The work consists of furnishing all labor, materials, equipment, and incidentals necessary to rehabilitate the existing concrete marginal wharf at National City Marine Terminal (NCMT) Berth 24-11 and to reinstall the existing shore power system, as shown on the Contract Drawings and specified her
Small Business Administration (SBA) is seeking responses for site preparation contractors with a set-aside for Small Business businesses in CA. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts