The contractor is responsible for delivering all materials, labor, tools, equipment, transportation, and supervision required to complete the installation in a single phase to minimize facility downtime. All design and construction must comply with Laughlin AFB Division 01 Specifications, Environmental Contractor Technical Specifications, UFC 1-200-01 (DoD Building Code), and NFPA 70 (National Electrical Code). The technical execution requires a Stormwater Pollution Prevention Plan (SWPPP) to manage runoff and eliminate Foreign Object Debris (FOD). Physical works include trenching from the transformer to a distribution rack positioned ten feet behind it, followed by running 160 feet of overhead power lines on three newly installed utility poles (Poles #1, #2, and #3) to B504. These utility
The Department of DEFENSE is actively seeking qualified contractors for electrical contractors and other wiring installation contractors with a set-aside for Small Business businesses in LAUGHLIN AFB, TX. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts