The Trapper Creek Job Corps Center has identified the need for asbestos remediation in mechanical and storage rooms in dormitory buildings 10, 11, 12, 13 after a site inspection finding of asbestos tile underneath the current carpet tiles. After remediation, new resilient vinyl sheet flooring is to be installed. To fully access the floor, the existing water heaters and furnace units will have to be uninstalled prior to removal and reinstalled after the new flooring has been laid. The need for mold remediation has also been identified in building 11 (dorm 2). The plumbing leaks that caused the mold issue have already been addressed and the wall opened up, but remediation in the wall, on the floor, and in the crawlspace is still required. After remediation new gypsum board also needs to be i
AGRICULTURE, DEPARTMENT OF está buscando activamente contratistas calificados para remediation services con reserva para empresas Small Business en Washington, DC. Esta designación de reserva significa que las empresas elegibles enfrentan menos competencia de empresas más grandes.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales