The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full replacement of the entire Fire Alarm Reporting System for various facilities. The work shall include but not be limited to the replacement of Fire Alarm Control Panel, conduit where needed, wire, and all existing devices in the facilities listed below. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references. This is a sources sought and for market research purposes only. No award will be made off this posting.
The Department of DEFENSE está realizando investigación de mercado para identificar fuentes potenciales para security systems services (except locksmiths) con reserva para empresas Small Business en COLUMBUS, MS. Responder a este aviso ayuda a asegurar que su empresa sea considerada para la solicitud eventual.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales