The purpose of this project is to upgrade and replace all Physical Access Control Systems (PACS), including door access control systems, intercom systems, and camera surveillance systems at two separate sites. The first site being Southeastern Power Administrations Main site and the second, Southeasterns Remote Operations Site. Ensuring compliance with FIPS 201 standards for identity authentication and Section 2 of the Secure Networks Act, which restricts certain telecommunications and surveillance equipment deemed as security risks. Surveillance cameras must provide high-resolution imaging, 24/7 monitoring capability, and secure data storage for a minimum of 30 days of video, ensuring compliance with Secure Networks Act-approved equipment lists. Southeastern intends to issue a firm-fixed-
ENERGY, DEPARTMENT OF está buscando activamente contratistas calificados para security systems services con reserva para empresas No Set Aside en ELBERTON, GA. Esta designación de reserva significa que las empresas elegibles enfrentan menos competencia de empresas más grandes.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales