This is a Design-Bid-Build Construction project to provide an installation-level microgrid at Fort Buchanan consisting of approximately 8 MW of new diesel generators and 4 MWh battery energy storage system (BESS), as an option. In addition, the project will install a microgrid control system including, but not limited to, paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying and fiber optic communication connections. The project will install twelve 12,000-gallon above-ground, ballistic-resistant, diesel fuel tanks with a fuel polishing system to sustain critical operations continuously for 14 days. The microgrid will include integration of existing large-scale onsite generation (4.65 MW from solar photovoltaic (PV) array and two 275 kW wind turbines
The Department of DEFENSE está buscando activamente contratistas calificados para power and communication line and related structures construction con reserva para empresas Small Business en LOUISVILLE, KY. Esta designación de reserva significa que las empresas elegibles enfrentan menos competencia de empresas más grandes.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales