The scope of this project includes removal and replacement of 136 individual pavement panels that measure 25 ft wide x 25 ft long x 24 inches deep, located at the intersection of the primary and secondary runways at Joint Base Charleston-Air Base. Replacement panels will be 25 ft wide x 25 ft long by 26 inches deep. All work will be during a 68-hour period between approximately 2300 hrs to 0700, Thursday through Monday. It is anticipated that the process will involve 3 primary activities each night, saw cutting, removal and installation of temporary panels, and placement of permanent panels. Each permanent panel will be constructed from fast setting concrete, capable of achieving aircraft traffic strength during a 34-hour cure period. The runway intersection shall open for daily aircraft t
The Department of DEFENSE está realizando investigación de mercado para identificar fuentes potenciales para highway, street, and bridge construction con reserva para empresas No Set Aside en JOINT BASE CHARLESTON, SC. Responder a este aviso ayuda a asegurar que su empresa sea considerada para la solicitud eventual.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales