Scope of Work (SOW) Lift Gate Installation for Sprinter Van Project Overview: The contractor shall provide all labor, materials, supervision, transportation, and equipment necessary to supply and install one (1) new 1,100-lb capacity hydraulic lift gate onto the designated Sprinter van. The installation must be conducted in accordance with all manufacturer specifications, safety standards, and applicable federal, state, and local regulations. Technical Requirements: Provide and install one (1) new rear-mounted hydraulic lift gate assembly. Minimum load capacity: 1,100 pounds. Lift gate must be compatible with the existing Sprinter van make and model. Provide all required hardware, wiring, brackets, hydraulic components, and fasteners. All electrical work shall comply with vehicle manufactu
VETERANS AFFAIRS, DEPARTMENT OF is conducting market research to identify potential sources for all other automotive repair and maintenance with a set-aside for SDVOSB businesses in RIDGELAND, MS. Responding to this notice helps ensure your company is considered for the eventual solicitation.
Looking for more opportunities?
Browse our full directory of government contracts