Work for this project requires the contractor to be responsible for for furnishing and supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized in the SOW: 1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect. 2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits. 3. Furnish and install microbubble lagoon aeration system consisting of the following: a. Control panel with individual motor overload protection circuit breakers. b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each). 4. Locate private and utility owned buried
AGRICULTURE, DEPARTMENT OF está buscando activamente contratistas calificados para sewage treatment facilities con reserva para empresas Small Business en Washington, DC. Esta designación de reserva significa que las empresas elegibles enfrentan menos competencia de empresas más grandes.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales