requested.
Confirm we are reconnecting onto the existing branches off the water main that are feeding the existing restroom and existing fixtures.
No new piping to existing fixture locations. Only newly added locations.
Drawing A001 requires the GC to assess the existing conditions for mold and asbestos before demolition. Has the City completed any hazardous-material surveys? If so, please provide the reports. If asbestos, lead, or mold is discovered, please confirm whether abatement is included in the base bid or will be handled separately. Thank you.
No survey has been completed. If asbestos, lead, or mold is discovered it will be handled as a change conditions.
Please confirm the extent of work required for the existing fire alarm and sprinkler systems. Are there existing system drawings available? If so, could these be provided, so the contractor can determine the required modifications? Thank you.
No drawings are available at this time.
Please confirm the required warranty period for the Contractor's labor and workmanship, separate from the special manufacturer warranties listed in Section 01 77 00.
All portions of the specifications apply.
Demo Sheet A001 KN 9 remove structural or masonry elements. Please identify areas
None are indicated to be removed. No scope to identify
It was mentioned during the walk that the water heaters are being deleted, please update
No water heaters will require replacement.
It was mentioned during the walk that drinking fountain scope is being removed, please update
Correct. Existing drinking fountains to remain.
Please provide structural for the (2) trellis concrete bases with steel
Replace concrete around steel only. No structural rework. Please bid per plan to replace two existing concrete column bases. All others will remain in place.
All Trellis's have electrical mounted to the wood wrapped posts. I the electrical safe off, removal for re-installation, storage, and re-installation part of this projects scope?
If removal or relocation is required to accommodate metal improvements it should be included in the scope of work and price submitted. No additional cost will be allowed.
Reference: Drawing A100, Floor Plan General Note 8; Specification Section 09 91 00, Paragraphs 1.01 and 1.02.B; Drawing A101. General Note 8 requires the painting contractor to verify paint locations and colors with the Owner and Architect before application. Specification Section 09 91 00 also requires verification with the Engineer. Please confirm that the painting locations and extents identified in the bid documents establish the required scope for bidding, and that subsequent verification is intended to address final colors, finishes, and application locations within that defined scope. If additional surfaces or changes to the painting limits may be directed after award, please clarify how such changes will be addressed contractually. Please also confirm which party has final authority to approve paint locations and colors.
Paint locations and extents identify the scope for bidding purposes. Paint colors to be confirmed by the owner during the submittal process.
Please show location of existing Panel A and new location of panel A1
Panel A1 shall remain at its current locations.
May I please have the sign in sheet for the mandatory job walk?
Sign-in sheet is attached to Notice #1.
Per Section 14. on the RFP, Speciality Items are as shown on the Bid Schedule with an (S) in the Item. Please confirm all of the line items which are included in this do not count towards the total Contract value by the contractor must perform 50% with its own entity.
Please see addendum, See revised bid items designated with as (S) Specialty Bid Items.
Please confirm if the liquidated damages are $500.00 per consecutive work day or $2000.00 per working day. The Documents are unclear if one replaces the other.
See revised language in addendum.
Please provide all make and model numbers of all plumbing fixtures scheduled to be removed and replaced.
Please see Addendum.
Key Notes Plumbing Fixtures Note 6 indicates for new floor drains at all showers. The demolition plans do not show the shower floor to be demolished. Is the intent to just replace the strainer? If not please show the shower floor being demolished and provide a make and model number for the drains.
The revised addendum plans have been updated to show removal of the floors in the showers and family restroom and the plumbing drawings have been updated to specify the new shower drains.
Reference: Drawing A101, Finish Legend; Technical Specifications Sections 09 30 00, 09 67 23, 09 91 00 and 10 28 00 The Technical Specifications provide general material/performance criteria and acceptable manufacturers for CT01–CT03 tile, TB01 tile base, CT04 resinous flooring, PT01/PT03 coating systems, and restroom accessories including mirrors. However, final colors, specific products/models and some sizes or patterns are left to the Engineer's selection. To provide a common and comparable pricing basis, please issue a finish/product schedule specifying the selected manufacturer, model, dimensions, color and pattern for each applicable finish and accessory. Alternatively, please provide uniform material-only allowances by square foot or each for these items. Please clarify whether PT02 is an applicable finish designation. If any material is owner-furnished, identify it expressly; otherwise confirm bidders are to include furnishing and installation and state how post-bid selections exceeding the prescribed basis are addressed.
This is in addendum drawings and material schedule.
Reference: Supplementary General Provisions, Section 6-9 Section 6-9 states that liquidated damages are five hundred dollars ($500.00) per consecutive working day after the adjusted completion date. The following paragraph of the same subsection states two thousand dollars ($2,000.00) per working day. Please confirm the controlling daily liquidated-damages amount.
See revised language in addendum.
Reference: Instructions to Bidders, Section 14; Bid Schedule, Item 11 Base Bid Item 11, “Trellis Structure Remodel,” is not marked as a Specialty Item and includes structural repair, wood work, metal and finish components. Please confirm whether the prime contractor may subcontract this item, in whole or in part, to appropriately licensed trade contractors. If so, please confirm whether the subcontracted value must be counted as non-specialty subcontract work in determining the Section 14 own-force percentage, and whether any components are eligible to be treated as designated specialty work. Please identify any portion of the trellis remodel that the City specifically requires the prime contractor to self-perform.
See revised bid items designated with as (S) Specialty Bid Items
Reference: Instructions to Bidders, Section 14 — Contractor's Required Share of Contract Work; Bid Schedule, Base Bid Items 3–6 and Alternate Bid Item 15 The Base Bid Schedule identifies the following items as Specialty Items with an “S” designation: Item 3 (S): Plumbing Complete Item 4 (S): Construct Standard Showers Complete Item 5 (S): Construct ADA Showers Complete Item 6 (S): Install All Electrical Complete However, Alternate Bid Item 15 — Construct Family Restroom Complete is not designated as a Specialty Item, despite including plumbing, electrical, shower construction, waterproofing, finishes, and other scopes substantially similar to those identified as specialty work under Base Bid Items 3–6. Section 14 also requires the prime contractor to self-perform at least 50% of the adjusted Contract Price, excluding qualifying subcontracted Specialty Items. To ensure all bidders understand and consistently apply these requirements, please clarify the following: Specialty Work Classification: Please confirm whether plumbing, electrical, shower construction, waterproofing, and other specialty trade work included within Alternate Bid Item 15 are considered Specialty Items, consistent with the designations provided for Base Bid Items 3–6. Self-Performance Requirements: Please identify the specific portions of Alternate Bid Item 15, if any, that the City requires the prime general contractor to perform using its own employees rather than licensed subcontractors. Subcontracting: P
See revised bid items designated with as (S) Specialty Bid Items.
Reference: Construction Contract, Sections 1–4; Bid Schedule, Pages 28–30; Supplementary General Provisions, Section 7-3.2 The bid documents include a Construction Contract and Bid Schedule containing both lump-sum (LS) and unit-priced (EA) items. Section 3 of the Construction Contract references compensation based on units of work actually performed. Please confirm that the City intends to award this project under a fixed-price, lump-sum construction contract, with the accepted Base Bid establishing the total contract amount for the complete scope of work. Please further confirm that the individual Bid Schedule items are intended to establish a breakdown of the total contract value for bidding, progress payments, and change-order administration, rather than establishing a unit-price contract subject to remeasurement of actual quantities. If any bid items will be compensated based on actual quantities performed rather than their original bid amounts, please identify those items and clarify the applicable measurement and payment procedures. Please provide clarification so all bidders understand the intended contract structure and pricing requirements.
Bidders must adhere to the project specifications. The contract award will be structured to include all bid items. A schedule of values will be required by the awarded contract for all lump sum items to facilitate payment applications.
Page P001 Pipe Schedule and Material detail indicates that PVC/ABS pipe and fittings may be used. Please advise where PVC/ABS can be used and where Cast iron can be used. Can ABS PVC be used below and above grade for DWW Will Cast iron pipe and fittings be required below grade and above grade for DWV
This has been updated in the addendum drawings. ABS or PVC can be used per the specifications.
Per sheet A201, the new showers are tile, new toilet is wall hung and new sinks are installed with countertop. Per sheet P001, the plumbing fixtures called out conflicting fixtures (floor mounted toilet, shower pan system, and wall hung sink and handle type faucet). The new wall behind the toilet may not be large enough for a carrier. Please advise with the final selections.
This has been updated in the addendum drawings.
A101 - BN01 Specialty Benches in changing area are TBD material and finish. Please provide a spec.
See material schedule, in Addendum #1.
Please provide a wall schedule for the new walls
This is included on addendum drawings.
Reference: Specification Section 09 91 00, Part 2, Paragraph 2.01.A, Pages 42–43. The coating schedule requires a clear, non-sacrificial, graffiti-resistant coating on painted walls within reach of the public, including interior areas and entries. Please clarify the required extent of this coating. Specifically: Is the coating required over the full height of all applicable painted walls, or only to a designated elevation above the finished floor? Please identify which interior and exterior entry wall surfaces require the coating. If the coating is not required on all painted wall surfaces, please provide the applicable locations and limits on the drawings.
Addendum #1 has been posted, see material schedule and Section 09 91 00.
Reference: Specification Section 09 91 00, Paragraph 2.01.A, Coating Systems. The specifications require a clear, non-sacrificial, graffiti-resistant coating compatible with the specified wall finish systems. Please identify an acceptable basis-of-design manufacturer and product for this coating or confirm that contractors may propose equivalent products meeting the specified performance requirements. Please also clarify the required number of coats or minimum application thickness, if applicable, and confirm that the selected coating must be compatible with the PT01 water-based catalyzed epoxy wall finish.
Addendum #1 has been posted, see material schedule and Section 09 91 00.