Description: The Contractor shall demolish and replace sanitary piping within the 3rd and 5th floor interstitial spaces as detailed in the Technical Requirements section, project bid drawings and documents, and VHA Master Construction Specifications. Demolition and replacement of piping shall be according to detailed phasing plans developed by the Contractor and approved by the COR. All plumbing penetrations through fire-rated partitions or flooring shall be fire and/or smoke sealed according to UL requirements for the rated assembly, among other work items. Completion of this project will eliminate the risk of leaks and downtime by replacing failing sanitary utilities located above critical hospital services. Definitization of Equitable Adjustments: When/if change orders are issued under
VETERANS AFFAIRS, DEPARTMENT OF is actively seeking qualified contractors for water and sewer line and related structures construction with a set-aside for SDVOSB businesses in DAYTON, OH. This set-aside designation means eligible businesses face reduced competition from larger firms.
Looking for more opportunities?
Browse our full directory of government contracts