Description: The Contractor shall demolish and replace sanitary piping within the 3rd and 5th floor interstitial spaces as detailed in the Technical Requirements section, project bid drawings and documents, and VHA Master Construction Specifications. Demolition and replacement of piping shall be according to detailed phasing plans developed by the Contractor and approved by the COR. All plumbing penetrations through fire-rated partitions or flooring shall be fire and/or smoke sealed according to UL requirements for the rated assembly, among other work items. Completion of this project will eliminate the risk of leaks and downtime by replacing failing sanitary utilities located above critical hospital services. Definitization of Equitable Adjustments: When/if change orders are issued under
VETERANS AFFAIRS, DEPARTMENT OF está buscando activamente contratistas calificados para water and sewer line and related structures construction con reserva para empresas SDVOSB en DAYTON, OH. Esta designación de reserva significa que las empresas elegibles enfrentan menos competencia de empresas más grandes.
¿Buscas más oportunidades?
Explora nuestro directorio completo de contratos gubernamentales